The Project Gutenberg eBook of The New York Subway, Its Construction and Equipment

This eBook is for the use of anyone anywhere in the United States and
most other parts of the world at no cost and with almost no restrictions
whatsoever. You may copy it, give it away or re-use it under the terms
of the Project Gutenberg License included with this eBook or online
at www.gutenberg.org. If you are not located in the United States,
you will have to check the laws of the country where you are located
before using this eBook.

Title: The New York Subway, Its Construction and Equipment

Author: Interborough Rapid Transit Company

Release date: January 21, 2006 [eBook #17569]
Most recently updated: December 13, 2020

Language: English

Other information and formats: www.gutenberg.org/ebooks/17569

Credits: E-text prepared by Ronald Holder, Diane Monico, and the Project Gutenberg Online Distributed Proofreading Team

*** START OF THE PROJECT GUTENBERG EBOOK THE NEW YORK SUBWAY, ITS CONSTRUCTION AND EQUIPMENT ***

E-text prepared by Ronald Holder, Diane Monico, and the Project Gutenberg
Online Distributed Proofreading Team (https://www.pgdp.net/)

Note: Project Gutenberg also has an HTML version of this
file which includes the numerous original illustrations.
See 17569-h.htm or 17569-h.zip:
(https://www.gutenberg.org/dirs/1/7/5/6/17569/17569-h/17569-h.htm)
or
(https://www.gutenberg.org/dirs/1/7/5/6/17569/17569-h.zip)

Interborough Rapid Transit

THE NEW YORK SUBWAY

Its Construction and Equipment

[Illustration: OPERATING ROOM OF POWER HOUSE]

[Illustration: (I.R.T. symbol)]

New York
Interborough Rapid Transit Company
ANNO. DOMI. MCMIV
Copyright, 1904, by
Interborough Rapid Transit Co.
New York
Planned and Executed by The
McGraw Publishing Co.

[Illustration: (McGraw Publishing Company New York logo)]

TABLE OF CONTENTS

Page No.

INTRODUCTION, 13

CHAPTER I. THE ROUTE OF THE ROAD--PASSENGER STATIONS
AND TRACKS, 23

CHAPTER II. TYPES AND METHODS OF CONSTRUCTION, 37

CHAPTER III. POWER HOUSE BUILDING, 67

CHAPTER IV. POWER PLANT FROM COAL PILE TO SHAFTS OF
ENGINES AND TURBINES, 77

CHAPTER V. SYSTEM OF ELECTRICAL SUPPLY, 91

CHAPTER VI. ELECTRICAL EQUIPMENT OF CARS, 117

CHAPTER VII. LIGHTING SYSTEM FOR PASSENGER STATIONS
AND TUNNEL, 121

CHAPTER VIII. ROLLING STOCK--CARS, TRUCKS, ETC., 125

CHAPTER IX. SIGNAL SYSTEM, 135

CHAPTER X. SUBWAY DRAINAGE, 145

CHAPTER XI. REPAIR AND INSPECTION SHED, 147

CHAPTER XII. SUB-CONTRACTORS, 151

INTERBOROUGH RAPID TRANSIT COMPANY

_Directors_

August Belmont
E. P. Bryan
Andrew Freedman
James Jourdan
Gardiner M. Lane
John B. McDonald
Walter G. Oakman
John Peirce
Morton F. Plant
William A. Read
Alfred Skitt
Cornelius Vanderbilt
George W. Young

_Executive Committee_

August Belmont
Andrew Freedman
James Jourdan
Walter G. Oakman
William A. Read
Cornelius Vanderbilt

_Officers_

August Belmont, President
E. P. Bryan, Vice-president
H. M. Fisher, Secretary
D. W. McWilliams, Treasurer
E. F. J. Gaynor, Auditor
Frank Hedley, General Superintendent
S. L. F. Deyo, Chief Engineer
George W. Wickersham, General Counsel
Chas. A. Gardiner, General Attorney
DeLancey Nicoll, Associate Counsel
Alfred A. Gardner, Associate Counsel

_Engineering Staff_

S. L. F. Deyo, Chief Engineer.

_Electrical Equipment_

L. B. Stillwell, Electrical Director.
H. N. Latey, Principal Assistant.
Frederick R. Slater, Assistant Engineer in charge of Third Rail
Construction.
Albert F. Parks, Assistant Engineer in charge of Lighting.
George G. Raymond, Assistant Engineer in charge of Conduits and Cables.
William B. Flynn, Assistant Engineer in charge of Draughting Room.

_Mechanical and Architectural_

J. Van Vleck, Mechanical and Construction Engineer.
William C. Phelps, Assistant Construction Engineer.
William N. Stevens, Ass't Mechanical Engineer.
Paul C. Hunter, Architectural Assistant.
Geo. E. Thomas, Supervising Engineer in Field.

_Cars and Signal System_

George Gibbs, Consulting Engineer.
Watson T. Thompson, Master Mechanic.
J. N. Waldron, Signal Engineer.

RAPID TRANSIT SUBWAY CONSTRUCTION COMPANY

_Directors_

August Belmont
E. P. Bryan
Andrew Freedman
James Jourdan
Gardiner M. Lane
Walther Luttgen
John B. McDonald
Walter G. Oakman
John Peirce
Morton F. Plant
William A. Read
Cornelius Vanderbilt
George W. Young

_Executive Committee_

August Belmont
Andrew Freedman
James Jourdan
Walter G. Oakman
William A. Read
Cornelius Vanderbilt

_Officers_

August Belmont, president
Walter G. Oakman, vice-president
John B. McDonald, contractor
H. M. Fisher, secretary
John F. Buck, treasurer
E. F. J. Gaynor, auditor
S. L. F. Deyo, chief engineer
George W. Wickersham, general counsel
Alfred A. Gardner, attorney

_Engineering Staff_

S. L. F. Deyo, Chief Engineer.
H. T. Douglas, Principal Assistant Engineer.

A. Edward Olmsted, Division Engineer, Manhattan-Bronx Lines.

Henry B. Reed, Division Engineer, Brooklyn Extension.

Theodore Paschke, Resident Engineer, First Division, City Hall to 33d
Street, also Brooklyn Extension, City Hall to Bowling Green; and
Robert S. Fowler, Assistant.

Ernest C. Moore, Resident Engineer, Second Division, 33d Street to
104th Street; and Stanley Raymond, Assistant.

William C. Merryman, Resident Engineer, Third Division, Underground
Work, 104th Street to Fort George West Side and Westchester Avenue
East Side; and William B. Leonard, W. A. Morton, and William E.
Morris, Jr., Assistants.

Allan A. Robbins and Justin Burns, Resident Engineers, Fourth
Division, Viaducts; and George I. Oakley, Assistant.

Frank D. Leffingwell, Resident Engineer, East River Tunnel Division,
Brooklyn Extension; and C. D. Drew, Assistant.

Percy Litchfield, Resident Engineer, Fifth Division, Brooklyn
Extension, Borough Hall to Prospect Park; and Edward R. Eichner,
Assistant.

M. C. Hamilton, Engineer, Maintenance of Way; and Robert E. Brandeis,
Assistant.

D. L. Turner, Assistant Engineer in charge of Stations.

A. Samuel Berquist, Assistant Engineer in charge of Steel Erection.

William J. Boucher, Assistant Engineer in charge of Draughting Rooms.

[Illustration: (INTERBOROUGH RAPID TRANSIT)]

INTRODUCTION

The completion of the rapid transit railroad in the boroughs of
Manhattan and The Bronx, which is popularly known as the "Subway," has
demonstrated that underground railroads can be built beneath the
congested streets of the city, and has made possible in the near
future a comprehensive system of subsurface transportation extending
throughout the wide territory of Greater New York.

In March, 1900, when the Mayor with appropriate ceremonies broke
ground at the Borough Hall, in Manhattan, for the new road, there were
many well-informed people, including prominent financiers and
experienced engineers, who freely prophesied failure for the
enterprise, although the contract had been taken by a most capable
contractor, and one of the best known banking houses in America had
committed itself to finance the undertaking.

In looking at the finished road as a completed work, one is apt to
wonder why it ever seemed impossible and to forget the difficulties
which confronted the builders at the start.

The railway was to be owned by the city, and built and operated under
legislation unique in the history of municipal governments,
complicated, and minute in provisions for the occupation of the city
streets, payment of moneys by the city, and city supervision over
construction and operation. Questions as to the interpretation of
these provisions might have to be passed upon by the courts, with
delays, how serious none could foretell, especially in New York where
the crowded calendars retard speedy decisions. The experience of the
elevated railroad corporations in building their lines had shown the
uncertainty of depending upon legal precedents. It was not, at that
time, supposed that the abutting property owners would have any legal
ground for complaint against the elevated structures, but the courts
found new laws for new conditions and spelled out new property rights
of light, air, and access, which were made the basis for a volume of
litigation unprecedented in the courts of any country.

An underground railroad was a new condition. None could say that the
abutting property owners might not find rights substantial enough, at
least, to entitle them to their day in court, a day which, in this
State, might stretch into many months, or even several years. Owing to
the magnitude of the work, delay might easily result in failure. An
eminent judge of the New York Supreme Court had emphasized the
uncertainties of the situation in the following language: "Just what
are the rights of the owners of property abutting upon a street or
avenue, the fee in and to the soil underneath the surface of which has
been acquired by the city of New York, so far as the same is not
required for the ordinary city uses of gas or water pipes, or others
of a like character, has never been finally determined. We have now
the example of the elevated railroad, constructed and operated in the
city of New York under legislative and municipal authority for nearly
twenty years, which has been compelled to pay many millions of dollars
to abutting property owners for the easement in the public streets
appropriated by the construction and maintenance of the road, and
still the amount that the road will have to pay is not ascertained.
What liabilities will be imposed upon the city under this contract;
what injury the construction and operation of this road will cause to
abutting property, and what easements and rights will have to be
acquired before the road can be legally constructed and operated, it
is impossible now to ascertain."

It is true, that the city undertook "to secure to the contractor the
right to construct and operate, free from all rights, claims, or other
interference, whether by injunction, suit for damages, or otherwise on
the part of any abutting owner or other person." But another eminent
judge of the same court had characterized this as "a condition
absolutely impossible of fulfillment," and had said: "How is the city
to prevent interference with the work by injunction? That question
lies with the courts; and not with the courts of this State alone, for
there are cases without doubt in which the courts of the United States
would have jurisdiction to act, and when such jurisdiction exists they
have not hitherto shown much reluctance in acting.... That legal
proceedings will be undertaken which will, to some extent at least,
interfere with the progress of this work seems to be inevitable...."

Another difficulty was that the Constitution of the State of New York
limited the debt-incurring power of the city. The capacity of the city
to undertake the work had been much discussed in the courts, and the
Supreme Court of the State had disposed of that phase of the situation
by suggesting that it did not make much difference to the municipality
whether or not the debt limit permitted a contract for the work,
because if the limit should be exceeded, "no liability could possibly
be imposed upon the city," a view which might comfort the timid
taxpayers but could hardly be expected to give confidence to the
capitalists who might undertake the execution of the contract.

Various corporations, organized during the thirty odd years of
unsuccessful attempts by the city to secure underground rapid transit,
claimed that their franchises gave them vested rights in the streets
to the exclusion of the new enterprise, and they were prepared to
assert their rights in the courts. (The Underground Railroad Company
of the City of New York sought to enjoin the building of the road and
carried their contest to the Supreme Court of the United States which
did not finally decide the questions raised until March, 1904, when
the subway was practically complete.)

Rival transportation companies stood ready to obstruct the work and
encourage whomever might find objection to the building of the road.

New York has biennial elections. The road could not be completed in
two years, and the attitude of one administration might not be the
attitude of its successors.

The engineering difficulties were well-nigh appalling. Towering
buildings along the streets had to be considered, and the streets
themselves were already occupied with a complicated network of
subsurface structures, such as sewers, water and gas mains, electric
cable conduits, electric surface railway conduits, telegraph and
power conduits, and many vaults extending out under the streets,
occupied by the abutting property owners. On the surface were street
railway lines carrying a very heavy traffic night and day, and all the
thoroughfares in the lower part of the city were congested with
vehicular traffic.

Finally, the city was unwilling to take any risk, and demanded
millions of dollars of security to insure the completion of the road
according to the contract, the terms of which were most exacting down
to the smallest detail.

