The Project Gutenberg eBook of American Rural Highways

This eBook is for the use of anyone anywhere in the United States and
most other parts of the world at no cost and with almost no restrictions
whatsoever. You may copy it, give it away or re-use it under the terms
of the Project Gutenberg License included with this eBook or online
at www.gutenberg.org. If you are not located in the United States,
you will have to check the laws of the country where you are located
before using this eBook.

Title: American Rural Highways

Author: T. R. Agg

Release date: July 16, 2009 [eBook #29420]
Most recently updated: January 5, 2021

Language: English

Other information and formats: www.gutenberg.org/ebooks/29420

Credits: Produced by Tom Roch, Richard J. Shiffer and the Online
Distributed Proofreading Team at https://www.pgdp.net (This
file was produced from images produced by Core Historical
Literature in Agriculture (CHLA), Cornell University)

*** START OF THE PROJECT GUTENBERG EBOOK AMERICAN RURAL HIGHWAYS ***

Produced by Tom Roch, Richard J. Shiffer and the Online
Distributed Proofreading Team at https://www.pgdp.net (This
file was produced from images produced by Core Historical
Literature in Agriculture (CHLA), Cornell University)

[Transcriber's Note: Every effort has been made to replicate
this text as faithfully as possible, including obsolete and
variant spellings and other inconsistencies. Text that has been
changed to correct an obvious error is noted at the end of this
ebook.

Also, on pages 47-48, the Greek letter theta is represented by
THETA. In chemical and mathematical notations, a subscript is
enclosed in braces and preceded by an underscore (e.g., H_{2}O.)]

AGRICULTURAL ENGINEERING SERIES

E. B. MCCORMICK, CONSULTING EDITOR

FORMERLY DEAN OF ENGINEERING DIVISION
KANSAS STATE AGRICULTURAL COLLEGE

AMERICAN

RURAL HIGHWAYS

_McGraw-Hill Book Co. Inc._

PUBLISHERS OF BOOKS FOR

Coal Age -- Electric Railway Journal
Electrical World -- Engineering News-Record
American Machinist -- Ingenieria Internacional
Engineering & Mining Journal -- Power
Chemical & Metallurgical Engineering
Electrical Merchandising

[Illustration: _Frontispiece_]

AMERICAN
RURAL HIGHWAYS

BY

T. R. AGG, C.E.

PROFESSOR OF HIGHWAY ENGINEERING
IOWA STATE COLLEGE

FIRST EDITION

MCGRAW-HILL BOOK COMPANY, INC.
NEW YORK: 239 WEST 39TH STREET
LONDON: 6 & 8 BOUVERIE ST., E. C. 4
1920

COPYRIGHT, 1920, BY THE
McGRAW-HILL BOOK COMPANY, INC.

PREFACE

AMERICAN RURAL HIGHWAYS was written for use as a text or reference in
courses dealing with rural highways and intended for agricultural
engineers, students in agriculture and for short courses and extension
courses. The reader is assumed to have familiarity with drawing and
surveying, but the text is adapted primarily for students who do not
receive training along the lines of the usual course in Highway or
Civil Engineering.

The text is intended to familiarize the student with the relation of
highway improvement to national progress, to indicate the various
problems of highway administration and to set forth the usual methods
of design and construction for rural highways in sufficient detail to
establish a clear understanding of the distinguishing characteristics
and relative serviceability of each of the common types of roadway
surface.

Experience with classes made up of students in agriculture or
agricultural engineering and with trade school students in road making
served as a guide in the selection and arrangement of the material.
Detailed discussion of tests of materials and of the theory of design
has to a considerable extent been eliminated as being outside of the
scope of the course for which the text is intended.

In the preparation of American Rural Highways reference was had to
many books on highway subjects and to current periodical literature.
Wherever direct extracts were made from such source, appropriate
acknowledgment appears in the text.

T. R. AGG

AMES, IOWA,
AUGUST 18, 1920.

CONTENTS

PREFACE vii

CHAPTER I

THE PURPOSE AND UTILITY OF HIGHWAYS

Transportation Problem--National in Scope--Development in
Traffic--Location or Farm to Market Traffic--Farm to Farm
Traffic--Inter-City Traffic--Inter-County and Inter-State
Traffic--Rural Education--Rural Social Life--Good Roads and
Commerce 1-12

CHAPTER II

HIGHWAY ADMINISTRATION

Township Administration--County Administration--State
Administration--Federal Administration--Special Assessments--Zone
Method of Assessing--General Taxation--Vehicle Taxes--Sinking
Fund Bonds--Annuity Bonds--Serial Bonds--Comparison of Methods
of Issuing Bonds--Desirability of Road Bonds 13-28

CHAPTER III

DRAINAGE OF ROADS

The Necessity for Drainage--Importance of Design--Surface
Drainage--Run-off--Ordinary Design of Ditches--Underground
Water--Tile Drains--Lying Tile--Culverts--Length of Culvert--
Farm Entrance Culverts--Metal Pipe--Clay and Cement Concrete
Pipe--Concrete Pipe--Endwalls for Culverts--Reinforced Concrete
Box Culverts--Drop Inlet Culverts 29-41

CHAPTER IV

ROAD DESIGN

Necessity for Planning--Road Plans--Problems of Design--
Preliminary Investigations--Road Surveys--Alignment--
Intersections--Superelevation--Tractive Resistance--Rolling
Resistance--Internal Resistance--Air Resistance--Effect of
Trades--Energy Loss on Account of Grades--Undulating Roads--
Guard Railing--Width of Roadway--Cross Section--Control of
Erosion--Private Entrances--Æsthetics 42-62

CHAPTER V

EARTH ROADS

Variations in Soils--Variation in Rainfall--Cross Sections
Elevating Grader--Maney Grader--Slip Scraper--Fresno
Scraper--Elevating Grader Work--Use of Blade Grader--
Costs--Maintenance--Value of Earth Roads 63-73

CHAPTER VI

SAND-CLAY AND GRAVEL ROADS

The Binder--Top-soil or Natural Mixtures--Sand-clay on Sandy
Roads--Sand-clay on Clay or Loam--Characteristics--Natural
Gravel--The Ideal Road Gravel--Permissible Size of Pebbles--
Wearing Properties--Utilizing Natural Gravels--Thickness
of Layer--Preparation of the Road--Trench Method--Surface
Method--Maintenance 74-88

CHAPTER VII

BROKEN STONE ROAD SURFACES

Design--Properties of the Stone--Kinds of Rocks used for
Macadam--Sizes of Stone--Earth Work--Foundation for the
Macadam--Telford Foundation--Placing the Broken Stone--
Rolling--Spreading Screenings--Bituminous Surfaces--Maintenance
Characteristics 89-97

CHAPTER VIII

CEMENT CONCRETE ROADS

Destructive Agencies--Design--Concrete Materials--Fine
Aggregate--Proportions--Measuring Materials--Preparation of the
Earth Foundation--Placing Concrete for Two-course Road--Curing
the Concrete--Expansion Joints--Reinforcing--Bituminous Coatings
on Concrete Surfaces--Characteristics--Maintenance 98-105

CHAPTER IX

VITRIFIED BRICK ROADS

Vitrified Brick--Paving Brick--Repressed Brick--Vitrified Fiber
Brick--Wire-cut-lug Brick--Tests for Quality--Other Tests--
Foundation--Sand Bedding Course--Sand Mortar Bedding Course--
Green Concrete Bedding Course--Bituminous Fillers--Mastic
Fillers--Marginal Curb 106-115

CHAPTER X

BITUMINOUS ROAD MATERIALS AND THEIR USE

Classes of Bituminous Materials--Coal Tar--Water Gas Tar--Natural
Asphalt--Petroleum Asphalt--Mixtures--Classification According to
Consistency--Road Oils--Liquid Asphalts--Asphalt Cements--
Fillers--Bitumen--Specifications--Surface Treatments--Applying
the Bituminous Binder--Finishing the Surface--Patching--
Penetration Macadam--Foundation--Upper or Wearing Course--
Patching Characteristics--Hot Mixed Macadam--Foundation--Sizes
of Stone--Mixing the Wearing Stone--Placing and Wearing
Surface--Seal Coat--Characteristics--Asphaltic Concrete--
Bitulithic or Warrenite--Topeka Asphaltic Concrete--Foundation
--Placing the Surface--Characteristics 116-129

CHAPTER XI

MAINTENANCE OF HIGHWAYS

Petrol Maintenance--Gang Maintenance--Maintenance of Earth,
Sand-clay, Gravel and Macadam Roads 130-134

Index 135

AMERICAN RURAL HIGHWAYS

CHAPTER I

THE PURPOSE AND UTILITY OF HIGHWAYS

THE DEVELOPMENT OF HIGHWAY SYSTEMS

=Transportation Problem.=--Public highways, like many other familiar
things, are utilized constantly with little thought of how
indispensable they are to the conduct of the business of a nation or
of the intimate relation they bear to the everyday life of any
community. The degree to which a nation or a community perfects its
transportation facilities is an index of its industrial progress and
public highways constitute an important element in the national
transportation system. It is to be expected that the average citizen
will think of the public highway only when it affects his own
activities and that he will concern himself but little with the broad
problem of highway improvement unless it be brought forcibly to his
attention through taxation or by publicity connected with the
advancement of specific projects.

=National in Scope.=--The improvement and extension of the highway
system is of national importance just as is development and extension
of railways, and concerted action throughout a nation is a
prerequisite to an adequate policy in regard to either. It is
inconceivable that any community in a nation can prosper greatly
without some benefit accruing to many other parts of the country.
Increased consumption, which always accompanies material prosperity,
means increased production somewhere, and people purchase from many
varied sources to supply the things that they want. Good
transportation facilities contribute greatly to community prosperity
and indirectly to national prosperity, and the benefits of highly
improved public highways are therefore national in scope. This fact
has been recognized in Europe, notably in England, France and Belgium,
where the public highways are administered largely as national
utilities.

Until recent years, highway improvement in the United States has been
subordinated to other more pressing public improvements, but during
the World War the inadequacy of the transportation system of the
United States became apparent. While such an unprecedented load upon
transportation facilities may not recur for many years, it has become
apparent that more rapid progress in highway improvement is necessary
and in the United States the subject is now likely to receive
attention commensurate with its importance.

=Development of Traffic.=--The character and extent of the highway
improvement needed in any locality is dependent entirely on the
demands of traffic. In sparsely settled areas, particularly those that
are semi-arid or arid, the amount of traffic on local roads is likely
to be small and the unimproved trails or natural roads adequate. But
as an area develops either on account of agricultural progress or the
establishment of industrial enterprises, the use of the public
highways both for business and for pleasure increases and the old
trails are gradually improved to meet, at least to some degree, the
new demands of traffic. In sparsely settled areas, it is possible for
the public to accommodate its use of the highways to the physical
condition thereof, and business is more or less regulated according to
the condition of the roads. This is not always pleasant or economical
but is the only possible arrangement. In populous districts, with
diversified activities, it becomes imperative to have year-round
usable roads in order to transact with reasonable dispatch the regular
business of the industries. Anything less will handicap normal
community progress.

The advent of the motor driven vehicle in the United States has
resulted in a greatly increased use of the public highways of
agricultural areas, even of those that are sparsely populated, because
of the convenience of the motor vehicle both for passenger and for
freight service. Probably in excess of 90 per cent of the tonnage
passing over the rural highways in the United States is carried by
motor vehicles. This class of traffic has really just developed and no
one can predict what it will be in ten years, yet it has already
introduced into the highway problem an element that has revolutionized
methods of construction and maintenance.

A different set of traffic conditions exists in those parts of the
United States where large areas are devoted primarily to industrial
pursuits, the agricultural development being of secondary importance.
Public highways connecting the industrial centers are indispensable
adjuncts to the business facilities in such communities and are
ordinarily subjected to a very large volume and tonnage of traffic
consisting principally of motor vehicles. The roads first selected for
improvement will not be those serving the agricultural interests of
the district, but rather those serving the industrial centers.
Inter-city roads of great durability and relatively high cost are
necessary for such traffic conditions.

Not infrequently the transportation needs will require a system of
both inter-city and rural highways in the same community. There are
few areas in the United States where there is no agricultural
development. It is apparent therefore that the nature of the highway
systems and the administrative organization under which they are built
and maintained will differ in various states or areas according to
the nature of development of that area agriculturally and
industrially. In planning improvements of highway systems, it is
recognized that one or more of several groups of traffic may be
encountered and that the extent and nature of the improvement must be
such as will meet the requirements of all classes of traffic, the most
important being first provided for, and that of lesser importance as
rapidly as finances permit.

KINDS OF TRAFFIC ON PUBLIC HIGHWAYS

=Local or Farm to Market Traffic.=--In strictly agricultural
communities the principal use of the highways will pertain to
agricultural activities and most of it will be between the farm and
the most convenient market center. In the ordinary state, the number
of rural families will not average more than six to eight per square
mile, but in some districts it may reach twenty families per square
mile. The travel from the district around a market center will
originate in this rather sparsely populated area and converge onto a
few main roads leading to market. The outlying or feeder roads will be
used by only a few families, but the density of traffic will increase
nearer the market centers and consequently the roads nearer town will
be much more heavily traveled than the outlying ones. It is apparent
therefore that considerable difference may exist in the kind of
construction adequate for the various sections of road where farm
traffic is the principal consideration. This traffic is made up of
horse drawn wagons, transporting farm products and of horse drawn and
motor passenger vehicles, the motor traffic comprising 80 per cent or
more of the volume of traffic and a greater per cent of the tonnage.
Motor trucks are now employed to some extent for marketing farm
products and, where surfaced highways have been provided, this class
of traffic is superseding horse drawn traffic.

=Farm to Farm Traffic.=--In the ordinary prosecution of farming
operations, a considerable amount of neighborhood travel is
inevitable. Farmers help each other with certain kinds of work,
exchange commodities such as seed, machinery and farm animals and
visit back and forth both for business and pleasure. To accommodate
this traffic, it is desirable to provide good neighborhood roads.
Traffic of this sort follows no particular route and can to some
extent accommodate itself to the condition of the highways without
entailing financial loss, although some discomfort and some
inconvenience may result from inadequate highway facilities. This
traffic will be partly motor and partly horse drawn, but the
proportion of motor driven is large.

=Inter-city Traffic.=--In strictly agricultural districts there is a
large amount of travel between towns, both for business and for
pleasure. The pleasure travel is mostly in motor vehicles and a
considerable part of the business traffic is the same, although horse
drawn vehicles are employed to some extent.

In industrial districts there is a large volume of this class of
traffic consisting of motor passenger vehicles used for business and
for pleasure and of motor freight vehicles used for general business
purposes. In addition, there is certain to be a large amount of motor
truck freight traffic incident to the particular industrial pursuits
of the cities. Where adequate public highways connect industrial
centers, there is invariably a very large amount of inter-city
traffic, due in part to the needs of industry and in part to
concentration of population in industrial centers.

=Inter-County and Inter-State Traffic.=--Automobile touring is a
popular means of relaxation, especially on the part of those who live
in the cities, although it is by no means confined to them. Traffic of
this kind follows the routes where roads are best and passes entirely
across a county, attracted by some public gathering. Often it is
inter-state in character, made up of tourists who are traveling to
distant pleasure resorts. Such traffic at present constitutes a
relatively small part of the travel on public highways, except on
certain favorable routes, but as the wealth of the country increases
and good touring roads are numerous, long distance travel will
increase and will eventually necessitate the construction of a number
of well maintained national highways, located with reference to the
convenience of the automobile tourist.

PUBLIC HIGHWAYS AND COMMUNITY LIFE

It is well to recognize the intimate relation public highways bear to
the economic progress of a nation. Normal development of all of the
diverse activities of a people depends very largely upon the highway
policy that is adopted and whether the actual construction of
serviceable roads keeps pace with transportation needs.