The builders of the road did not underestimate the magnitude of the
task before them. They retained the most experienced experts for every
part of the work and, perfecting an organization in an incredibly
short time, proceeded to surmount and sweep aside difficulties. The
result is one of which every citizen of New York may feel proud. Upon
the completion of the road the city will own the best constructed and
best equipped intraurban rapid transit railroad in the world. The
efforts of the builders have not been limited by the strict terms of
the contract. They have striven, not to equal the best devices, but to
improve upon the best devices used in modern electrical railroading,
to secure for the traveling public safety, comfort, and speedy
transportation.

The road is off the surface and escapes the delays incident to
congested city streets, but near the surface and accessible, light,
dry, clean, and well ventilated. The stations and approaches are
commodious, and the stations themselves furnish conveniences to
passengers heretofore not heard of on intraurban lines. There is a
separate express service, with its own tracks, and the stations are so
arranged that passengers may pass from local trains to express trains,
and vice versa, without delay and without payment of additional fare.
Special precautions have been taken and devices adopted to prevent a
failure of the electric power and the consequent delays of traffic. An
electro pneumatic block signal system has been devised, which excels
any system heretofore used and is unique in its mechanism. The third
rail for conveying the electric current is covered, so as to prevent
injury to passengers and employees from contact. Special emergency and
fire alarm signal systems are installed throughout the length of the
road. At a few stations, where the road is not near the surface,
improved escalators and elevators are provided. The cars have been
designed to prevent danger from fire, and improved types of motors
have been adopted, capable of supplying great speed combined with
complete control. Strength, utility, and convenience have not alone
been considered, but all parts of the railroad structures and
equipment, stations, power house, and electrical sub-stations have
been designed and constructed with a view to the beauty of their
appearance, as well as to their efficiency.

The completion of the subway marks the solution of a problem which for
over thirty years baffled the people of New York City, in spite of the
best efforts of many of its foremost citizens. An extended account of
Rapid Transit Legislation would be out of place here, but a brief
glance at the history of the Act under the authority of which the
subway has been built is necessary to a clear understanding of the
work which has been accomplished. From 1850 to 1865 the street surface
horse railways were sufficient for the requirements of the traveling
public. As the city grew rapidly, the congestion spreading northward,
to and beyond the Harlem River, the service of surface roads became
entirely inadequate. As early as 1868, forty-two well known business
men of the city became, by special legislative Act, incorporators of
the New York City Central Underground Railway Company, to build a line
from the City Hall to the Harlem River. The names of the incorporators
evidenced the seriousness of the attempt, but nothing came of it. In
1872, also by special Act, Cornelius Vanderbilt and others were
incorporated as The New York City Rapid Transit Company, to build an
underground road from the City Hall to connect with the New York &
Harlem Road at 59th Street, with a branch to the tracks of the New
York Central Road. The enterprise was soon abandoned. Numerous
companies were incorporated in the succeeding years under the general
railroad laws, to build underground roads, but without results; among
them the Central Tunnel Railway Company in 1881, The New York & New
Jersey Tunnel Railway Company in 1883, The Terminal Underground
Railway Company in 1886, The Underground Railroad Company of the City
of New York (a consolidation of the last two companies) in 1896, and
The Rapid Transit Underground Railroad Company in 1897.

All attempts to build a road under the early special charter and later
under the general laws having failed, the city secured in 1891 the
passage of the Rapid Transit Act under which, as amended, the subway
has been built. As originally passed it did not provide for municipal
ownership. It provided that a board of five rapid transit railroad
commissioners might adopt routes and general plans for a railroad,
obtain the consents of the local authorities and abutting property
owners, or in lieu of the consents of the property owners the approval
of the Supreme Court; and then, having adopted detail plans for the
construction and operation, might sell at public sale the right to
build and operate the road to a corporation, whose powers and duties
were defined in the Act, for such period of time and on such terms as
they could. The Commissioners prepared plans and obtained the consents
of the local authorities. The property owners refused their consent;
the Supreme Court gave its approval in lieu thereof, but upon inviting
bids the Board of Rapid Transit Railroad Commissioners found no
responsible bidder.

The late Hon. Abram S. Hewitt, as early as 1884, when legislation for
underground roads was under discussion, had urged municipal ownership.
Speaking in 1901, he said of his efforts in 1884:

"It was evident to me that underground rapid transit could
not be secured by the investment of private capital, but in
some way or other its construction was dependent upon the
use of the credit of the City of New York. It was also
apparent to me that if such credit were used, the property
must belong to the city. Inasmuch as it would not be safe
for the city to undertake the construction itself, the
intervention of a contracting company appeared
indispensable. To secure the city against loss, this company
must necessarily be required to give a sufficient bond for
the completion of the work and be willing to enter into a
contract for its continued operation under a rental which
would pay the interest upon the bonds issued by the city for
the construction, and provide a sinking fund sufficient for
the payment of the bonds at or before maturity. It also
seemed to be indispensable that the leasing company should
invest in the rolling stock and in the real estate required
for its power houses and other buildings an amount of money
sufficiently large to indemnify the city against loss in
case the lessees should fail in their undertaking to build
and operate the railroad."

Mr. Hewitt became Mayor of the city in 1887, and his views were
presented in the form of a Bill to the Legislature in the following
year. The measure found practically no support. Six years later, after
the Rapid Transit Commissioners had failed under the Act of 1891, as
originally drawn, to obtain bidders for the franchise, the New York
Chamber of Commerce undertook to solve the problem by reverting to Mr.
Hewitt's idea of municipal ownership. Whether or not municipal
ownership would meet the approval of the citizens of New York could
not be determined; therefore, as a preliminary step, it was decided to
submit the question to a popular vote. An amendment to the Act of 1891
was drawn (Chapter 752 of the Laws of 1894) which provided that the
qualified electors of the city were to decide at an annual election,
by ballot, whether the rapid transit railway or railways should be
constructed by the city and at the public's expense, and be operated
under lease from the city, or should be constructed by a private
corporation under a franchise to be sold in the manner attempted
unsuccessfully, under the Act of 1891, as originally passed. At the
fall election of 1894, the electors of the city, by a very large vote,
declared against the sale of a franchise to a private corporation and
in favor of ownership by the city. Several other amendments, the
necessity for which developed as plans for the railway were worked
out, were made up to and including the session of the Legislature of
1900, but the general scheme for rapid transit may be said to have
become fixed when the electors declared in favor of municipal
ownership. The main provisions of the legislation which stood upon the
statute books as the Rapid Transit Act, when the contract was finally
executed, February 21, 1900, may be briefly summarized as follows:

(_a_) The Act was general in terms, applying to all cities in the
State having a population of over one million; it was special in
effect because New York was the only city having such a population. It
did not limit the Rapid Transit Commissioners to the building of a
single road, but authorized the laying out of successive roads or
extensions.

(_b_) A Board was created consisting of the Mayor, Comptroller, or
other chief financial officer of the city; the president of the
Chamber of Commerce of the State of New York, by virtue of his office,
and five members named in the Act: William Steinway, Seth Low, John
Claflin, Alexander E. Orr, and John H. Starin, men distinguished for
their business experience, high integrity, and civic pride. Vacancies
in the Board were to be filled by the Board itself, a guaranty of a
continued uniform policy.

(_c_) The Board was to prepare general routes and plans and submit the
question of municipal ownership to the electors of the city.

(_d_) The city was authorized, in the event that the electors decided
for city ownership, to issue bonds not to exceed $50,000,000 for the
construction of the road or roads and $5,000,000 additional, if
necessary, for acquiring property rights for the route. The interest
on the bonds was not to exceed 3-1/2 per cent.

(_e_) The Commissioners were given the broad power to enter into a
contract (in the case of more than one road, successive contracts) on
behalf of the city for the construction of the road with the person,
firm, or corporation which in the opinion of the Board should be best
qualified to carry out the contract, and to determine the amount of
the bond to be given by the contractor to secure its performance. The
essential features of the contract were, however, prescribed by the
Act. The contractor in and by the contract for building the road was
to agree to fully equip it at his own expense, and the equipment was
to include all power houses. He was also to operate the road, as
lessee of the city, for a term not to exceed fifty years, upon terms
to be included in the contract for construction, which might include
provision for renewals of the lease upon such terms as the Board
should from time to time determine. The rental was to be at least
equal to the amount of interest on the bonds which the city might
issue for construction and one per cent. additional. The one per cent.
additional might, in the discretion of the Board, be made contingent
in part for the first ten years of the lease upon the earnings of the
road. The rental was to be applied by the city to the interest on the
bonds and the balance was to be paid into the city's general sinking
fund for payment of the city's debt or into a sinking fund for the
redemption at maturity of the bonds issued for the construction of the
rapid transit road, or roads. In addition to the security which might
be required by the Board of the contractor for construction and
operation, the Act provided that the city should have a first lien
upon the equipment of the road to be furnished by the contractor, and
at the termination of the lease the city had the privilege of
purchasing such equipment from the contractor.

(_f_) The city was to furnish the right of way to the contractor free
from all claims of abutting property owners. The road was to be the
absolute property of the city and to be deemed a part of the public
streets and highways. The equipment of the road was to be exempt from
taxation.

(_g_) The Board was authorized to include in the contract for
construction provisions in detail for the supervision of the city,
through the Board, over the operation of the road under the lease.

One of the most attractive--and, in fact, indispensable features of
the scheme--was that the work of construction, instead of being
subject to the conflicting control of various departments of the City
Government, with their frequent changes in personnel, was under the
exclusive supervision and control of the Rapid Transit Board, a
conservative and continuous body composed of the two principal
officers of the City Government, and five merchants of the very
highest standing in the community.

Provided capitalists could be found to undertake such an extensive
work under the exacting provisions, the scheme was an admirable one
from the taxpayers' point of view. The road would cost the city
practically nothing and the obligation of the contractor to equip and
operate being combined with the agreement to construct furnished a
safeguard against waste of the public funds and insured the prompt
completion of the road. The interest of the contractor in the
successful operation, after construction, furnished a strong incentive
to see that as the construction progressed the details were consistent
with successful operation and to suggest and consent to such
modifications of the contract plans as might appear necessary from an
operating point of view, from time to time. The rental being based
upon the cost encouraged low bids, and the lien of the city upon the
equipment secured the city against all risk, once the road was in
operation.

Immediately after the vote of the electors upon the question of
municipal ownership, the Rapid Transit Commissioners adopted routes
and plans which they had been studying and perfecting since the
failure to find bidders for the franchise under the original Act of
1891. The local authorities approved them, and again the property
owners refused their consent, making an application to the Supreme
Court necessary. The Court refused its approval upon the ground that
the city, owing to a provision of the constitution of the State
limiting the city's power to incur debt, would be unable to raise the
necessary money. This decision appeared to nullify all the efforts of
the public spirited citizens composing the Board of Rapid Transit
Commissioners and to practically prohibit further attempts on their
part. They persevered, however, and in January, 1897, adopted new
general routes and plans. The consolidation of a large territory into
the Greater New York, and increased land values, warranted the hope
that the city's debt limit would no longer be an objection, especially
as the new route changed the line so as to reduce the estimated cost.
The demands for rapid transit had become more and more imperative as
the years went by, and it was fair to assume that neither the courts
nor the municipal authorities would be overzealous to find a narrow
construction of the laws. Incidentally, the constitutionality of the
rapid transit legislation, in its fundamental features, had been
upheld in the Supreme Court in a decision which was affirmed by the
highest court of the State a few weeks after the Board had adopted its
new plans. The local authorities gave their consent to the new route;
the property owners, as on the two previous occasions, refused their
consent; the Supreme Court gave its approval in lieu thereof; and the
Board was prepared to undertake the preliminaries for letting a
contract. These successive steps and the preparation of the terms of
the contract all took time; but, finally, on November 15, 1899, a form
of contract was adopted and an invitation issued by the Board to
contractors to bid for the construction and operation of the railroad.
There were two bidders, one of whom was John B. McDonald, whose terms
submitted under the invitation were accepted on January 15, 1900; and,
for the first time, it seemed as if a beginning might be made in the
actual construction of the rapid transit road. The letter of
invitation to contractors required that every proposal should be
accompanied by a certified check upon a National or State Bank,
payable to the order of the Comptroller, for $150,000, and that within
ten days after acceptance, or within such further period as might be
prescribed by the Board, the contract should be duly executed and
delivered. The amount to be paid by the city for the construction was
$35,000,000 and an additional sum not to exceed $2,750,000 for
terminals, station sites, and other purposes. The construction was to
be completed in four years and a half, and the term of the lease from
the city to the contractor was fixed at fifty years, with a renewal,
at the option of the contractor, for twenty-five years at a rental to
be agreed upon by the city, not less than the average rental for the
then preceding ten years. The rental for the fifty-year term was fixed
at an amount equal to the annual interest upon the bonds issued by the
city for construction and 1 per cent. additional, such 1 per cent.
during the first ten years to be contingent in part upon the earnings
of the road. To secure the performance of the contract by Mr. McDonald
the city required him to deposit $1,000,000 in cash as security for
construction, to furnish a bond with surety for $5,000,000 as security
for construction and equipment, and to furnish another bond of
$1,000,000 as continuing security for the performance of the contract.
The city in addition to this security had, under the provisions of the
Rapid Transit Act, a first lien on the equipment, and it should be
mentioned that at the expiration of the lease and renewals (if any)
the equipment is to be turned over to the city, pending an agreement
or arbitration upon the question of the price to be paid for it by the
city. The contract (which covered about 200 printed pages) was minute
in detail as to the work to be done, and sweeping powers of
supervision were given the city through the Chief Engineer of the
Board, who by the contract was made arbiter of all questions that
might arise as to the interpretation of the plans and specifications.
The city had been fortunate in securing for the preparation of plans
the services of Mr. William Barclay Parsons, one of the foremost
engineers of the country. For years as Chief Engineer of the Board he
had studied and developed the various plans and it was he who was to
superintend on behalf of the city the completion of the work.

During the thirty-two years of rapid transit discussion between 1868,
when the New York City Central Underground Company was incorporated,
up to 1900, when the invitations for bids were issued by the city,
every scheme for rapid transit had failed because responsible
capitalists could not be found willing to undertake the task of
building a road. Each year had increased the difficulties attending
such an enterprise and the scheme finally evolved had put all of the
risk upon the capitalists who might attempt to finance the work, and
left none upon the city. Without detracting from the credit due the
public-spirited citizens who had evolved the plan of municipal
ownership, it may be safely asserted that the success of the
undertaking depended almost entirely upon the financial backing of the
contractor. When the bid was accepted by the city no arrangements had
been made for the capital necessary to carry out the contract. After
its acceptance, Mr. McDonald not only found little encouragement in
his efforts to secure the capital, but discovered that the surety
companies were unwilling to furnish the security required of him,
except on terms impossible for him to fulfill.

The crucial point in the whole problem of rapid transit with which the
citizens of New York had struggled for so many years had been reached,
and failure seemed inevitable. The requirements of the Rapid Transit
Act were rigid and forbade any solution of the problem which committed
the city to share in the risks of the undertaking. Engineers might
make routes and plans, lawyers might draw legislative acts, the city
might prepare contracts, the question was and always had been, Can
anybody build the road who will agree to do it and hold the city safe
from loss?

It was obvious when the surety companies declined the issue that the
whole rapid transit problem was thrown open, or rather that it always
had been open. The final analysis had not been made. After all, the
attitude of the surety companies was only a reflection of the general
feeling of practical business and railroad men towards the whole
venture. To the companies the proposition had come as a concrete
business proffer and they had rejected it.

At this critical point, Mr. McDonald sought the assistance of Mr.
August Belmont. It was left to Mr. Belmont to make the final analysis,
and avert the failure which impended. There was no time for indecision
or delay. Whatever was to be done must be done immediately. The
necessary capital must be procured, the required security must be
given, and an organization for building and operating the road must be
anticipated. Mr. Belmont looking through and beyond the intricacies of
the Rapid Transit Act, and the complications of the contract, saw that
he who undertook to surmount the difficulties presented by the
attitude of the surety companies must solve the whole problem. It was
not the ordinary question of financing a railroad contract. He saw
that the responsibility for the entire rapid transit undertaking must
be centered, and that a compact and effective organization must be
planned which could deal with every phase of the situation.

Mr. Belmont without delay took the matter up directly with the Board
of Rapid Transit Railroad Commissioners, and presented a plan for the
incorporation of a company to procure the security required for the
performance of the contract, to furnish the capital necessary to carry
on the work, and to assume supervision over the whole undertaking.
Application was to be made to the Supreme Court to modify the
requirements with respect to the sureties by striking out a provision
requiring the justification of the sureties in double the amount of
liabilities assumed by each and reducing the minimum amount permitted
to be taken by each surety from $500,000 to $250,000. The new
corporation was to execute as surety a bond for $4,000,000, the
additional amount of $1,000,000 to be furnished by other sureties. A
beneficial interest in the bonds required from the sub-contractors was
to be assigned to the city and, finally, the additional amount of
$1,000,000, in cash or securities, was to be deposited with the city
as further security for the performance of the contract. The plan was
approved by the Board of Rapid Transit Railroad Commissioners, and
pursuant to the plan, the Rapid Transit Subway Construction Company
was organized. The Supreme Court granted the application to modify the
requirements as to the justification of sureties and the contract was
executed February 21, 1900.

As president and active executive head of the Rapid Transit Subway
Construction Company, Mr. Belmont perfected its organization,
collected the staff of engineers under whose direction the work of
building the road was to be done, supervised the letting of
sub-contracts, and completed the financial arrangements for carrying
on the work.

The equipment of the road included, under the terms of the contract,
the rolling stock, all machinery and mechanisms for generating
electricity for motive power, lighting, and signaling, and also the
power house, sub-stations, and the real estate upon which they were to
be erected. The magnitude of the task of providing the equipment was
not generally appreciated until Mr. Belmont took the rapid transit
problem in hand. He foresaw from the beginning the importance of that
branch of the work, and early in 1900, immediately after the signing
of the contract, turned his attention to selecting the best engineers
and operating experts, and planned the organization of an operating
company. As early as May, 1900, he secured the services of Mr. E. P.
Bryan, who came to New York from St. Louis, resigning as
vice-president and general manager of the Terminal Railroad
Association, and began a study of the construction work and plans for
equipment, to the end that the problems of operation might be
anticipated as the building and equipment of the road progressed. Upon
the incorporation of the operating company, Mr. Bryan became
vice-president.

In the spring of 1902, the Interborough Rapid Transit Company, the
operating railroad corporation was formed by the interests represented
by Mr. Belmont, he becoming president and active executive head of
this company also, and soon thereafter Mr. McDonald assigned to it the
lease or operating part of his contract with the city, that company
thereby becoming directly responsible to the city for the equipment
and operation of the road, Mr. McDonald remaining as contractor for
its construction. In the summer of the same year, the Board of Rapid
Transit Railroad Commissioners having adopted a route and plans for an
extension of the subway under the East River to the Borough of
Brooklyn, the Rapid Transit Subway Construction Company entered into a
contract with the city, similar in form to Mr. McDonald's contract, to
build, equip, and operate the extension. Mr. McDonald, as contractor
of the Rapid Transit Subway Construction Company, assumed the general
supervision of the work of constructing the Brooklyn extension; and
the construction work of both the original subway and the extension
has been carried on under his direction. The work of construction has
been greatly facilitated by the broad minded and liberal policy of the
Rapid Transit Board and its Chief Engineer and Counsel, and by the
coöperation of all the other departments of the City Government, and
also by the generous attitude of the Metropolitan Street Railway
Company and its lessee, the New York City Railroad Company, in
extending privileges which have been of great assistance in the
prosecution of the work. In January, 1903, the Interborough Rapid
Transit Company acquired the elevated railway system by lease for 999
years from the Manhattan Railway Company, thus assuring harmonious
operation of the elevated roads and the subway system, including the
Brooklyn extension.

The incorporators of the Interborough Rapid Transit Company were
William H. Baldwin, Jr., Charles T. Barney, August Belmont, E. P.
Bryan, Andrew Freedman, James Jourdan, Gardiner M. Lane, John B.
McDonald, DeLancey Nicoll, Walter G. Oakman, John Peirce, Wm. A. Read,
Cornelius Vanderbilt, George W. Wickersham, and George W. Young.

The incorporators of the Rapid Transit Subway Construction Company
were Charles T. Barney, August Belmont, John B. McDonald, Walter G.
Oakman, and William A. Read.

[Illustration: (wings)]

[Illustration: EXTERIOR VIEW OF POWER HOUSE]

CHAPTER I

THE ROUTE OF THE ROAD--PASSENGER STATIONS AND TRACKS

The selection of route for the Subway was governed largely by the
amount which the city was authorized by the Rapid Transit Act to
spend. The main object of the road was to carry to and from their
homes in the upper portions of Manhattan Island the great army of
workers who spend the business day in the offices, shops, and
warehouses of the lower portions, and it was therefore obvious that
the general direction of the routes must be north and south, and that
the line must extend as nearly as possible from one end of the island
to the other.

The routes proposed by the Rapid Transit Board in 1895, after
municipal ownership had been approved by the voters at the fall
election of 1894, contemplated the occupation of Broadway below 34th
Street to the Battery, and extended only to 185th Street on the west
side and 146th Street on the east side of the city. As has been told
in the introductory chapter, this plan was rejected by the Supreme
Court because of the probable cost of going under Broadway. It was
also intimated by the Court, in rejecting the routes, that the road
should extend further north.

It had been clear from the beginning that no routes could be laid out
to which abutting property owners would consent, and that the consent
of the Court as an alternative would be necessary to any routes
chosen. To conform as nearly as possible to the views of the Court,
the Commission proposed, in 1897, the so called "Elm Street route,"
the plan finally adopted, which reached from the territory near the
General Post-office, the City Hall, and Brooklyn Bridge Terminal to
Kingsbridge and the station of the New York & Putnam Railroad on the
upper west side, and to Bronx Park on the upper east side of the city,
touching the Grand Central Depot at 42d Street.

Subsequently, by the adoption of the Brooklyn Extension, the line was
extended down Broadway to the southern extremity of Manhattan Island,
thence under the East River to Brooklyn.

The routes in detail are as follows:

[Sidenote:
_Manhattan-Bronx
Route_]

Beginning near the intersection of Broadway and Park Row, one of the
routes of the railroad extends under Park Row, Center Street, New Elm
Street, Elm Street, Lafayette Place, Fourth Avenue (beginning at Astor
Place), Park Avenue, 42d Street, and Broadway to 125th Street, where
it passes over Broadway by viaduct to 133d Street, thence under
Broadway again to and under Eleventh Avenue to Fort George, where it
comes to the surface again at Dyckman Street and continues by viaduct
over Naegle Avenue, Amsterdam Avenue, and Broadway to Bailey Avenue,
at the Kingsbridge station of the New York & Putnam Railroad, crossing
the Harlem Ship Canal on a double-deck drawbridge. The length of this
route is 13.50 miles, of which about 2 miles are on viaduct.

Another route begins at Broadway near 103d Street and extends under
104th Street and the upper part of Central Park to and under Lenox
Avenue to 142d Street, thence curving to the east to and under the
Harlem River at about 145th Street, thence from the river to and
under East 149th Street to a point near Third Avenue, thence by
viaduct beginning at Brook Avenue over Westchester Avenue, the
Southern Boulevard and the Boston Road to Bronx Park. The length of
this route is about 6.97 miles, of which about 3 miles are on viaduct.

[Illustration: MAP SHOWING THE LINES OF THE INTERBOROUGH RAPID TRANSIT
CO. 1904]

At the City Hall there is a loop under the Park. From 142d Street
there is a spur north under Lenox Avenue to 148th Street. There is a
spur at Westchester and Third Avenues connecting by viaduct the
Manhattan Elevated Railway Division of Interborough Rapid Transit
Company with the viaduct of the subway at or near St. Ann's Avenue.

[Sidenote: _Brooklyn Route_]

The route of the Brooklyn Extension connects near Broadway and Park
Row with the Manhattan Bronx Route and extends under Broadway, Bowling
Green, State Street, Battery Park, Whitehall Street, and South Street
to and under the East River to Brooklyn at the foot of Joralemon
Street, thence under Joralemon Street, Fulton Street, and Flatbush
Avenue to Atlantic Avenue, connecting with the Brooklyn tunnel of the
Long Island Railroad at that point. There is a loop under Battery Park
beginning at Bridge Street. The length of this route is about 3 miles.

The routes in Manhattan and The Bronx may therefore be said to roughly
resemble the letter Y with the base at the southern extremity of
Manhattan Island, the fork at 103d Street and Broadway, the terminus
of the westerly or Fort George branch of the fork just beyond Spuyten
Duyvil Creek, the terminus of the easterly or Bronx Park branch at
Bronx Park.