=Rural Education.=--It has become increasingly apparent during the
World War that the demand upon North America for food stuffs is to
become more and more insistent as the years pass. Already the
consumption in the United States has approached quite closely to the
average production and yet the population is constantly increasing.
The time is not far distant when greater production will be required
of the agricultural area in North America in order to meet the home
demand for foodstuffs, and many thousands of tons will be needed for
export. This need can only be met by agricultural methods that will
increase greatly the present yield of the soil. The adoption of better
agricultural methods must of necessity be preceded by the technical
training of the school children who will be the farmers of the next
generation, which can best be accomplished in graded schools with well
equipped laboratories and with suitably trained teachers. The problem
of providing such schools in rural communities has, in some instances,
been solved by consolidating a number of rural school districts and
constructing a well equipped building to accommodate the students from
an area several miles square. An educational system of this sort can
reach its highest usefulness only when adequate public highways
facilitate attendance of pupils. The whole trend of rural educational
progress is toward a system which is predicated upon a comprehensive
highway policy in the district.

=Rural Social Life.=--Closely allied to the rural educational problem
is the rural social problem. Motor cars and good roads do a great deal
to eliminate the isolation and lack of social opportunity that has
characterized rural life in the United States. A high order of
citizenship in rural communities is essential to the solution of many
problems of rural economics, and such citizens will not live away from
the social opportunities of modern life. The rural school house and
the rural church may become social centers and local plays, moving
picture shows and lectures and entertainments of other kinds made
available to those who live in the country. Their enjoyment of these
social opportunities will be much more general if the public highways
are at all times in a condition to be traveled in comfort. Good homes
and good schools on good roads are prerequisites to the solution of
many rural problems.

If there is opportunity for those who live in the cities to get some
adequate idea of rural life and the conditions under which farming
operations are carried on it will correct many misunderstandings of
the broad problems of food production and distribution. Reference has
frequently been made to the seeming desire on the part of city people
to get into the country, and, by facilitating the realization of this
desire, a great social service is rendered.

=Good Roads and Commerce.=--That good highways are almost as necessary
as are railroads to the commercial development of a nation is
recognized but, unlike the railroads, the highways are not operated
for direct profit and the responsibility of securing consideration of
the demand for improvements is not centralized. Therefore, sentiment
for road improvement has been of slow growth, and important projects
are often delayed until long after the need for them was manifest.
Movements to secure financial support for highway improvement must go
through the slow process of legislative enactment, encountering all of
the uncertainties of political action, and the resulting financial
plan is likely to be inadequate and often inequitable.

The whole commercial structure of a nation rests upon transportation,
and the highways are a part of the transportation system. The highway
problem can never receive adequate consideration until public highways
are recognized as an indispensable element in the business equipment
of a nation.

During the World War all transportation facilities were taxed to the
limit, and motor trucks were utilized for long distance freight
haulage to an extent not previously considered practicable. As a
result, the interest in the motor truck as an addition to the
transportation equipment of the nation, has been greatly stimulated.
Many haulage companies have entered the freight transportation field,
delivering commodities by truck to distances of a hundred miles or
more.

The part the motor truck will play in the future can only be
estimated, but it seems clear that the most promising field is for
shipments destined to or originating in a city of some size and a
warehouse or store not on a railroad spur, and especially when the
shipments are less than car load lots. The delays and expense incident
to handling small shipments of freight through the terminals of a
large city and carting from the unloading station to the warehouse or
other destination constitute a considerable item in the cost of
transportation.

Mr. Charles Whiting Baker, Consulting Editor of _Engineering
News-Record_, states:[1]

[1] Engineering News Record, July 10, 1919.

"It costs today as much to haul a ton of farm produce ten miles
to a railway station as it does to haul it a thousand miles over
a heavy-traffic trunk-line railway. It often costs more today to
transport a ton of merchandise from its arrival in a long train
in the freight yard on the outskirts of a great city to its
deposit in the warehouse of a merchant four or five miles away
than it has cost to haul it over a thousand miles of railway
line."

Nevertheless it seems probable that new methods of operating the motor
truck transport, and possibly new types of trucks or trucks and
trailers will be developed so that freight traffic over many roads
will be of considerable tonnage and an established part of the
transportation system of the nation. In the article above referred to
are given the following data relative to the cost of hauling on
improved roads by motor truck and these cost estimates are based on
the best information available at this time. They should be considered
as approximate only, but serve to indicate the limitations of the
truck as a competitor of the steam railway.

TABLE 1

TRUCK OPERATION COSTS, FROM REPORTS BY SIX MOTOR TRUCK
OPERATORS, DIRECT CHARGES PER DAY

+---------+-------+-------+-------+-------+-------+-------+-----------
| A | B | C | D | E | F | Average
| | | | | | | Total
+---------+-------+-------+-------+-------+-------+-------+-----------
Driver | $5.00 | $5.20 | $5.00 | $5.00 | $5.17 | $5.50 | $5.13
Tires | 3.00 | 3.75 | 2.00 | 2.00 | 2.00 | 3.00 | 2.68
Oil, etc. | .30 | ... | .30 | .50 | .25 | .25 | .35
Gasoline | 3.00 | 4.00 | 3.50 | 4.65 | 2.08 | 3.75 | 3.50
| | | | | | | ------
| | | | | | | $11.66
+---------+-------+-------+-------+-------+-------+-------+-----------

INDIRECT CHARGES PER DAY

-------------+------+------+------+------+------+------+------------
| | | | | | | Average
| A | B | C | D E | F | Total
-------------+------+------+------+------+------+------+------------
Depreciation | $3.50| $4.19| $3.60| $3.40| $3.67| $4.00| $3.77
Interest | 1.20| 1.26| 1.08| 1.22| 1.10| 1.00| 1.15
Insurance | 1.50| 2.54| 1.26| 2.10| .86| .50| 1.47
Garage | 1.00| 1.20| 1.00| 1.00| .89| 1.00| 1.01
Maintenance | .50| ...| .50| ...| 1.00| ...| .75
Overhaul | 1.33| 2.75| 1.80| 1.60| 2.00| 3.00| 2.07
License | .17| .27| .20| .20| .20| .20| .20
Body upkeep | .25| ...| .30| .10| .40| ...| .27
| | | | | | | ----
| | | | | | | $10.69
Supervision | .50| 2.93| 2.05| 1.90| ... | ... | 1.90 1.90
Lost time | 2.20| ... | 1.67| 3.40| 2.50| 1.97| 2.57 2.57
| -----| -----| -----| -----| -----| -----| -----------
| 23.45| 28.09| 24.26| 28.07| 22.12| 24.17| 26.82
-------------+------+------+------+------+------+------+------------

TABLE 2

OVERHEAD CHARGES PER YEAR FOR A 5-TON CAPACITY GASOLINE
MOTOR TRUCK RUNNING AN AVERAGE OF 50 MILES PER DAY
FOR 240 DAYS PER YEAR

Driver's wages[1] $1500
Depreciation (20% on $6000 investment) 1200
Interest (6% on $6000 investment) 360
Insurance 450
Garage (rental, upkeep, etc.) 300
Maintenance, minor repairs and supplies, tire chains, tools,
lamps, springs, equipment, etc. (estimated) 300
Complete overhaul once a year 600
License fee 60
Body upkeep, repairs, painting, etc. 90
Supervision 696
-----
Total per annum $5556

Overhead charges per day for 240 days in the year,
actual operation $23.15
Overhead charges per mile for 50 miles per day .463

[1] In the above table the driver's wages have been placed under
overhead charges because the driver is paid by the month and his
wages continue even though the truck is idle because of repairs,
bad weather or lack of business, unless, of course, the idleness
should be of long duration, when the driver might be laid off.

DIRECT CHARGES PER DAY AND PER MILE FOR 5-TON TRUCK
OPERATED AS ABOVE

------------------------------------------------+---------+---------
| Cost | Cost
| per day | per mile
------------------------------------------------+---------+---------
Tires (based on present tire guarantee) | $3.00 | $0.06
Lubricants | .50 | .01
Gasoline (3-1/2 miles per gal., 14 gal. at 25c) | 3.50 | .07
| ----- | -----
| 7.00 | 0.14
------------------------------------------------+---------+---------

Total of overhead and direct charges for 240 days per year operation,
per day $30.15
Per mile .603
Cost per ton-mile for full loads one way and empty returning .2412
Cost per ton-mile for full loads one way and half load returning .16

The significance of these figures becomes apparent when they are
compared with the cost of hauling freight over trunk-line railways
with heavy traffic where the cost per ton-mile, including terminal
charges, ranges from 1.7 _mills_ per ton-mile to 4.4 _mills_ per
ton-mile.