[Sidenote: _Location
of Stations_]

The stations beginning at the base of the Y and following the route up
to the fork are located at the following points:

South Ferry, Bowling Green and Battery Place, Rector Street and
Broadway, Fulton Street and Broadway, City Hall, Manhattan; Brooklyn
Bridge Entrance, Manhattan; Worth and Elm Streets, Canal and Elm
Streets, Spring and Elm Streets, Bleecker and Elm Streets, Astor Place
and Fourth Avenue, 14th Street and Fourth Avenue, 18th Street and
Fourth Avenue, 23d Street and Fourth Avenue, 28th Street and Fourth
Avenue, 33d Street and Fourth Avenue, 42d Street and Madison Avenue
(Grand Central Station), 42d Street and Broadway, 50th Street and
Broadway, 60th Street and Broadway (Columbus Circle), 66th Street and
Broadway, 72d Street and Broadway, 79th Street and Broadway, 86th
Street and Broadway, 91st Street and Broadway, 96th Street and
Broadway.

[Illustration: 34TH STREET AND PARK AVENUE, LOOKING SOUTH]

The stations of the Fort George or westerly branch are located at the
following points:

One Hundred and Third Street and Broadway, 110th Street and Broadway
(Cathedral Parkway), 116th Street and Broadway (Columbia University),
Manhattan Street (near 128th Street) and Broadway, 137th Street and
Broadway, 145th Street and Broadway, 157th Street and Broadway, the
intersection of 168th Street, St. Nicholas Avenue and Broadway, 181st
Street and Eleventh Avenue, Dyckman Street and Naegle Avenue (beyond
Fort George), 207th Street and Amsterdam Avenue, 215th Street and
Amsterdam Avenue, Muscoota Street and Broadway, Bailey Avenue, at
Kingsbridge near the New York & Putnam Railroad station.

The stations on the Bronx Park or easterly branch are located at the
following points:

One Hundred and Tenth Street and Lenox Avenue, 116th Street and Lenox
Avenue, 125th Street and Lenox Avenue, 135th Street and Lenox Avenue,
145th Street and Lenox Avenue (spur), Mott Avenue and 149th Street,
the intersection of 149th Street, Melrose and Third Avenues, Jackson
and Westchester Avenues, Prospect and Westchester Avenues, Westchester
Avenue near Southern Boulevard (Fox Street), Freeman Street and the
Southern Boulevard, intersection of 174th Street, Southern Boulevard
and Boston Road, 177th Street and Boston Road (near Bronx Park).

[Illustration: PROFILE OF RAPID TRANSIT RAILROAD MANHATTAN AND
BRONX LINES.]

The stations in the Borough of Brooklyn on the Brooklyn Extension are
located as follows:

Joralemon Street near Court (Brooklyn Borough Hall), intersection of
Fulton, Bridge, and Hoyt Streets; Flatbush Avenue near Nevins Street,
Atlantic Avenue and Flatbush Avenue (Brooklyn terminal of the Long
Island Railroad).

From the Borough Hall, Manhattan, to the 96th Street station, the line
is four-track. On the Fort George branch (including 103d Street
station) there are three tracks to 145th Street and then two tracks to
Dyckman Street, then three tracks again to the terminus at Bailey
Avenue. On the Bronx Park branch there are two tracks to Brook Avenue
and from that point to Bronx Park there are three tracks. On the Lenox
Avenue spur to 148th Street there are two tracks, on the City Hall
loop one track, on the Battery Park loop two tracks. The Brooklyn
Extension is a two-track line.

There is a storage yard under Broadway between 137th Street and 145th
Street on the Fort George branch, another on the surface at the end of
the Lenox Avenue spur, Lenox Avenue and 148th Street, and a third on
an elevated structure at the Boston Road and 178th Street. There is a
repair shop and inspection shed on the surface adjoining the Lenox
Avenue spur at the Harlem River and 148-150th Streets, and an
inspection shed at the storage yard at Boston Road and 178th Street.

[Sidenote: _Length of
Line._]

The total length of the line from the City Hall to the Kingsbridge
terminal is 13.50 miles, with 47.11 miles of single track and sidings.
The eastern or Bronx Park branch is 6.97 miles long, with 17.50 miles
of single track.

[Illustration: PROFILE OF BROOKLYN EXTENSION.]

[Sidenote: _Grades and
Curves._]

The total length of the Brooklyn Extension is 3.1 miles, with about 8
miles of single track.

The grades and curvature along the main line may be summarized as
follows:

The total curvature is equal in length to 23 per cent. of the straight
line, and the least radius of curvature is 147 feet. The greatest
grade is 3 per cent., and occurs on either side of the tunnel under
the Harlem River. At each station there is a down grade of 2.1 per
cent., to assist in the acceleration of the cars when they start. In
order to make time on roads running trains at frequent intervals, it
is necessary to bring the trains to their full speed very soon after
starting. The electrical equipment of the Rapid Transit Railroad will
enable this to be done in a better manner than is possible with steam
locomotives, while these short acceleration grades at each station, on
both up and down tracks, will be of material assistance in making the
starts smooth.

Photograph on page 26 shows an interesting feature at a local
station, where, in order to obtain the quick acceleration in grade for
local trains, and at the same time maintain a level grade for the
express service, the tracks are constructed at a different level. This
occurs at many local stations.

On the Brooklyn Extension the maximum grade is 3.1 per cent.
descending from the ends to the center of the East River tunnel. The
minimum radius of curve is 1,200 feet.

[Illustration: STANDARD STEEL CONSTRUCTION IN TUNNEL--THIRD RAIL
PROTECTION NOT SHOWN]

[Illustration: PLAN OF BROOKLYN BRIDGE STATION AND CITY HALL LOOP]

[Sidenote: _Track_]

The track is of the usual standard construction with broken stone
ballast, timber cross ties, and 100-pound rails of the American
Society of Civil Engineers' section. The cross ties are selected hard
pine. All ties are fitted with tie plates. All curves are supplied
with steel inside guard rails. The frogs and switches are of the best
design and quality to be had, and a special design has been used on
all curves. At the Battery loop, at Westchester Avenue, at 96th
Street, and at City Hall loop, where it has been necessary for the
regular passenger tracks to cross, grade crossings have been avoided;
one track or set of tracks passing under the other at the intersecting
points. (See plan on this page.)

The contract for the building of the road contains the following
somewhat unusual provision: "The railway and its equipment as
contemplated by the contract constitute a great public work. All parts
of the structure where exposed to public sight shall therefore be
designed, constructed, and maintained with a view to the beauty of
their appearance, as well as to their efficiency."

It may be said with exact truthfulness that the builders have spared
no effort or expense to live up to the spirit of this provision, and
that all parts of the road and equipment display dignified and
consistent artistic effects of the highest order. These are noticeable
in the power house and the electrical sub-stations and particularly in
the passenger stations. It might readily have been supposed that the
limited space and comparative uniformity of the underground stations
would afford but little opportunity for architectural and decorative
effects. The result has shown the fallacy of such a supposition.

[Illustration: PLAN OF 28TH ST. & 4TH AVENUE STATION.]

Of the forty-eight stations, thirty-three are underground, eleven are
on the viaduct portions of the road, and three are partly on the
surface and partly underground, and one is partly on the surface and
partly on the viaduct.

[Sidenote: _Space Occupied_]

The underground stations are at the street intersections, and, except
in a few instances, occupy space under the cross streets. The station
plans are necessarily varied to suit the conditions of the different
locations, the most important factor in planning them having been the
amount of available space. The platforms are from 200 to 350 feet in
length, and about 16 feet in width, narrowing at the ends, while the
center space is larger or smaller, according to local conditions. As a
rule the body of the station extends back about 50 feet from the edge
of the platform.

At all local stations (except at 110th Street and Lenox Avenue) the
platforms are outside of the tracks. (Plan and photograph on pages
30 and 31.) At Lenox Avenue and 110th Street there is a single island
platform for uptown and downtown passengers.

[Illustration: 28TH STREET STATION]

[Sidenote: _Island
Platforms_]

At express stations there are two island platforms between the express
and local tracks, one for uptown and one for downtown traffic. In
addition, there are the usual local platforms at Brooklyn Bridge, 14th
Street (photograph on page 34) and 96th Street. At the remaining
express stations, 42d Street and Madison Avenue and 72d Street, there
are no local platforms outside of the tracks, local and through
traffic using the island platforms.

The island platforms at Brooklyn Bridge, 14th Street, and 42d Street
and Madison Avenue are reached by mezzanine footways from the local
platforms, it having been impossible to place entrances in the streets
immediately over the platforms. At 96th Street there is an underground
passage connecting the local and island platforms, and at 72d Street
there are entrances to the island platforms directly from the street
because there is a park area in the middle of the street. Local
passengers can transfer from express trains and express passengers
from local trains without payment of additional fare by stepping
across the island platforms.

At 72d Street, at 103d Street, and at 116th Street and Broadway the
station platforms are below the surface, but the ticket booths and
toilet rooms are on the surface; this arrangement being possible also
because of the park area available in the streets. At Manhattan Street
the platforms are on the viaduct, but the ticket booths and toilet
rooms are on the surface. The viaduct at this point is about 68 feet
above the surface, and escalators are provided. At many of the
stations entrances have been arranged from the adjacent buildings, in
addition to the entrances originally planned from the street.

[Sidenote: Kiosks]

The entrances to the underground stations are enclosed at the street
by kiosks of cast iron and wire glass (photograph on page 33), and
vary in number from two to eight at a station. The stairways are of
concrete, reinforced by twisted steel rods. At 168th Street, at 181st
Street, and at Mott Avenue, where the platforms are from 90 to 100
feet below the surface, elevators are provided.

[Illustration: WEST SIDE OF 23D STREET STATION]

At twenty of the underground stations it has been possible to use
vault lights to such an extent that very little artificial light is
needed. (Photograph on page 35.) Such artificial light as is
required is supplied by incandescent lamps sunk in the ceilings.
Provision has been made for using the track circuit for lighting in
emergency if the regular lighting circuit should temporarily fail.

[Illustration: KIOSKS AT COLUMBUS CIRCLE]

The station floors are of concrete, marked off in squares. At the
junction of the floors and side walls a cement sanitary cove is
placed. The floors drain to catch-basins, and hose bibs are provided
for washing the floors.

[Illustration: BROOKLYN BRIDGE STATION]

Two types of ceiling are used, one flat, which covers the steel and
concrete of the roof, and the other arched between the roof beams and
girders, the lower flanges of which are exposed. Both types have an
air space between ceiling and roof, which, together with the air
space behind the inner side walls, permits air to circulate and
minimizes condensation on the surface of the ceiling and walls.

[Illustration: PLAQUE SHOWING BEAVER AT ASTOR PLACE STATION]

The ceilings are separated into panels by wide ornamental mouldings,
and the panels are decorated with narrower mouldings and rosettes. The
bases of the walls are buff Norman brick. Above this is glass tile or
glazed tile, and above the tile is a faience or terra-cotta cornice.
Ceramic mosaic is used for decorative panels, friezes, pilasters, and
name-tablets. A different decorative treatment is used at each
station, including a distinctive color scheme. At some stations the
number of the intersecting street or initial letter of the street name
is shown on conspicuous plaques, at other stations the number or
letter is in the panel. At some stations artistic emblems have been
used in the scheme of decoration, as at Astor Place, the beaver (see
photograph on this page); at Columbus Circle, the great
navigator's Caravel; at 116th Street, the seal of Columbia University.
The walls above the cornice and the ceilings are finished in white
Keene cement.

[Illustration: EXPRESS STATION AT 14TH STREET, SHOWING ISLAND AND
MEZZANINE PLATFORMS AND STAIRS CONNECTING THEM]

[Illustration: WEST SIDE OF COLUMBUS CIRCLE STATION (60TH
STREET)--ILLUMINATED BY DAYLIGHT COMING THROUGH VAULT LIGHTS]

[Illustration: CARAVEL AND WALL DECORATION]

The ticket booths are of oak with bronze window grills and fittings.
There are toilet rooms in every station, except at the City Hall loop.
Each toilet room has a free closet or closets, and a pay closet which
is furnished with a basin, mirror, soap dish, and towel rack. The
fixtures are porcelain, finished in dull nickel. The soil, vent and
water pipes are run in wall spaces, so as to be accessible. The rooms
are ventilated through the hollow columns of the kiosks, and each is
provided with an electric fan. They are heated by electric heaters.
The woodwork of the rooms is oak; the walls are red slate wainscot and
Keene cement.

Passengers may enter the body of the station without paying fare. The
train platforms are separated from the body of the station by
railings. At the more important stations, separate sets of entrances
are provided for incoming and outgoing passengers, the stairs at the
back of the station being used for entrances and those nearer the
track being used for exits.