In view of these facts it seems reasonable to suppose that motor
vehicles for use on the public highways are more likely to be employed
to supplement the rail transport than to compete with it. To the
actual cost of operation of motor trucks given in Table 2, there
should be added the proportionate cost of maintaining the highway for
the use of the truck, which is partly covered by the item "License
Fee" in the table. The license fee would necessarily be considerably
larger if it were to compensate adequately for the wear on the
highways over which the trucks operate. This will still further
increase the cost of hauling by motor truck.

Motor trucks are employed for many kinds of hauling where their speed
and consequently their daily capacity is an advantage over team
hauling that is decidedly worth while. It probably could be shown
that for many kinds of hauling, teams are more economical than motor
trucks, but when promptness and speed and the consequent effect on
dependent activities are considered, the motor truck often has a
distinct advantage, and the use of the truck to replace horse drawn
vans is progressing rapidly. This is true not only in the cities, but
also in the smaller towns and in the country. Motor trucks have been
adopted in a great many communities for delivery of farm products to
market, and this use of the truck is certain to increase rapidly. But
trucks in this service will use the secondary roads as well as the
main or primary roads.

These observations emphasize the extent to which the highway policy of
the nation must be predicated on the use of the highways by motor
vehicles.

CHAPTER II

HIGHWAY ADMINISTRATION

The systems of highway administration extant in the various political
units in the United States present a patchwork of overlapping
authority and undetermined responsibility. Highway laws are being
constantly revised by state legislatures and with each revision there
is some change in administrative methods and often the changes are
revolutionary in character. In most states, the trend is away from
county and township administration and toward state administration,
with provision for considerable participation by the federal
government.

It will be pertinent to consider briefly the present functions of each
of the administrative authorities having duties in connection with
highway work in the United States, although these duties vary greatly
in the several states and change periodically with the action of
legislatures.

=Township Administration.=--Township or "Town" authority is a survival
of the old New England town government and the town board consists of
three or more trustees who hold office for fixed terms. The usual term
is three years, but is less in some states. The incumbent is generally
a man who has other responsibilities of a public or private nature and
who gives but little of his time to highway matters. In some states
the pay is a fixed annual salary and in others a per diem with some
limitation on the amount that may be drawn in any one year, which
limitation may be statutory or may be by common consent.

The township highway commissioners or trustees have jurisdiction over
certain of the roads in the township, usually best described as all
roads not by law placed under the jurisdiction of some other
authority. In certain instances, the township authorities have charge
of all of the roads in the township, which would mean that no "county"
or "state" roads happened to be laid out in that township. It is a
matter of general observation that the trend of legislation is toward
removing from the jurisdiction of the township officials all roads
except those upon which the traffic is principally local in character.
The actual mileage of roads in the United States that is at present
administered by township officials is large, probably constituting not
less than seventy per cent of the total mileage.

In most states the township officials are responsible for the
maintenance of the roads under their jurisdiction and also supervise
such new construction as is undertaken. This includes the construction
of culverts and bridges as a rule, but in some states the county board
of supervisors is responsible for all of the bridge and culvert work
on the township roads. In other states, the township board is
responsible only for bridges or culverts that cost less than a certain
amount specified by law (usually about $1000) and the county board
provides for the construction and upkeep of the more expensive bridges
and culverts.

Funds for the work carried out by the township road officials are
obtained by general taxation, the amount that may be levied being
limited by statute and the actual levy being any amount up to the
maximum that the township board deems necessary for its purposes. It
is the general observation that the tax levy is usually the maximum
permitted by law.

In many states, township officials are permitted to issue bonds for
road construction, almost invariably, however, with the restriction
that each issue must be approved by the voters of the township. There
is always a provision that the total amount of bonds outstanding must
not exceed the constitutional limit in force in the state. In several
states, the townships have large amounts of road bonds outstanding.

=County Administration.=--In some states the county is the smallest
administrative unit in the road system. A county board, called the
board of county supervisors or board of county commissioners
consisting of from three to fifteen members, is the administrative
authority. Its members are elected for fixed terms which vary in
length from one to five years. The county board usually has many
public responsibilities other than highway administration, and is
generally made up of men with considerably more business ability than
the average township board.

The county board has jurisdiction over all of the highways in the
county in some states, and in others it has charge of only the more
important highways. In most states, the laws set forth specifically
what highways shall be under the jurisdiction of the county
authorities.

In addition to having direct supervision of the improvement and
maintenance of the roads assigned to county administration, the county
boards in some states arrange for the construction of all culverts and
bridges on the roads that are under township supervision, or at least
the more expensive bridges and culverts on such roads. Sometimes this
is accomplished by granting county aid for township bridges, under
which system the county pays a part of the cost of the construction of
bridges on the township roads. The amount of aid varies, but is
generally about one-half of the cost, and the township and county
officials jointly assume the responsibility of arranging for the
construction by contract or otherwise.

The county board obtains funds for road work through a direct tax on
all property in the county, the maximum rate being limited by statute.
County boards are also authorized to issue bonds for road construction
under statutory restrictions and limitations similar to those
effective in the township as to total amount issued, and many
millions of dollars' worth of highway bonds have been issued by
county authorities in the United States.

=State Administration.=--In a state, the administrative authority in
highway matters is vested in a board of commissioners usually
consisting of three or more members. In a few states, the
administrative authority is delegated to a single commissioner. Where
the authority is vested in a board, that board is usually appointed by
the governor. In several states one or more members of the commission
hold that position _ex officio_; for example, in several states the
governor is by law a member of the commission, in others the secretary
of state or the dean of engineering at the State University or the
state geologist is a member of the commission. Where the
administrative authority is a single commissioner he may be elected
along with other state officers, but this is the case in only a few
states.

The authority of the state highway department varies in the several
states, but in general the departments serve in the dual capacity of
general advisers to the county and township authorities on road
matters and as the executive authority responsible for the
construction of those highways that are built entirely or in part from
state or federal funds.

State highway departments consist of the commission or commissioner,
and the technical and clerical staff required to perform the duties
imposed on the state organization. To some extent the state highway
departments are able to encourage economical and correct construction
of highways by the township and county authorities by furnishing them
standard plans and specifications and by formulating regulations to
govern the character of construction, but such efforts are likely to
be more or less ineffective unless the state authority has supervision
of the allotment of state or federal funds to the various counties and
townships. Nevertheless, most state highway departments do a great
deal of advisory work in connection with the highway construction
carried out by county and township authorities.

State highway departments are supported by funds obtained in various
ways, laws differing greatly in this respect. The necessary support is
in some states appropriated from funds obtained by general taxation,
and is in others obtained from automobile license fees. In still
others, the funds are secured by a combination of the two methods
mentioned above. In addition to these support funds, a certain part of
the money obtained as federal aid may be employed for the engineering
and inspection costs on federal aid roads. The above mentioned funds
are required to maintain the state highway department. In addition,
the departments have supervision of the expenditures of construction
funds which can be used for road construction and maintenance, and may
not be expended for salaries or other overhead expense.

In a number of states, automobile license fees are set aside for
financing road construction and maintenance, and the work paid for
from the fees is carried out under the supervision of the state
highway department.

In a number of instances, state bonds have been issued for road
construction, and the expenditure of the proceeds of the sale of road
bonds has usually been supervised by the state highway department.

All federal aid funds allotted to a state must be expended under the
direction of the state highway department.

=Federal Administration.=--Federal authority in highway work is vested
in the Bureau of Public Roads of the United States Department of
Agriculture. The official head is the Secretary of Agriculture, but
the administrative head is the Director of the Bureau. In this Bureau
are the various instrumentalities needed for carrying on
investigations and furnishing information to the various states on
highway subjects. The Bureau also supervises the construction of
federal aid roads in a general way through district engineers, each
of whom looks after the work in several states.

Funds for the support of the Bureau of Public Roads are obtained from
congressional appropriations to the Department of Agriculture and from
a percentage of the funds appropriated for federal aid.

Federal aid is money appropriated by Congress to be distributed to the
various states to stimulate road construction. It is granted to the
states on the condition that the states will expend at least an equal
amount on the projects involved. The states in turn usually give a
suitable part of the state allotment to each county. There are various
limitations as to the amount of federal aid per mile of road and the
type of construction that may be employed, but these are matters of
regulation that change from time to time.