[Illustration: CITY HALL STATION]

An example of the care used to obtain artistic effects can be seen at
the City Hall station. The road at this point is through an arched
tunnel. In order to secure consistency in treatment the roof of the
station is continued by a larger arch of special design. (See
photograph on this page.) At 168th Street, and at 181st Street,
and at Mott Avenue stations, where the road is far beneath the
surface, it has been possible to build massive arches over the
stations and tracks, with spans of 50 feet.

CHAPTER II

TYPES AND METHODS OF CONSTRUCTION

Five types of construction have been employed in building the road:
(1) the typical subway near the surface with flat roof and "I" beams
for the roof and sides, supported between tracks with steel bulb-angle
columns used on about 10.6 miles or 52.2 per cent. of the road; (2)
flat roof typical subway of reënforced concrete construction supported
between the tracks by steel bulb-angle columns, used for a short
distance on Lenox Avenue and on the Brooklyn portion of the Brooklyn
Extension, also on the Battery Park loop; (3) concrete lined tunnel
used on about 4.6 miles or 23 per cent. of the road, of which 4.2 per
cent. was concrete lined open cut work, and the remainder was rock
tunnel work; (4) elevated road on steel viaduct used on about 5 miles
or 24.6 per cent. of the road; (5) cast-iron tubes used under the
Harlem and East Rivers.

[Sidenote: _Typical
Subway_]

The general character of the flat roof "I" beam construction is shown
in photograph on page 28 and drawing on this page. The bottom
is of concrete. The side walls have "I" beam columns five feet apart,
between which are vertical concrete arches, the steel acting as a
support for the masonry and allowing the thickness of the walls to be
materially reduced from that necessary were nothing but concrete used.
The tops of the wall columns are connected by roof beams which are
supported by rows of steel columns between the tracks, built on
concrete and cut stone bases forming part of the floor system.
Concrete arches between the roof beams complete the top of the subway.
Such a structure is not impervious, and hence, there has been laid
behind the side walls, under the floor and over the roof a course of
two to eight thicknesses of felt, each washed with hot asphalt as
laid. In addition to this precaution against dampness, in three
sections of the subway (viz.: on Elm Street between Pearl and Grand
Streets, and on the approaches to the Harlem River tunnel, and on the
Battery Park Loop) the felt waterproofing has been made more effective
by one or two courses of hard-burned brick laid in hot asphalt, after
the manner sometimes employed in constructing the linings of
reservoirs of waterworks.

[Illustration: TYPICAL SECTION OF FOUR TRACK SUBWAY]

[Illustration: FOUR-TRACK SUBWAY--SHOWING CROSS-OVER SOUTH OF 18TH
STREET STATION]

In front of the waterproofing, immediately behind the steel columns,
are the systems of terra-cotta ducts in which the electric cables are
placed. The cables can be reached by means of manholes every 200 to
450 feet, which open into the subway and also into the street. The
number of these ducts ranges from 128 down to 32, and they are
connected with the main power station at 58th and 59th Streets and the
Hudson River by a 128-duct subway under the former street.

[Sidenote: _Reinforced
Concrete
Construction_]

The reinforced concrete construction substitutes for the steel roof
beams, steel rods, approximating 1-1/4 inches square, laid in varying
distances according to the different roof loads, from six to ten
inches apart. Rods 1-1/8 inches in diameter tie the side walls,
passing through angle columns in the walls and the bulb-angle columns
in the center. Layers of concrete are laid over the roof rods to a
thickness of from eighteen to thirty inches, and carried two inches
below the rods, imbedding them. For the sides similar square rods and
concrete are used and angle columns five feet apart. The concrete of
the side walls is from fifteen to eighteen inches thick. This type is
shown by photographs on page 41. The rods used are of both square
and twisted form.

[Illustration: LAYING SHEET WATERPROOFING IN BOTTOM]

[Illustration: SPECIAL BRICK AND ASPHALT WATERPROOFING]

[Sidenote: _Methods of
Construction
Typical
Subway_]

The construction of the typical subway has been carried on by a great
variety of methods, partly adopted on account of the conditions under
which the work had to be prosecuted and partly due to the personal
views of the different sub-contractors. The work was all done by open
excavation, the so-called "cut and cover" system, but the conditions
varied widely along different parts of the line, and different means
were adopted to overcome local difficulties. The distance of the rock
surface below the street level had a marked influence on the manner in
which the excavation of the open trenches could be made. In some
places this rock rose nearly to the pavement, as between 14th and 18th
Streets. At other places the subway is located in water-bearing loam
and sand, as in the stretch between Pearl and Grand Streets, where it
was necessary to employ a special design for the bottom, which is
illustrated by drawing on page 42.

This part of the route includes the former site of the ancient Collect
Pond, familiar in the early history of New York, and the excavation
was through made ground, the pond having been filled in for building
purposes after it was abandoned for supplying water to the city. The
excavations through Canal Street, adjacent, were also through made
ground, that street having been at one time, as its name implies, a
canal.

From the City Hall to 9th Street was sand, presenting no particular
difficulties except through the territory just described.

At Union Square rock was encountered on the west side of Fourth Avenue
from the surface down. On the east side of the street, however, at the
surface was sand, which extended 15 feet down to a sloping rock
surface. The tendency of the sand to a slide off into the rock
excavation required great care. The work was done, however, without
interference with the street traffic, which is particularly heavy at
that point.

[Illustration: DUCTS IN SIDE WALLS--EIGHT ONLY OF THE SIXTEEN LAYERS
ARE SHOWN]

[Illustration: REINFORCED CONCRETE CONSTRUCTION]

[Illustration: ROOF SHOWING CONCRETE-STEEL CONSTRUCTION--LENOX AVENUE
AND 140TH-141ST STREETS]

[Illustration: SECTION OF SUBWAY AT PEARL STREET
This construction was made necessary by encountering a layer of Peat
resting on Clay]

[Illustration: SURFACE RAILWAY TRACKS SUPPORTED OVER EXCAVATION ON
UPPER BROADWAY]

[Illustration: SUBDIVISION OF 36" AND 30" GAS MAINS OVER ROOF OF
SUBWAY--66TH STREET AND BROADWAY]

The natural difficulties of the route were increased by the network of
sewers, water and gas mains, steam pipes, pneumatic tubes, electric
conduits and their accessories, which filled the streets; and by the
surface railways and their conduits. In some places the columns of the
elevated railway had to be shored up temporarily, and in other places
the subway passes close to the foundations of lofty buildings, where
the construction needed to insure the safety of both subway and
buildings was quite intricate. As the subway is close to the surface
along a considerable part of its route, its construction involved the
reconstruction of all the underground pipes and ducts in many places,
as well as the removal of projecting vaults and buildings, and, in
some cases, the underpinning of their walls. A description in detail
of the methods of construction followed all along the line would make
an interesting book of itself. Space will only permit, however, an
account of how some of the more serious difficulties were overcome.

On Fourth Avenue, north of Union Square to 33d Street, there were two
electric conduit railway tracks in the center of the roadway and a
horse car track near each curb part of the distance. The two electric
car tracks were used for traffic which could not be interrupted,
although the horse car tracks could be removed without inconvenience.
These conditions rendered it impracticable to disturb the center of
the roadway, while permitting excavation near the curb. Well-timbered
shafts about 8 x 10 feet, in plan, were sunk along one curb line and
tunnels driven from them toward the other side of the street, stopping
about 3-1/2 feet beyond its center line. A bed of concrete was laid on
the bottom of each tunnel, and, when it had set, a heavy vertical
trestle was built on it. In this way trestles were built half across
the street, strong enough to carry all the street cars and traffic on
that half of the roadway. Cableways to handle the dirt were erected
near the curb line, spanning a number of these trestles, and then the
earth between them was excavated from the curb to within a few feet of
the nearest electric car track. The horse car tracks were removed.
Between the electric tracks a trench was dug until its bottom was
level with the tops of the trestles, about three feet below the
surface as a rule. A pair of heavy steel beams was then laid in this
trench on the trestles. Between these beams and the curb line a second
pair of beams were placed. In this way the equivalent of a bridge was
put up, the trestles acting as piers and the beams as girders. The
central portion of the roadway was then undermined and supported by
timbering suspended from the steel beams. The various gas and water
pipes were hung from timbers at the surface of the ground. About four
sections, or 150 feet, of the subway were built at a time in this
manner. When the work was completed along one side of the street it
was repeated in the same manner on the other side. This method of
construction was subsequently modified so as to permit work on both
sides of the street simultaneously. The manner in which the central
part of the roadway was supported remained the same and all of the
traffic was diverted to this strip.

[Illustration: SUPPORT OF ELEVATED RAILWAY STATION AT 42D STREET AND
SIXTH AVENUE]

Between 14th and 17th Streets, because of the proximity of the rock to
the surface, it was necessary to move the tracks of the electric
surface railway from the center of the street some twenty feet to the
east curb, without interrupting traffic, which was very heavy at all
times, the line being one of the main arteries of the Metropolitan
system. Four 12 x 12-inch timbers were laid upon the surface. Standard
cast-iron yokes were placed upon the timbers at the usual distance
apart. Upon this structure the regular track and slot rails were
placed. The space between the rails was floored over. Wooden boxes
were temporarily laid for the electric cables. The usual hand holes
and other accessories were built and the road operated on this timber
roadbed. The removal of the tracks was made necessary because the rock
beneath them and the concrete around the yokes was so closely united
as to be practically monolithic, precluding the use of explosives.
Attempts to remove the rock from under the track demonstrated that it
could not be done without destroying the yokes of the surface railway.

[Illustration: SUPPORTING ELEVATED RAILROAD BY EXTENSION GIRDER--64TH
STREET AND BROADWAY]

The method of undermining the tracks on Broadway from 60th to 104th
Streets was entirely different, for the conditions were not the same.
The street is a wide one with a 22-foot parkway in the center, an
electric conduit railway on either side, and outside each track a wide
roadway. The subway excavation extended about 10 feet outside each
track, leaving between it and the curb ample room for vehicles. The
construction problem, therefore, was to care for the car tracks with a
minimum interference with the excavation. This was accomplished by
temporary bridges for each track, each bridge consisting of a pair of
timber trusses about 55 feet long, braced together overhead high
enough to let a car pass below the bracing. These trusses were set up
on crib-work supports at each end, and the track hung from the lower
chords. (See photograph on page 42.) The excavation then proceeded
until the trench was finished and posts could be put into place
between its bottom and the track. When the track was securely
supported in this way, the trusses were lifted on flat cars and moved
ahead 50 feet.

At 66th Street station the subway roof was about 2 feet from the
electric railway yokes and structures of the street surface line. In
order to build at this point it was necessary to remove two large gas
mains, one 30 inches and the other 36 inches in diameter, and
substitute for them, in troughs built between the roof beams of the
subway, five smaller gas mains, each 24 inches in diameter. This was
done without interrupting the use of the mains.

[Illustration: MOVING BRICK AND CONCRETE RETAINING WALL TO MAKE ROOM
FOR THIRD TRACK--BROADWAY AND 134TH STREET]

At the station on 42d Street, between Park and Madison Avenues, where
there are five subway tracks, and along 42d Street to Broadway, a
special method of construction was employed which was not followed
elsewhere. The excavation here was about 35 feet deep and extended 10
to 15 feet into rock. A trench 30 feet wide was first sunk on the
south side of the street and the subway built in it for a width of two
tracks. Then, at intervals of 50 feet, tunnels were driven toward the
north side of the street. Their tops were about 4 feet above the roof
of the subway and their bottoms were on the roof. When they had been
driven just beyond the line of the fourth track, their ends were
connected by a tunnel parallel with the axis of the subway. The rock
in the bottom of all these tunnels was then excavated to its final
depth. In the small tunnel parallel with the subway axis, a bed of
concrete was placed and the third row of steel columns was erected
ready to carry the steel and concrete roof. When this work was
completed, the earth between the traverse tunnels was excavated, the
material above being supported on poling boards and struts. The roof
of the subway was then extended sidewise over the rock below from the
second to the third row of columns, and it was not until the roof was
finished that the rock beneath was excavated. In this way the subway
was finished for a width of four tracks. For the fifth track the earth
was removed by tunneling to the limits of the subway, and then the
rock below was blasted out.

[Illustration: MOVING WEST SIDE WALL TO WIDEN SUBWAY FOR THIRD
TRACK--135TH STREET AND BROADWAY]

[Illustration: SUBWAY THROUGH NEW "TIMES" BUILDING, SHOWING
INDEPENDENT CONSTRUCTION--THE WORKMEN STAND ON FLOOR GIRDERS OF
SUBWAY]

[Illustration: COLUMNS OF HOTEL BELMONT, PASSING THROUGH SUBWAY AT 42D
STREET AND PARK AVENUE]

In a number of places it was necessary to underpin the columns of the
elevated railways, and a variety of methods were adopted for the work.
A typical example of the difficulties involved was afforded at the
Manhattan Railway Elevated Station at Sixth Avenue and 42d Street. The
stairways of this station were directly over the open excavation for
the subway in the latter thoroughfare and were used by a large number
of people. The work was done in the same manner at each of the four
corners. Two narrow pits about 40 feet apart, were first sunk and
their bottoms covered with concrete at the elevation of the floor of
the subway. A trestle was built in each pit, and on these were placed
a pair of 3-foot plate girders, one on each side of the elevated
column, which was midway between the trestles. The column was then
riveted to the girders and was thus held independent of its original
foundations. Other pits were then sunk under the stairway and trestles
built in them to support it. When this work was completed it was
possible to carry out the remaining excavation without interfering
with the elevated railway traffic.

At 64th Street and Broadway, also, the whole elevated railway had to
be supported during construction. A temporary wooden bent was used to
carry the elevated structure. The elevated columns were removed until
the subway structure was completed at that point. (See photograph on
page 45.)

[Illustration: SMALL WATER MAINS BETWEEN STREET SURFACE AND SUBWAY
ROOF, SUBSTITUTED FOR ONE LARGE MAIN--125TH STREET AND LENOX AVE.]

[Illustration: SPECIAL CONSTRUCTION OF 6-1/2-FOOT SEWER, UNDER CHATHAM
SQUARE]

A feature of the construction which attracted considerable public
attention while it was in progress, was the underpinning of a part of
the Columbus Monument near the southwest entrance to Central Park.
This handsome memorial column has a stone shaft rising about 75 feet
above the street level and weighs about 700 tons. The rubble masonry
foundation is 45 feet square and rests on a 2-foot course of concrete.
The subway passes under its east side within 3 feet of its center,
thus cutting out about three-tenths of the original support. At this
place the footing was on dry sand of considerable depth, but on the
other side of the monument rock rose within 3 feet of the surface. The
steep slope of the rock surface toward the subway necessitated
particular care in underpinning the footings. The work was done by
first driving a tunnel 6 feet wide and 7 feet high under the monument
just outside the wall line of the subway. The tunnel was given a
2-foot bottom of concrete as a support for a row of wood posts a foot
square, which were put in every 5 feet to carry the footing above.
When these posts were securely wedged in place the tunnel was filled
with rubble masonry. This wall was strong enough to carry the weight
of the portion of the monument over the subway, but the monument had
to be supported to prevent its breaking off when undermined. To
support it thus a small tunnel was driven through the rubble masonry
foundation just below the street level and a pair of plate girders run
through it. A trestle bent was then built under each end of the
girders in the finished excavation for the subway. The girders were
wedged up against the top of the tunnel in the masonry and the
excavation was carried out under the monument without any injury to
that structure.

[Illustration: THREE PIPES SUBSTITUTED FOR LARGE BRICK SEWER AT 110TH
STREET AND LENOX AVENUE]

[Illustration: SEWER SIPHON AT 149TH STREET AND RAILROAD AVENUE]

[Illustration: CONCRETE SEWER BACK OF ELECTRIC DUCT MANHOLE--BROADWAY
AND 58TH STREET]

At 134th Street and Broadway a two-track structure of the steel beam
type about 200 feet long was completed. Approaching it from the south,
leading from Manhattan Valley Viaduct, was an open cut with retaining
walls 300 feet long and from 3 to 13 feet in height. After all this
work was finished (and it happened to be the first finished on the
subway), it was decided to widen the road to three tracks, and a
unique piece of work was successfully accomplished. The retaining
walls were moved bodily on slides, by means of jacks, to a line 6-1/4
feet on each side, widening the roadbed 12-1/2 feet, without a break
in either wall. The method of widening the steel-beam typical subway
portion was equally novel. The west wall was moved bodily by jacks
the necessary distance to bring it in line with the new position of
the west retaining wall. The remainder of the structure was then moved
bodily, also by jacks, 6-1/4 feet to the east. The new roof of the
usual type was then added over 12-1/2 feet of additional opening. (See
photographs on pages 46 and 47.)

[Illustration: CONCRETE SEWER BACK OF SIDE WALL, BROADWAY AND 56TH
STREET]

[Illustration: LARGE GAS AND WATER PIPES, RELAID BEHIND EACH SIDE WALL
ON ELM STREET]

Provision had to be made, not only for buildings along the route that
towered far above the street surface, but also for some which
burrowed far below the subway. Photograph on page 47 shows an
interesting example at 42d Street and Broadway, where the pressroom of
the new building of the "New York Times" is beneath the subway, the
first floor is above it, and the first basement is alongside of it.
Incidentally it should be noted that the steel structure of the
building and the subway are independent, the columns of the building
passing through the subway station.

[Illustration: DIFFICULT PIPE WORK--BROADWAY AND 70TH STREET]

At 42d Street and Park Avenue the road passes under the Hotel Belmont,
which necessitated the use of extra heavy steel girders and
foundations for the support of the hotel and reinforced subway
station. (See photograph on page 48.)

Along the east side of Park Row the ascending line of the "loop" was
built through the pressroom of the "New York Times" (the older
downtown building), and as the excavation was considerably below the
bottom of the foundation of the building, great care was necessary to
avoid any settlement. Instead of wood sheathing, steel channels were
driven and thoroughly braced, and construction proceeded without
disturbance of the building, which is very tall.

At 125th Street and Lenox Avenue one of the most complicated network
of subsurface structures was encountered. Street surface electric
lines with their conduits intersect. On the south side of 125th Street
were a 48-inch water main and a 6-inch water main, a 12-inch and two
10-inch gas pipes and a bank of electric light and power ducts. On the
north side were a 20-inch water main, one 6-inch, one 10-inch, and one
12-inch gas pipe and two banks of electric ducts. The headroom between
the subway roof and the surface of the street was 4.75 feet. It was
necessary to relocate the yokes of the street railway tracks on Lenox
Avenue so as to bring them directly over the tunnel roof-beams.
Between the lower flanges of the roof-beams, for four bents, were laid
heavy steel plates well stiffened, and in these troughs were laid four
20-inch pipes, which carried the water of the 48-inch main. (See
photograph on page 49.) Special castings were necessary to make
the connections at each end. The smaller pipes and ducts were
rearranged and carried over the roof or laid in troughs composed of
3-inch I-beams laid on the lower flanges of the roof-beams. In
addition to all the transverse pipes, there were numerous pipes and
duct lines to be relaid and rebuilt parallel to the subway and around
the station. The change was accomplished without stopping or delaying
the street cars. The water mains were shut off for only a few hours.

[Illustration: SPECIAL RIVETED RECTANGULAR WATER PIPE, OVER ROOF OF
SUBWAY AT 126TH STREET AND LENOX AVENUE]

As has been said, the typical subway near the surface was used for
about one-half of the road. Since the sewers were at such a depth as
to interfere with the construction of the subway, it meant that the
sewers along that half had to be reconstructed. This indicates but
very partially the magnitude of the sewer work, however, because
nearly as many main sewers had to be reconstructed off the route of
the subway as on the route; 7.21 miles of main sewers along the route
were reconstructed and 5.13 miles of main sewers off the route. The
reason why so many main sewers on streets away from the subway had to
be rebuilt, was that, from 42d Street, south, there is a natural
ridge, and before the construction of the subway sewers drained to the
East River and to the North River from the ridge. The route of the
subway was so near to the dividing line that the only way to care for
the sewers was, in many instances, to build entirely new outfall
sewers.

[Illustration: THREE-TRACK CONCRETE ARCH--117TH STREET AND BROADWAY]

A notable example of sewer diversion was at Canal Street, where the
flow of the sewer was carried into the East River instead of into the
Hudson River, permitting the sewer to be bulkheaded on the west side
and continued in use. On the east side a new main sewer was
constructed to empty into the East River. The new east-side sewer was
built off the route of the subway for over a mile. An interesting
feature in the construction was the work at Chatham Square, where a
6-1/2-foot circular brick conduit was built. The conjunction at this
point of numerous electric surface car lines, elevated railroad
pillars, and enormous vehicular street traffic, made it imperative
that the surface of the street should not be disturbed, and the sewer
was built by tunneling. This tunneling was through very fine running
sand and the section to be excavated was small. To meet these
conditions a novel method of construction was used. Interlocked
poling boards were employed to support the roof and were driven by
lever jacks, somewhat as a shield is driven in the shield system of
tunneling. The forward ends of the poling boards were supported by a
cantilever beam. The sides and front of the excavation were supported
by lagging boards laid flat against and over strips of canvas, which
were rolled down as the excavation progressed. The sewer was completed
and lined in lengths of from 1 foot to 4-1/2 feet, and at the maximum
rate of work about 12 feet of sewer were finished per week.

[Illustration: CONSTRUCTION OF FORT GEORGE TUNNEL]

At 110th Street and Lenox Avenue a 6-1/2-foot circular brick sewer
intersected the line of the subway at a level which necessitated its
removal or subdivision. The latter expedient was adopted, and three
42-inch cast-iron pipes were passed under the subway. (See photograph
on page 50.) At 149th Street and Railroad Avenue a sewer had to be
lowered below tide level in order to cross under the subway. To do
this two permanent inverted siphons were built of 48-inch cast-iron
pipe. Two were built in order that one might be used, while the other
could be shut off for cleaning, and they have proved very
satisfactory. This was the only instance where siphons were used. In
this connection it is worthy of note that the general changes referred
to gave to the city much better sewers as substitutes for the old
ones.

A number of interesting methods of providing for subsurface structures
are shown in photographs pages 51 to 54. From the General
Post-office at Park Row to 28th Street, just below the surface, there
is a system of pneumatic mail tubes for postal delivery. Of course,
absolutely no change in alignment could be permitted while these tubes
were in use carrying mail. It was necessary, therefore, to support
them very carefully. The slightest deviation in alignment would have
stopped the service.

[Illustration: TWO COLUMN BENT VIADUCT]

[Illustration: TRAVELER FOR ERECTING FORMS, CENTRAL PARK TUNNEL--(IN
THIS TUNNEL DUCTS ARE BUILT IN THE SIDEWALLS)]

[Sidenote: _Concrete-lined
Tunnel_]

Between 33d Street and 42d Street under Park Avenue, between 116th
Street and 120th Street under Broadway, between 157th Street and Fort
George under Broadway and Eleventh Avenue (the second longest
double-track rock tunnel in the United States, the Hoosac tunnel being
the only one of greater length), and between 104th Street and Broadway
under Central Park to Lenox Avenue, the road is in rock tunnel lined
with concrete. From 116th Street to 120th Street the tunnel is 37-1/2
feet wide, one of the widest concrete arches in the world. On the
section from Broadway and 103d Street to Lenox Avenue and 110th Street
under Central Park, a two-track subway was driven through micaceous
rock by taking out top headings and then two full-width benches. The
work was done from two shafts and one portal. All drilling for the
headings was done by an eight-hour night shift, using percussion
drills. The blasting was done early in the morning and the day gang
removed the spoil, which was hauled to the shafts and the portal in
cars drawn by mules. A large part of the rock was crushed for
concrete. The concrete floor was the first part of the lining to be
put in place. Rails were laid on it for a traveler having moulds
attached to its sides, against which the walls were built. A similar
traveler followed with the centering for the arch roof, a length of
about 50 feet being completed at one operation.

[Illustration: FOUR COLUMN (TOWER) VIADUCT CONSTRUCTION]

[Illustration: MANHATTAN VALLEY VIADUCT, LOOKING NORTH]

[Illustration: ERECTION OF ARCH, MANHATTAN VALLEY VIADUCT]

On the Park Avenue section from 34th Street to 41st Street two
separate double-track tunnels were driven below a double-track
electric railway tunnel, one on each side. The work was done from four
shafts, one at each end of each tunnel. At first, top headings were
employed at the north ends of both tunnels and at the south end of the
west tunnel; at the south end of the east tunnel a bottom heading was
used. Later, a bottom heading was also used at the south end of the
west tunnel. The rock was very irregular and treacherous in character,
and the strata inclined so as to make the danger of slips a serious
one. The two headings of the west tunnel met in February and those of
the east tunnel in March, 1902, and the widening of the tunnels to the
full section was immediately begun. Despite the adoption of every
precaution suggested by experience in such work, some disturbance of
the surface above the east tunnel resulted, and several house fronts
were damaged. The portion of the tunnel affected was bulkheaded at
each end, packed with rubble and grouted with Portland cement mortar
injected under pressure through pipes sunk from the street surface
above. When the interior was firm, the tunnel was redriven, using much
the same methods that are employed for tunnels through earth when the
arch lining is built before the central core, or dumpling of earth, is
removed. The work had to be done very slowly to prevent any further
settlement of the ground, and the completion of the widening of the
other parts of the tunnels also proceeded very slowly, because as soon
as the slip occurred a large amount of timbering was introduced, which
interfered seriously with the operations. After the lining was
completed, Portland cement grout was again injected under pressure,
through holes left in the roof, until further movement of the fill
overhead was absolutely prevented.