It will be seen that each of the administrative authorities, except
the Bureau of Public Roads, is to some extent subservient to a higher
authority, and the Bureau of Public Roads is supervised by the United
States Congress. Considerable diplomacy is required on the part of any
administrative authority if his contact with other officials is to be
without friction. This is especially true in connection with the
formulation of a policy regarding the types of construction to be
adopted for an improvement. The responsibility for the selection is
variously placed on the township, county or state authority, the laws
not being uniform in this respect. If state or federal funds are
allotted to an improvement, the state authority either makes the
selection of the type of construction or the selection is made by some
subordinate authority subject to the approval of the state highway
department. Where the improvement is paid for exclusively with
township or county funds, the selection is often made by the township
or county authority without review by higher authority. Many abuses
have crept into highway administration through the unscrupulous
methods of promoters of the sale of road materials or road machinery.
A great deal of the selling activity of the agents for these
commodities is entirely irreproachable, but it is well known that such
is not always the case. As a result, the tendency of legislation is to
require the state highway department to approve contracts for
materials or construction entered into by the township or county
authorities. The state highway departments can secure the requisite
technical experts to determine the merits of materials and equipment
and, in spite of some glaring examples of inefficiency or worse, have
made a good record for impartiality and integrity as custodians of the
funds for which they are responsible.

HIGHWAY FINANCE

The paramount problem in highway administration is the development of
an adequate financial plan for carrying on road improvement. The
necessary expenditures are enormous, although the money so expended is
probably much less than the actual benefit resulting from the
improvements.

=Special Assessments.=--There is presumed to be a direct and
recognized benefit conferred on farm lands by the construction of
improved highways adjacent thereto. Therefore, it is equitable to
charge a part of the cost against the lands so benefited.

The principle of paying for public improvements by a special
assessment upon private property has been long established and a large
proportion of the public improvements in the cities and towns have
been made financially possible through the medium of special
assessments on abutting and adjacent property. The same principle has
been applied to the financing of drainage projects for reclaiming farm
lands. Recently the special assessment method has come into limited
use in financing rural highway improvements. The policy in such cases
is to assess the abutting and adjacent property in a zone along the
improved road for a percentage of the cost of the improvement. The
amount so assessed does not ordinarily exceed one-fourth of the total
cost of the improvement and may be considerably less. The assessment
is spread over an area extending back from one to six miles from the
improved road. The assessment area is generally divided into about
four zones parallel to the road. The zone next the road is assessed at
a rate arbitrarily determined as a fair measure of the benefit, and
each succeeding zone is assessed at a somewhat lower rate. Generally
about three-fourths of the total assessment is placed on the half of
the assessment area lying next to the road.

Many systems of making assessments have been proposed which are
mechanical in application after the area and rate of distribution of
benefit have been established, but in practice it is always found
necessary to make adjustments on individual parcels of land because of
variation in benefits received and it is impossible to eliminate the
exercise of human judgment in equalizing the assessments.

=Zone Method of Assessing.=--The area to be assessed on each side of
the improved road is divided into zones usually four in number, but a
larger or smaller number of zones may be adopted. The rate for each
zone is then arbitrarily determined. For a typical case, the first of
four zones would receive an assessment of 50 per cent of the amount to
be borne by the area; the second zone 25 per cent, the third 15 per
cent and the fourth 10 per cent. Other percentages sometimes adopted
are 45, 25, 20 and 10 and 60, 20, 15 and 5. The set of percentages
first mentioned seems to insure the most equitable distribution for an
area all of which is substantially equally productive.

When a road, for the improvement of which an assessment is being made,
lies on two or more sides of a parcel of land all of which is within
the assessment area, the rate is arbitrarily reduced to relieve that
parcel of land somewhat, or the assessment is first spread as above
outlined and afterward equalized as judgment dictates.

In applying the zone method some difficulty is encountered in
determining an equitable distribution on those parcels of land lying
partly in one zone and partly in another, but the rate may be arrived
at with reasonable accuracy by pro-rating in accordance with the exact
conditions.

In. Fig. 1, let it be assumed that the assessment area is to be two
miles wide, one mile on each side of the road and the various
ownerships to be indicated by the parcels of land numbered 1 to 8, as
shown. Each zone for the assessment of the 3-1/4 mile section is 1/4
mile wide and the rates for the several zones are 50, 25, 15 and 10
per cent respectively. Let it be assumed that the portion of the cost
of the 3-1/4 miles of road to be assessed on the area shown is
$20,000. The assessment would then be as follows:

------+-------+----------------------+------------+-------------
| | Rate × frontage on | Amount of |
Parcel| Rate | improved road = | Assessment | Assessment
| | assessment units | per unit[1]|
1 | 2 | 3 | 4 | 5
------+-------+----------------------+------------+-------------
1 | a 50 | 50 × 2640 = 132,000 | $0.016655 | $1558.46
| b 75 | 75 × 1320 = 99,000 | | 1153.90
2 | 40 | 40 × 2640 = 105,600 | | 1230.77
3 | 10 | 10 × 2640 = 26,400 | | 307.69
4 | 25 | 25 × 1320 = 33,000 | | 384.66
5 | [2]85 | 85 × 5280 = 448,800 | | 5230.88
6 | 15 | 15 × 5280 = 79,200 | | 923.08
7 | [2]65 | 65 × 7920 = 514,800 | | 6000.00
8 | 35 | 35 × 7920 = 277,200 | | 3230.77
| | ------------------- | | -----------
| | 1,716,000 | | $20000.00
------+-------+----------------------+------------+-------------

[1] The assessment per unit is obtained by dividing the total
assessment by the total of column three.

[2] On these two parcels, it is decided that more than half of
the zone rate should apply to the half of the zone toward the
improved road, but some modification of the rates adopted might be
justified.

[Illustration: Fig. 1]

The assessment of the cost of the east and west one-mile section of
road is made up in like manner, and let it be assumed that the portion
of the cost of this road that is to be assessed on the area shown is
$5500. The assessment area will be one mile wide and each zone
one-fourth mile in width and the rates for each zone the same as
before.

------+-------+----------------------+------------+-------------
| | Rate × frontage on | Amount of |
Parcel| Rate | improved road = | Assessment | Assessment
| | assessment units | per unit |
------|-------+----------------------+------------+-------------
1 | a 75 | 75 x 1320 = 99,000 | $0.010417 | $1031.25
| b 15 | 15 x 2640 = 39,600 | | 412.49
2 | 75 | 75 x 2640 = 198,000 | | 2062.53
3 | 50 | 50 x 1320 = 66,000 | | 687.51
4 | a 25 | 25 x 1320 = 33,000 | | 756.25
| b 15 | 15 x 2640 = 39,600 | |
5 | 10 | 10 x 3300 = 33,000 | | 343.73
6 | 10 | 10 x 1980 = 19,800 | | 206.24
------|-------| | |-------------
| | 528,000 | | 5500.00
------+-------+----------------------+------------+-------------

It will be noted that the combined assessment for the two sections of
road is especially heavy on parcels 1, 2 and 3. In order to prevent
unjust charges against such properties, laws usually limit the total
assessment against any parcel of land to a fixed percentage of a fair
market value or of the assessed value. The assessment on these parcels
would be reduced as seemed expedient and the deficit would be
distributed over the remainder of the area in the same manner as the
original assessment was spread. In practice such re-distribution is
ordinarily made by the arbitrary adjustment in accordance with what
the authorized officials consider to be fair and equitable. The method
outlined is merely a mechanical means of securing distribution and
must not be considered as an infallible method of making the
assessment. It is always necessary to review the results in the light
of the actual benefits to be presumed for each parcel of land.
Nevertheless, the method outlined will prove equitable in a majority
of cases.

=General Taxation.=--There is a general community benefit derived from
the construction of good roads in that the actual cost of marketing
farm products is lessened with a resulting lowering of the price to
the consumer. The benefit also accrues from the greater facility with
which all community business may be conducted. The introduction of
better opportunities for social, religious and educational activities
in the rural districts which results from improved highways is also a
community benefit of no mean importance. A part of the cost of road
improvement may therefore be equitably paid from funds obtained by
general taxation.