[Illustration: COMPLETED ARCH AT MANHATTAN STREET]

As has been said, the tunnel between 157th Street and Fort George is
the second longest two-track tunnel in the United States. It was built
in a remarkably short time, considering the fact that the work was
prosecuted from two portal headings and from two shafts. One shaft was
at 168th Street and the other at 181st Street, the work proceeding
both north and south from each shaft. The method employed for the work
(Photograph on page 56) was similar to that used under Central
Park. The shafts at 168th Street and at 181st Street were located at
those points so that they might be used for the permanent elevator
equipment for the stations at these streets. These stations each have
an arch span of about 50 feet, lined with brick.

[Sidenote: _Steel Viaduct_]

The elevated viaduct construction extends from 125th Street to 133d
Street and from Dyckman Street to Bailey Avenue on the western branch,
and from Brook and Westchester Avenues to Bronx Park on the eastern, a
total distance of about 5 miles. The three-track viaducts are carried
on two column bents where the rail is not more than 29 feet above the
ground level, and on four-column towers for higher structures. In the
latter case, the posts of a tower are 29 feet apart transversely and
20 or 25 feet longitudinally, as a rule, and the towers are from 70 to
90 feet apart on centers. The tops of the towers have X-bracing and
the connecting spans have two panels of intermediate vertical sway
bracing between the three pairs of longitudinal girders. In the low
viaducts, where there are no towers, every fourth panel has zigzag
lateral bracing in the two panels between the pairs of longitudinal
girders.

[Illustration: PROFILE OF HARLEM RIVER TUNNEL AND APPROACHES]

[Illustration: SECTION OF HARLEM RIVER TUNNEL DURING CONSTRUCTION]

[Illustration: ASSEMBLING IRON WORK ON PONTOON--HARLEM RIVER TUNNEL]

The towers have columns consisting as a rule of a 16 x 7/16-inch web
plate and four 6 x 4 x 5/8-inch bulb angles. The horizontal struts in
their cross-bracing are made of four 4 x 3-inch angles, latticed to
form an I-shaped cross-section. The X-bracing consists of single 5 x
3-1/2-inch angles. The tops of the columns have horizontal cap angles
on which are riveted the lower flanges of the transverse girders; the
end angles of the girder and the top of the column are also connected
by a riveted splice plate. The six longitudinal girders are
web-riveted to the transverse girders. The outside longitudinal girder
on each side of the viaduct has the same depth across the tower as in
the connecting span, but the four intermediate lines are not so deep
across the towers. In the single trestle bents the columns are the
same as those just described, but the diagonal bracing is replaced by
plate knee-braces.

The Manhattan Valley Viaduct on the West Side line, has a total length
of 2,174 feet. Its most important feature is a two-hinged arch of
168-1/2 feet span, which carries platforms shaded by canopies, but no
station buildings. The station is on the ground between the surface
railway tracks. Access to the platforms is obtained by means of
escalators. It has three lattice-girder two-hinge ribs 24-1/2 feet
apart on centers, the center line of each rib being a parabola. Each
half rib supports six spandrel posts carrying the roadway, the posts
being seated directly over vertical web members of the rib. The chords
of the ribs are 6 feet apart and of an H-section, having four 6 x
6-inch angles and six 15-inch flange and web plates for the center rib
and lighter sections for the outside ribs. The arch was erected
without false work.

[Illustration: SHOWING CONCRETE OVER IRON WORK--HARLEM RIVER TUNNEL]

The viaduct spans of either approach to the arch are 46 to 72 feet
long. All transverse girders are 31 feet 4 inches long, and have a 70
x 3/8-inch web plate and four 6 x 4-inch angles. The two outside
longitudinal girders of deck spans are 72 inches deep and the other 36
inches. All are 3/8-inch thick and their four flange angles vary in
size from 5 x 3-1/2 to 6 x 6 inches, and on the longest spans there
are flange plates. At each end of the viaduct there is a through span
with 90-inch web longitudinal girders.

Each track was proportioned for a dead load of 330 pounds per lineal
foot and a live load of 25,000 pounds per axle. The axle spacing in
the truck was 5 feet and the pairs of axles were alternately 27 and 9
feet apart. The traction load was taken at 20 per cent. of the live
load, and a wind pressure of 500 pounds per lineal foot was assumed
over the whole structure.

[Sidenote: _Tubes under
Harlem River_]

One of the most interesting sections of the work is that which
approaches and passes under the Harlem River, carrying the two tracks
of the East Side line. The War Department required a minimum depth of
20 feet in the river at low tide, which fixed the elevation of the
roof of the submerged part of the tunnel. This part of the line, 641
feet long, consists of twin single-track cast-iron cylinders 16 feet
in diameter enveloped in a large mass of concrete and lined with the
same material. The approach on either side is a double-track concrete
arched structure. The total length of the section is 1,500 feet.

The methods of construction employed were novel in subaqueous
tunneling and are partly shown on photographs on pages 62 and 63.
The bed of the Harlem River at the point of tunneling consists of mud,
silt, and sand, much of which was so nearly in a fluid condition that
it was removed by means of a jet. The maximum depth of excavation was
about 50 feet. Instead of employing the usual method of a shield and
compressed air at high pressure, a much speedier device was contrived.

The river crossing has been built in two sections. The west section
was first built, the War Department having forbidden the closing of
more than half the river at one time. A trench was dredged over the
line of the tunnel about 50 feet wide and 39 feet below low water.
This depth was about 10 feet above the sub-grade of the tunnel. Three
rows of piles were next driven on each side of the trench from the
west bank to the middle of the river and on them working platforms
were built, forming two wharves 38 feet apart in the clear. Piles were
then driven over the area to be covered by the subway, 6 feet 4 inches
apart laterally and 8 feet longitudinally. They were cut off about 11
feet above the center line of each tube and capped with timbers 12
inches square. A thoroughly-trussed framework was then floated over
the piles and sunk on them. The trusses were spaced so as to come
between each transverse row of piles and were connected by eight
longitudinal sticks or stringers, two at the top and two at the bottom
on each side. The four at each side were just far enough apart to
allow a special tongue and grooved 12-inch sheet piling to be driven
between them. This sheathing was driven to a depth of 10 to 15 feet
below the bottom of the finished tunnel.

A well-calked roof of three courses of 12-inch timbers, separated by
2-inch plank, was then floated over the piles and sunk. It had three
timber shafts 7 x 17 feet in plan, and when it was in place and
covered with earth it formed the top of a caisson with the sheet
piling on the sides and ends, the latter being driven after the roof
was in place. The excavation below this caisson was made under air
pressure, part of the material being blown out by water jets and the
remainder removed through the airlocks in the shafts. When the
excavation was completed, the piles were temporarily braced and the
concrete and cast-iron lining put in place, the piles being cut off as
the concrete bed was laid up to them.

The second or eastern section of this crossing was carried on by a
modification of the plan just mentioned. Instead of using a temporary
timber roof on the side walls, the permanent iron and concrete upper
half of the tunnels was employed as a roof for the caisson. The trench
was dredged nearly to sub-grade and its sides provided with wharves as
before, running out to the completed half of the work. The permanent
foundation piles were then driven and a timber frame sunk over them to
serve as a guide for the 12-inch sheet piling around the site. Steel
pilot piles with water jets were driven in advance of the wood-sheet
piles, and if they struck any boulders the latter were drilled and
blasted. The steel piles were withdrawn by a six-part tackle and
hoisting engine, and then the wooden piles driven in their place.

When the piling was finished, a pontoon 35 feet wide, 106 feet long,
and 12 feet deep was built between the wharves, and upon a separate
platform or deck on it the upper half of the cast-iron shells were
assembled, their ends closed by steel-plate diaphragms and the whole
covered with concrete. The pontoon was then submerged several feet,
parted at its center, and each half drawn out endwise from beneath the
floating top of the tunnel. The latter was then loaded and carefully
sunk into place, the connection with the shore section being made by
a diver, who entered the roof through a special opening. When it was
finally in place, men entered through the shore section and cut away
the wood bottom, thus completing the caisson so that work could
proceed below it as before. Three of these caissons were required to
complete the east end of the crossing.

[Illustration: LOOKING UP BROADWAY FROM TRINITY CHURCH--SHOWING
WORKING PLATFORM AND GAS MAINS TEMPORARILY SUPPORTED OVERHEAD]

The construction of the approaches to the tunnel was carried out
between heavy sheet piling. The excavation was over 40 feet deep in
places and very wet, and the success of the work was largely due to
the care taken in driving the 12-inch sheet piling.

[Sidenote: _Methods of
Construction
Brooklyn
Extension_]

A number of interesting features should be noted in the methods of
construction adopted on the Brooklyn Extension.

The types of construction on the Brooklyn Extension have already been
spoken of. They are (1) typical flat-roof steel beam subway from the
Post-office, Manhattan, to Bowling Green; (2) reinforced concrete
typical subway in Battery Park, Manhattan, and from Clinton Street to
the terminus, in Brooklyn; (3) two single track cast-iron-lined
tubular tunnels from Battery Park, under the East River, and under
Joralemon Street to Clinton Street, Brooklyn.

Under Broadway, Manhattan, the work is through sand, the vehicular
and electric street car traffic, the network of subsurface structures,
and the high buildings making this one of the most difficult portions
of the road to build. The street traffic is so great that it was
decided that during the daytime the surface of the street should be
maintained in a condition suitable for ordinary traffic. This was
accomplished by making openings in the sidewalk near the curb, at two
points, and erecting temporary working platforms over the street 16
feet from the surface. The excavations are made by the ordinary drift
and tunnel method. The excavated material is hoisted from the openings
to the platforms and passed through chutes to wagons. On the street
surface, over and in advance of the excavations, temporary plank decks
are placed and maintained during the drifting and tunneling
operations, and after the permanent subway structure has been erected
up to the time when the street surface is permanently restored. The
roof of the subway is about 5 feet from the surface of the street,
which has made it necessary to care for the gas and water mains. This
has been done by carrying the mains on temporary trestle structures
over the sidewalks. The mains will be restored to their former
position when the subway structure is complete.

From Bowling Green, south along Broadway, State Street and in Battery
Park, where the subway is of reinforced concrete construction, the
"open cut and cover" method is employed, the elevated and surface
railroad structures being temporarily supported by wooden and steel
trusses and finally supported by permanent foundations resting on the
subway roof. From Battery Place, south along the loop work, the
greater portion of the excavation is made below mean high-water level,
and necessitates the use of heavy tongue and grooved sheeting and the
operation of two centrifugal pumps, day and night.

The tubes under the East River, including the approaches, are each
6,544 feet in length. The tunnel consists of two cast-iron tubes
15-1/2 feet diameter inside, the lining being constructed of cast-iron
plates, circular in shape, bolted together and reinforced by grouting
outside of the plates and beton filling on the inside to the depth of
the flanges. The tubes are being constructed under air pressure
through solid rock from the Manhattan side to the middle of the East
River by the ordinary rock tunnel drift method, and on the Brooklyn
side through sand and silt by the use of hydraulic shields. Four
shields have been installed, weighing 51 tons each. They are driven by
hydraulic pressure of about 2,000 tons. The two shields drifting to
the center of the river from Garden Place are in water-bearing sand
and are operated under air pressure. The river tubes are on a 3.1 per
cent. grade and in the center of the river will reach the deepest
point, about 94 feet below mean high-water level.

The typical subway of reinforced concrete from Clinton Street to the
Flatbush Avenue terminus is being constructed by the method commonly
used on the Manhattan-Bronx route. From Borough Hall to the terminus
the route of the subway is directly below an elevated railway
structure, which is temporarily supported by timber bracing, having
its bearing on the street surface and the tunnel timbers. The
permanent support will be masonry piers built upon the roof of the
subway structure. Along this portion of the route are street surface
electric roads, but they are operated by overhead trolley and the
tracks are laid on ordinary ties. It has, therefore, been much less
difficult to care for them during the construction of the subway. Work
is being prosecuted on the Brooklyn Extension day and night, and in
Brooklyn the excavation is made much more rapidly by employing the
street surface trolley roads to remove the excavated material. Spur
tracks have been built and flat cars are used, much of the removal
being done at night.

CHAPTER III

POWER HOUSE BUILDING

The power house is situated adjacent to the North River on the block
bounded by West 58th Street, West 59th Street, Eleventh Avenue, and
Twelfth Avenue. The plans were adopted after a thorough study by the
engineers of Interborough Rapid Transit Company of all the large power
houses already completed and of the designs of the large power houses
in process of construction in America and abroad. The building is
large, and when fully equipped it will be capable of producing more
power than any electrical plant ever built, and the study of the
designs of other power houses throughout the world was pursued with
the principal object of reducing to a minimum the possibility of
interruption of service in a plant producing the great power required.

The type of power house adopted provides for a single row of large
engines and electric generators, contained within an operating room
placed beside a boiler house, with a capacity of producing,
approximately, not less than 100,000 horse power when the machinery is
being operated at normal rating.

[Sidenote: _Location
and General
Plan of
Power House_]

The work of preparing the detailed plans of the power house structure
was, in the main, completed early in 1902, and resulted in the present
plan, which may briefly be described as follows: The structure is
divided into two main parts--an operating room and a boiler house,
with a partition wall between the two sections. The face of the
structure on Eleventh Avenue is 200 feet wide, of which width the
boiler house takes 83 feet and the operating section 117 feet. The
operating room occupies the northerly side of the structure and the
boiler house the southerly side. The designers were enabled to employ
a contour of roof and wall section for the northerly side that was
identical with the roof and wall contour of the southerly side, so
that the building, when viewed from either end, presents a symmetrical
appearance with both sides of the building alike in form and design.
The operating room section is practically symmetrical in its
structure, with respect to its center; it consists of a central area,
with a truss roof over same along with galleries at both sides. The
galleries along the northerly side are primarily for the electrical
apparatus, while those along the southerly side are given up chiefly
to the steam-pipe equipment. The boiler room section is also
practically symmetrical with respect to its center.

A sectional scheme of the power house arrangement was determined on,
by which the structure was to consist of five generating sections,
each similar to the others in all its mechanical details; but, at a
later date, a sixth section was added, with space on the lot for a
seventh section. Each section embraces one chimney along with the
following generating equipment:--twelve boilers, two engines, each
direct connected to a 5,000 kilowatt alternator; two condensing
equipments, two boiler-feed pumps, two smoke-flue systems, and detail
apparatus necessary to make each section complete in itself. The only
variation is the turbine plant hereafter referred to. In addition to
the space occupied by the sections, an area was set aside, at the
Eleventh Avenue end of the structure, for the passage of the railway
spur from the New York Central tracks. The total length of the
original five-section power house was 585 feet 9-1/2 inches, but the
additional section afterwards added makes the over all length of the
structure 693 feet 9-3/4 inches. In the fourth section it was decided
to omit a regular engine with its 5,000 kilowatt generator, and in its
place substitute a 5,000 kilowatt lighting and exciter outfit.
Arrangements were made, however, so that this outfit can afterward be
replaced by a regular 5,000 kilowatt traction generator.

[Illustration: CROSS SECTION OF POWER HOUSE IN PERSPECTIVE]

The plan of the power station included a method of supporting the
chimneys on steel columns, instead of erecting them through the
building, which modification allowed for the disposal of boilers in
spaces which would otherwise be occupied by the chimney bases. By this
arrangement it was possible to place all the boilers on one floor
level. The economizers were placed above the boilers, instead of
behind them, which made a material saving in the width of the boiler
room. This saving permitted the setting aside of the aforementioned
gallery at the side of the operating room, closed off from both boiler
and engine rooms, for the reception of the main-pipe systems and for a
pumping equipment below it.

The advantages of the plan can be enumerated briefly as follows: The
main engines, combined with their alternators, lie in a single row
along the center line of the operating room with the steam or
operating end of each engine facing the boiler house and the opposite
end toward the electrical switching and controlling apparatus arranged
along the outside wall. Within the area between the boiler house and
operating room there is placed, for each engine, its respective
complement of pumping apparatus, all controlled by and under the
operating jurisdiction of the engineer for that engine. Each engineer
has thus full control of the pumping machinery required for his unit.
Symmetrically arranged with respect to the center line of each engine
are the six boilers in the boiler room, and the piping from these six
boilers forms a short connection between the nozzles on the boilers
and the throttles on the engine. The arrangement of piping is alike
for each engine, which results in a piping system of maximum
simplicity that can be controlled, in the event of difficulty, with a
degree of certainty not possible with a more complicated system. The
main parts of the steam-pipe system can be controlled from outside
this area.

The single tier of boilers makes it possible to secure a high and well
ventilated boiler room with ventilation into a story constructed above
it, aside from that afforded by the windows themselves. The boiler
room will therefore be cool in warm weather and light, and all
difficulties from escaping steam will be minimized. In this respect
the boiler room will be superior to corresponding rooms in plants of
older construction, where they are low, dark, and often very hot
during the summer season. The placing of the economizers, with their
auxiliary smoke flue connections, in the economizer room, all
symmetrically arranged with respect to each chimney, removes from the
boiler room an element of disturbance and makes it possible to pass
directly from the boiler house to the operating room at convenient
points along the length of the power house structure. The location of
each chimney in the center of the boiler house between sets of six
boilers divides the coal bunker construction into separate pockets by
which trouble from spontaneous combustion can be localized, and, as
described later, the divided coal bunkers can provide for the storage
of different grades of coal. The unit basis on which the economizer
and flue system is constructed will allow making repairs to any one
section without shutting off the portions not connected directly to
the section needing repair.

The floor of the power house between the column bases is a continuous
mass of concrete nowhere less than two feet thick. The massive
concrete foundations for the reciprocating engines contain each 1,400
yards of concrete above mean high water level, and in some cases have
twice as much below that point. The total amount of concrete in the
foundations of the finished power house is about 80,000 yards.

[Illustration: CROSS-SECTION OF POWER HOUSE]

Water for condensing purposes is drawn from the river and discharged
into it through two monolithic concrete tunnels parallel to the axis
of the building. The intake conduit has an oval interior, 10 x 8-1/2
feet in size, and a rectangular exterior cross-section; the outflow
tunnel has a horseshoe-shape cross-section and is built on top of the
intake tunnel. These tunnels were built throughout in open trench,
which, at the shore end, was excavated in solid rock. At the river end
the excavation was, at some places, almost entirely through the fill
and mud and was made in a cofferdam composed chiefly of sheet piles.
As it was impossible to drive these piles across the old timber crib
which formed the old dock front, the latter was cut through by a
pneumatic caisson of wooden-stave construction, which formed part of
one side of the cofferdam. At the river end of the cofferdam the rock
was so deep that the concrete could not be carried down to its
surface, and the tunnel section was built on a foundation of piles
driven to the rock and cut off by a steam saw 19-1/2 feet below mean
hightide. This section of the tunnel was built in a 65 x 48-foot
floating caisson 24 feet deep. The concrete was rammed in it around
the moulds and the sides were braced as it sunk. After the tunnel
sections were completed, the caisson was sunk, by water ballast, to a
bearing on the pile foundation.

Adjacent to the condensing water conduits is the 10 x 15-foot
rectangular concrete tunnel, through which the underground coal
conveyor is installed between the shore end of the pier and the power
house.

[Sidenote: _Steel Work_]

The steel structure of the power house is independent of the walls,
the latter being self-supporting and used as bearing walls only for a
few of the beams in the first floor. Although structurally a single
building, in arrangement it is essentially two, lying side by side and
separated by a brick division wall.

There are 58 transverse and 9 longitudinal rows of main columns, the
longitudinal spacing being 18 feet and 36 feet for different rows,
with special bracing in the boiler house to accommodate the
arrangement of boilers. The columns are mainly of box section, made up
of rolled or built channels and cover plates. They are supported by
cast-iron bases, resting on the granite capstones of the concrete
foundation piers.

Both the boiler house and the engine house have five tiers of floor
framing below the flat portion of the roof, the three upper tiers of
the engine house forming galleries on each side of the operating room,
which is clear for the full height of the building.

The boiler house floors are, in general, framed with transverse plate
girders and longitudinal rolled beams, arranged to suit the particular
requirements of the imposed loads of the boilers, economizers, coal,
etc., while the engine-room floors and pipe and switchboard galleries
are in general framed with longitudinal plate girders and transverse
beams.

There are seven coal bunkers in the boiler house, of which five are 77
feet and two 41 feet in length by 60 feet in width at the top, the
combined maximum capacity being 18,000 tons. The bunkers are separated
from each other by the six chimneys spaced along the center line of
the boiler house. The bottom of the bunkers are at the fifth floor, at
an elevation of about 66 feet above the basement. The bunkers are
constructed with double, transverse, plate girder frames at each line
of columns, combined with struts and ties, which balance the outward
thrust of the coal against the sides. The frames form the outline of
the bunkers with slides sloping at 45 degrees, and carry longitudinal
I-beams, between which are built concrete arches, reinforced with
expanded metal, the whole surface being filled with concrete over the
tops of the beams and given a two-inch granolithic finish.

[Illustration: 58TH ST. POWER HOUSE--GENERAL PLAN OF COAL BUNKERS AND
ECONOMIZERS.]

[Illustration: 58TH ST. POWER HOUSE--GENERAL PLAN OF MAIN OPERATING
FLOOR.]

The six chimneys, spaced 108 feet apart, and occupying the space
between the ends of the adjacent coal bunkers, are supported on
plate-girder platforms in the fifth floor, leaving the space below
clear for a symmetrical arrangement of the boilers and economizers
from end to end of the building. The platforms are framed of
single-web girders 8 feet deep, thoroughly braced and carrying on
their top flanges a grillage of 20-inch I-beam. A system of bracing
for both the chimney platforms and coal bunkers is carried down to the
foundations in traverse planes about 30 feet apart.

The sixth tier of beams constitute a flat roof over a portion of the
building at the center and sides. In the engine room, at this level,
which is 64 feet above the engine-room floor, are provided the two
longitudinal lines of crane runway girders upon which are operated the
engine-room cranes. Runways for 10-ton hand cranes are also provided
for the full length of the boiler room, and for nearly the full length
of the north panel in the engine room.

Some of the loads carried by the steel structure are as follows: In
the engine house, operating on the longitudinal runways as mentioned,
are one 60-ton and one 25-ton electric traveling crane of 75 feet
span. The imposed loads of the steam-pipe galleries on the south side
and the switchboard galleries on the north side are somewhat
irregularly distributed, but are equivalent to uniform loads of 250 to
400 pounds per square foot. In the boiler house the weight of coal
carried is about 45 tons per longitudinal foot of the building; the
weight of the brick chimneys is 1,200 tons each; economizers, with
brick setting, about 4-1/2 tons per longitudinal foot; suspended
weight of the boilers 96 tons each, and the weight of the boiler
setting, carried on the first floor framing, 160 tons each. The weight
of structural steel used in the completed building is about 11,000
tons.

[Sidenote: _Power House
Superstructure_]

The design of the facework of the power house received the personal
attention of the directors of the company, and its character and the
class of materials to be employed were carefully considered. The
influence of the design on the future value of the property and the
condition of the environment in general were studied, together with
the factors relating to the future ownership of the plant by the city.
Several plans were taken up looking to the construction of a power
house of massive and simple design, but it was finally decided to
adopt an ornate style of treatment by which the structure would be
rendered architecturally attractive and in harmony with the recent
tendencies of municipal and city improvements from an architectural
standpoint. At the initial stage of the power house design Mr.
Stanford White, of the firm of McKim, Mead & White, of New York,
volunteered his services to the company as an adviser on the matter of
the design of the facework, and, as his offer was accepted, his
connection with the work has resulted in the development of the
present exterior design and the selection of the materials used.

The Eleventh Avenue façade is the most elaborately treated, but the
scheme of the main façade is carried along both the 58th and 59th
Street fronts. The westerly end of the structure, facing the river,
may ultimately be removed in case the power house is extended to the
Twelfth Avenue building line for the reception of fourteen generating
equipments; and for this reason this wall is designed plainly of less
costly material.

The general style of the facework is what may be called French
Renaissance, and the color scheme has, therefore, been made rather
light in character. The base of the exterior walls has been finished
with cut granite up to the water table, above which they have been
laid up with a light colored buff pressed brick. This brick has been
enriched by the use of similarly colored terra-cotta, which appears in
the pilasters, about the windows, in the several entablatures, and in
the cornice and parapet work. The Eleventh Avenue façade is further
enriched by marble medallions, framed with terra-cotta, and by a title