A considerable portion of the current expense of maintaining the
township and county highway work and at least a part of the cost of
maintaining state highway activities is met from funds obtained by
general taxation. Likewise, the funds required for the amortization of
bond issues are often obtained from general taxation although vehicle
license fees are sometimes used for that purpose.

General taxes are levied on all taxable property in a political unit
under statutory provisions regulating the amount of the levy and the
purpose for which the revenue is to be used. In the aggregate, the
road taxes are large but in the township or county the rate is
generally small compared to some other taxes, such as the school tax.

=Vehicle Taxes.=--The great direct benefit derived by those who
actually operate vehicles over the roads justifies the policy of
requiring a vehicle to pay a license fee in lieu of other taxes, the
funds so obtained to be used for the construction and maintenance of
public highways. In practice, this method has already been applied to
motor vehicles in most states and has proven to be an important source
of revenue. Its application to horse-drawn vehicles has not been
attempted, due probably to the fact that such horse-drawn vehicles as
use the public highways are also employed about the farm or in the
towns and the determination of an equitable basis for taxation
involves many difficulties.

The rate of the fee for motor vehicles should be based on their
destructive effect on the road so far as that is possible. The scale
of fees should therefore take account of weight and speed of vehicle
and if the license is in lieu of all other taxes, it should also be
graduated with the cost of the vehicle.

When funds are thus derived, every precaution should be taken to
insure that the money is used judiciously for construction and
especially for maintenance on those roads most useful to motor
traffic.

=Highway Bonds.=--Bond issues for road improvement afford a means of
constructing roads and paying for them while they are being used. A
very large volume of such bonds are outstanding in the United States.
Road bonds should be issued only for durable types of improvement and
the life of the bond should be well within the probable useful life of
the road surface. It is customary and highly desirable that the
general nature and extent of the improvement be established before the
bonds are issued. It is desirable that bond issues be subject to
approval by referendum before issue and that is provided in every
instance.

Highway bonds are of three classes known as Sinking Fund, Annuity and
Serial Bonds, respectively. The earlier bonds issued were almost all
of the sinking fund class, but in recent years the serial bond has
been widely employed and is probably the most satisfactory to
administer.

=Sinking Fund Bonds.=[1]--When this type of bond is employed, the
amount of the expenditure for road improvement is determined upon and
the length of the period during which tax payments shall be made is
settled. To employ a concrete example, it may be assumed that $100,000
is to be expended for road work and is to be paid at the end of ten
years. The interest rate on the bonds will vary with the condition of
the bond market and the stability of the political unit issuing the
bonds, but is usually about 5 per cent. Knowing these factors, the
amount to be added to the sinking fund each year is computed. In order
to pay the interest on the bonds, a tax of suitable rate is levied,
and in order to retire the bonds at the end of the period, a sum is
set aside each year which is supposed to be invested and draw interest
which will be added to the principle, and the principle and interest
comprise the sinking fund. The principle of the sinking fund is
obtained by tax levies, a sum being added to the principle of the
sinking fund each year.

[1] For a more detailed discussion of highway bonds see Bulletin
136, U. S. Dept. of Agriculture, which is the basis of this
discussion.

The success of this method of financing depends upon the proper
administration of the sinking fund. It must be invested with fidelity
and the fund be kept intact. Usually the sinking fund cannot be
invested at as high a rate of interest as the bonds bear and there is
some loss as a result. Road bonds bearing 5 per cent interest can
usually be sold at par while the sinking fund will usually net about 3
or 3-1/2 per cent interest. The total cost of a bond issue will be
greater by the sinking fund method than by either of the other methods
described.

=Annuity Bonds.=--Annuity bonds are drawn in such a manner that the
amount of the payment for principle and interest is the same each year
during the life of the bond. When the amount of the issue and the rate
of interest has been determined and the amount of the desired annual
payment has been determined, the number of years the bonds must run is
computed.

This method is convenient in that the amount of the tax to be levied
each year remains constant.

=Serial Bonds.=--Serial bonds are drawn so that a uniform amount of
the principle is retired each year after retirement starts and the
total interest payments decrease each year after the first bonds are
retired. The first bond may not be retired for a number of years after
the issue of the bonds, but when it once starts retirement proceeds at
a constant rate annually.

=Comparison of Methods of Issuing Bonds.=--The relative costs of
financing by either of the three methods depends upon the rate of
interest in each case and the net rate secured on the sinking fund
provided for retiring sinking fund bonds.

For comparative purposes, some typical examples are given in Table 3.
These illustrate the differences in total cost of securing $100,000 by
each of the three methods at various interest rates.

TABLE 3

TOTAL COST OF A LOAN OF $100,000 FOR 20 YEARS, INTEREST
COMPOUNDED ANNUALLY

---------+---------------------------------------+---------+---------
Annual | Sinking Fund Compounded | |
Interest | Annually at | |
on Bonds +----------+----------------+-----------+ Annuity | Serial
|3 per cent| 3-1/2 per cent | 4 per cent| |
---------+----------+----------------+-----------+---------+---------
4 | $154,431 | $150,722 | $147,163 |$147,163 | $142,000
4-1/2 | 164,431 | 160,722 | 157,163 | 153,752 | 147,250
5 | 174,431 | 170,722 | 167,163 | 160,485 | 152,500
5-1/2 | 184,431 | 180,722 | 177,163 | 167,359 | 157,750
6 | 194,431 | 190,722 | 187,163 | 174,369 | 163,000
---------+----------+----------------+-----------+---------+---------

=Desirability of Road Bonds.=--In theory the bond method of financing
enables the highway authorities to construct a large mileage of roads
in a few years and spreads the cost over the period during which the
public is being benefited. Better prices are obtained on contracts for
a large mileage than for smaller jobs, and the community can receive
the benefit more quickly than where construction proceeds piecemeal
with current funds. The vital consideration is to insure that the term
of the bonds is well within the useful life of the road, and that
ample provision is made to maintain the roads during that period.
Under proper restrictions the bond method of financing is to be
commended. The bonds are an attractive investment and readily
marketable on satisfactory terms.

CHAPTER III

DRAINAGE OF ROADS

=The Necessity for Drainage.=--The importance of drainage for all
roads subject to the effects of storm or underground water has always
been recognized by road builders, but during recent years constantly
increasing attention has been given to this phase of road
construction. It is unfortunate that there has in the past been some
tendency to consider elaborate drainage provisions less necessary
where rigid types of surfaces were employed. It has become apparent,
from the nature of the defects observed in all sorts of road surfaces,
that to neglect or minimize the importance of drainage in connection
with either earth roads or any class of surfaced roads is to invite
rapid deterioration of some sections of the roadway surface and to add
to maintenance costs.

The degree to which lack of drainage provisions affect the
serviceability of the road surface varies with the amount of
precipitation in the locality and the manner in which it is
distributed throughout the year. In the humid areas of the United
States, which are, roughly, those portions east of a north and south
line passing through Omaha and Kansas City, together with the northern
part of the Pacific slope, precipitation is generally in excess of 30
inches per year and fairly well distributed throughout the year, but
with seasonal variations in rate. In these areas, the effect of the
precipitation, both as regards its tendency to lower the stability of
soils and as an eroding agent, must be carefully provided against in
highway design.

Outside of the areas mentioned above, the precipitation is much less
than 30 inches per year and its effect as an agent of erosion is of
greatest significance, although in restricted areas there may be short
periods when the soil is made unstable by ground water.

=Importance of Design.=--The drainage system for a proposed road
improvement ought to be designed with as much care as any other
element, and, to do so, a study must be made of all factors that have
any bearing on the drainage requirements and the probable
effectiveness of the proposed drainage system. The well established
principles of land drainage should be followed so far as applicable.

The basic principle of road drainage is to minimize the effect of
water to such an extent that there will always be a layer of
comparatively dry soil of appreciable thickness under the traveled
part of the road. This layer should probably never be less than two
feet thick and for soils of a structure favorable to capillary action
it should be at least three feet thick. The means employed to
accomplish the requisite drainage will be as various as the conditions
encountered.

=Surface Drainage.=--The drainage method which is by far the most
nearly general in application is that which utilizes open ditches, and
the system which employs these ditches is usually referred to as
surface drainage. The full possibilities of this method of minimizing
the effects of storm water are rarely fully utilized in road
construction. Very frequently, deterioration of a road surface is
directly attributable to failure to provide adequately for the removal
of the storm water or water from the melting of snow that has fallen
on the road, or water that flows to the road from land adjacent
thereto. Surface water can usually most cheaply and expeditiously be
carried away in open ditches, although special conditions are
occasionally encountered which require supplementary tile drains. The
cross section commonly adopted for roads lends itself naturally to the
construction of drainage ditches at the sides of the traveled way, and
these are usually the principal dependence for the disposal of storm
water.

=Run-off.=--The capacity required of side ditches to insure
satisfactory surface drainage will be affected by the amount and
nature of the precipitation in the region where the road is built. The
annual rainfall in a region may amount to several feet, but may be
well distributed throughout the year with an absence of excessive
rainfall for short periods, that is, flood conditions may rarely
occur. In other areas, the annual rainfall may be comparatively small
but the precipitation occurs at a very high rate, that is, flood
conditions may be common, or it may be at a low rate extending over a
considerable period. These peculiarities must be known before an
adequate drainage system can be planned.

It is almost universally true in the United States that precipitation
at a very high rate will be for a relatively short duration, and
during these short periods, which usually do not exceed thirty
minutes, a portion of the water that falls on the areas adjacent to
the road and that drains to the road ditches will soak into the soil
and therefore not reach the ditches along the road. The extent to
which the water is taken up by the soil will vary with the porosity
and slope of the land and the character of the growth thereon.
Cultivated land will absorb nearly all of the water from showers up to
fifteen or twenty minutes duration; grass land a somewhat smaller
percentage; and hard baked or other impervious soil will absorb a
comparatively small amount. Rocky ground and steep slopes will absorb
very little storm water.

The surface of the road is designed to turn water rapidly to the
ditches, but when the material is the natural soil, there is always
considerable absorption of storm water. Surfaces such as sandclay,
gravel and macadam do not absorb to exceed 10 per cent of the
precipitation during short showers. Bituminous surfaces, brick and
concrete pavements, do not absorb an appreciable amount of storm
water.

Generally it is best to assume that if a rain lasts for forty-five
minutes or more, all of the water will run off, as the soil will reach
a state of saturation in that time. This is not true of deep sand, but
is for nearly all other soils.

The ditch capacity needed will therefore depend upon the area drained,
the character of the soil, the slopes and the rainfall characteristics
of the region, and upon the nature of the road surface.

For a required capacity, the cross section area of the ditch will vary
inversely as the grade, because the velocity of flow increases with an
increase in the grade of the ditch. If the surface water must be
carried along the road for distances exceeding five or six hundred
feet, the ditch must be constructed of increasing capacity toward the
outlet in order to accommodate the accumulated volume of water.

The velocity of flow varies not only with the grade, but with the
shape of the cross section, cleanness of the channel, the depth of the
water in the channel, alignment of the channel and the kind of
material in which the channel is formed. It is not necessary to go to
great refinement in the design of the side ditches for the ordinary
case where the water is carried along the road for only a few hundred
feet. The ditches are made of ample capacity by using the commonly
accepted cross section for a road, which will be discussed in a later
paragraph. But where large areas must be drained by the road ditches,
it is desirable carefully to design the side ditches. The basis for
that design is too lengthy to be included herein, and reference should
be made to a standard treatise on the subject.

=Ordinary Design of Ditches.=--For grades of one per cent or less on
roads in the humid area, the bottom of the ditch should be at least
three and one-half feet lower than the traveled surface of the road,
except for very sandy soil. For grades greater than one per cent, this
depth may be decreased one foot, and for grades of four per cent and
upward, the depth may be still less. These general rules for depth are
susceptible of variation but are believed to be the minimum except in
arid or semi-arid climates. It is far better to be too liberal in
ditch allowance than to be too conservative. In arid or semi-arid
regions, the ditch design will be based on the necessity of providing
for flood flow and preventing damage through erosion. Ordinary
drainage requirements will be satisfactory with the ditch about one
foot deep.

If the topography is such that it is evident considerable storm water
will flow from the adjacent land to the road ditches, the design must
be modified to take this into account. Sometimes such water can be
diverted by ditches well back from the road, and thus prevented from
flowing into the side ditches along the roadway. It is especially
desirable to divert water, which would otherwise flow down the slope
of a cut, by means of a ditch on the hill-side above the upper edge of
the slope of the cut.

Ditches are not effective unless they afford a free flow throughout
their length and have an outlet to a drainage channel of ample
capacity. Therefore, ditch grades should be established by survey,
especially if the gradient is less than one per cent, and the
construction work should be checked to insure that the ditch is
actually constructed as planned. A few high places in the ditch will
greatly reduce the effectiveness, although these may appear at the
time of construction to be slight. Constricted places, such as might
be due to a small amount of loose earth left in the ditch, are always
to be avoided.

Where the side ditch passes from a cut to the berm alongside a fill,
the ditch should be excavated throughout in the undisturbed natural
soil, five feet or more from the toe of the slope of the fill, and
along the filled portion of the road there should be a berm of three
or four feet between the toe of the slope of the fill and the near
edge of the ditch.

=Underground Water.=--In a preceding paragraph, mention was made of
the fact that only a part of the storm water runs off over the surface
of the ground, the larger part being absorbed by the soil. The water
thus absorbed flows downward through the pores in the soil until it is
deflected laterally by some physical characteristic of the soil
structure. The movement of underground water is affected by many
circumstances, but only two conditions need be discussed herein.

Underground water, like surface water, tends to attain a level
surface, but in so doing it may need to flow long distances through
the pores of the soil, and to overcome the resistance incident to so
doing some head will be required. That is to say, the water will be
higher at some places than at others. If a cut is made in grading the
road, the road surface may actually be lower than the ground water
level in the land adjoining the road. As a result, the water will seep
out of the side slopes in the cut and keep the ditches wet, or even
furnish enough water to occasion a flow in the ditch. Similarly, the
higher head of the underground water near the top of a hill may result
in ground water coming quite close to the surface some distance down
the hill. The remedy in both cases is tile underdrains alongside the
road to lower the ground water level so that it cannot affect the road
surface.

Sometimes the ground water encounters an impervious stratum as it
flows downward through the soil, or one that is less pervious than the
surface soil. When such is the case, the water will follow along this
stratum, and should there be an outcrop of the dense stratum, a spring
will be found at that place. This may be on a highway. The impervious
stratum may not actually outcrop but may lie only a few feet under the
surface of the road, in which case, the road surface will be so water
soaked as to be unstable. The so-called "seepy places" so often noted
along a road are generally the result of this condition. This
condition can be corrected by tile laid so as to intercept the flow at
a depth that precludes damage to the road. Commonly, the tile will be
laid diagonally across the road some distance above the section where
the effect of the water is noted, and will be turned parallel to the
road at the ditch line and carried under one of the side ditches to an
outlet.

=Tile Drains.=--Where the soil and climatic conditions are such that
the roadway at times becomes unstable because of underground water
rising to a level not far below the road surface, the ground water
level is lowered by means of tile underdrains. The function of the
tile drains in such cases is precisely the same as when employed in
land drainage; to lower the ground water level.

=Laying Tile.=--The tile lines are usually laid in trenches parallel
to the center line of the road near the ditch line and at least 4 feet
deep so as to keep the ground water level well down. They must be
carefully laid to line and grade. A good outlet must be provided and
the last few joints of pipe should be bell-and-spigot sewer pipe with
the joints filled with cement mortar. The opening of the tile should
be covered with a coarse screen to prevent animals from nesting in the
tile.

It is frequently necessary to lay a line of tile at the toe of the
slope in cuts to intercept water that will percolate under the road
from the banks at the sides. In some cases, it is desirable to
back-fill the tile trench with gravel or broken stone to insure rapid
penetration of surface water to the tile. In other instances, it is
advantageous to place catch basins about every three or four hundred
feet. These may be of concrete or of tile placed on end or may be
blind catch basins formed by filling a section of the trench with
broken stone. When a blind catch basin is used, the top should be
built up into a mound, and for a tile or concrete catch basin, a
grating of the beehive type should be used, so that flow to the tile
will not be obstructed by weeds and other trash that is carried to the
catch basin.

=Culverts.=--Culverts and bridges are a part of the drainage system
and the distinction between the two is merely a matter of size.
Generally, structures of spans less than about eight feet are classed
as culverts, but the practice is not uniform. In this discussion
culverts will be defined as of spans of 8 feet or less.

Numerous culverts are required to afford passage for storm water and
small streams crosswise of the road, and their aggregate cost is a
large item in the cost of road improvement. The size of the waterway
of a culvert required in any location will be estimated by an
inspection of the stream and existing structure, and by determining
the extent and physical characteristics of the drainage area.
Sometimes there is sufficient evidence at the site to indicate quite
closely the size required, but this should always be checked by
run-off computations. The drainage area contributing water to the
stream passing through the culvert under consideration is computed
from contour maps or from a survey of the ground, and the size of
culvert determined by one of the empirical formulas applicable to that
purpose. In these formulas, the solution depends upon the proper
selection of a factor "C" which varies in accordance with the nature
of the drainage area. Two of these that are quite widely used are as
follows:

_Myers' Formula: a = CA_

Where _a_ = area of cross section of culvert in square feet. _A_ =
area in acres of the drainage area above culvert. _C_ a factor varying
from 1 for flat country to 4 for mountainous country or rocky soil,
the exact value to be selected after an inspection of the drainage
area.

_Talbot's Formula_: Area of waterway in square feet =

_C_ [Square root of] ((Drainage area in acres)^3)

Transcriber's Note: The above formula used the mathematical
square root symbol in the original. One should read it as "C
times the square root of the Drainage area in acres cubed."

_C_ being variable according to circumstances thus:

"For steep and rocky ground _C_ varies from 2/3 to 1. For rolling
agricultural country, subject to floods at times of melting snow, and
with length of valley three or four times its width, _C_ is about 1/3,
and if stream is longer in proportion to the area, decrease _C_. In
districts not affected by accumulated snow, and where the length of
valley is several times its width, 1/5 or 1/6 or even less may be
used. _C_ should be increased for steep side slopes, especially if the
upper part of the valley has a much greater fall than the channel at
the culvert. The value of _C_ to be used in any case is determined
after an inspection of the drainage area."

[Illustration: Fig. 2. Design of Pipe Culvert and Bulkhead]

=Length of Culvert.=--The clear length between end walls on a culvert
should be at least equal to the width of the roadway between ditches.
This is a minimum of 20 feet for secondary roads and ranges from 24 to
30 feet for main roads. The headwall to the culvert should not be a
monument, but should be no higher than needed to prevent vehicles from
leaving the roadway at the culvert.

=Farm Entrance Culverts.=--At farm entrances, culverts are required to
carry the farm driveway across the side ditch of the road. These
culverts are usually about 16 feet along, and should be of a size
adequate to take the flow of the side ditch. The farm entrance culvert
should be of such design that it can be easily removed to permit
cleaning out the ditches with a road grader.

TYPES OF CULVERTS

Culverts constructed of concrete and poured in place are called box
culverts because of the rectangular form of the cross section.
Culverts of pre-cast pipe are known as pipe culverts. Several forms of
pipe culvert are in general use.

[Illustration: Fig. 3.--Typical Concrete Box Culvert]

=Metal Pipe.=--These may be of cast iron, steel or wrought iron. The
cast iron pipe is very durable but expensive and heavy to handle and
is not widely used in highway construction. Steel pipe has been
employed to a limited extent but its durability is questioned. At
least it is known that the pipe made from uncoated, light sheet steel
is not very durable. Sheet iron and sheets made from alloy iron
coated with spelter have been extensively used and seem to be durable,
especially when laid deep enough to eliminate possibility of damage
from heavy loads. To insure reasonable resistance to corrosion, the
metal sheets should be coated with at least one and one-half ounces of
spelter per square foot of sheet and the sheets should not be lighter
than 16 gauge for small sizes and should be heavier for the larger
sizes.

=Clay and Cement Concrete Pipe.=--The ordinary burned clay bell and
spigot pipe that is employed for sewer construction is sometimes used
for culverts. It must be very carefully bedded, preferably on a
concrete cradle and the joints filled with cement mortar. Culverts of
this type have a tendency to break under unusual loads, such as
traction engines or trucks. They may be damaged by the pressure from
freezing water, particularly when successive freezing and thawing
results in the culvert filling with mushy snow, which subsequently
freezes.

=Concrete Pipe.=--Reinforced concrete pipe is a satisfactory material
for culverts, if the pipe is properly designed. The pipe should be
carefully laid on a firm earth bed with earth carefully back-filled
and tamped around the pipe. The joints in the pipe should be filled
with cement mortar, or should be of a design that will be tight.

=Endwalls for Culverts.=--A substantial retaining wall is placed at
each end of the culvert barrel, whatever the type. This is to prevent
the end of the culvert from becoming choked with earth and to retain
the roadway at the culvert. It also indicates to the drivers the
location of the end of the culvert. The endwall extends a foot or more
below the floor of the culvert to prevent water from cutting under the
barrel. Plain concrete or stone masonry are most commonly used for
culvert endwalls.

[Illustration: Fig. 4.--Two Types of Drop Inlet Culvert]

=Reinforced Concrete Box Culverts.=--The pipe culvert is limited in
application to the smaller waterways. Reinforced concrete is
extensively used for culverts of all sizes, but especially for the
larger ones. These are usually constructed with endwalls integral with
the barrel of the culvert. Culverts of this type must be designed for
the loads anticipated to insure suitable strength and stability, and
must be constructed of a good quality of concrete. Figs. 2 and 3 show
designs for pipe and box culverts.

[Illustration: Fig. 5.--Drop Inlet Culvert]

=Drop Inlet Culverts.=--In some locations erosion has begun in the
fields adjacent to a culvert and it will probably continue until the
stream above the culvert has eroded to about the level of the floor of
the culvert. This is a reason for placing the culvert as high as the
roadway will permit, so long as the area above the culvert will be
properly drained. Considerable reclamation of land is possible if the
culvert is constructed with a box at the inlet and as shown in Fig. 4.
The area up-stream from the culvert will not erode below the level of
the top of the box at the inlet end.

Where the stream crossing the road has eroded to considerable depth or
has considerable fall, as would sometimes be the case on side hill
roads, the culvert barrel would follow the general slope of the ditch
but should have a drop inlet. This type of culvert is shown in Fig.
5.

CHAPTER IV

ROAD DESIGN

=Necessity for Planning.=--Sometimes highway improvement is the result
of spasmodic and carelessly directed work carried out at odd times on
various sections of a road, finally resulting in the worst places
being at least temporarily bettered. The grade on the steepest hills
is probably reduced somewhat and some of the worst of the low lying
sections are filled in and thereby raised. Short sections of surfacing
such as gravel or broken stone may be placed here and there. From the
standpoint of the responsible official, the road has been "improved,"
but too often such work does not produce an improvement that lasts,
and sometimes it is not even of any great immediate benefit to those
who use the roads. In nearly every instance such work costs more in
money and labor that it is worth.

Lasting improvement of public highways can be brought about only
through systematic and correlated construction carried on for a series
of years. In other words, there must be a road improvement policy
which will be made effective through some agency that is so organized
that its policies will be perpetuated and is clothed with enough
authority to be capable of enforcing the essential features of good
design and of securing the proper construction of improvements.

Details of highway construction and design must vary with many local
conditions and types of surface. The limits of grades and the many
other details of design may properly be adopted for a specific piece
of work only after an adequate investigation of the local requirements
and in the light of wide experience in supervising road improvement.

New ideas are constantly being injected into the art of road building,
but these are disseminated somewhat slowly, so that valuable devices
and improvements in methods remain long unknown except to the
comparatively few who have the means for informing themselves of all
such developments.

It follows then that the logical system of conducting road improvement
is through an agency of continuing personnel which will supervise the
preparation of suitable plans and direct the construction in
accordance with the most recent experience.

=Road Plans.=--The information shown on the plans prepared for road
improvement varies somewhat with the design and with the ideas of the
engineer as to what constitutes necessary information, but in general
the plans show the existing road and the new construction contemplated
in an amount of detail depending principally upon the character of the
construction. Simple plans suffice for grade reduction or reshaping an
earth road surface, while for the construction of paved roads, the
plans must be worked out in considerable detail. The essential
requirement is that there be given on the plans all information
necessary to enable the construction to be carried out according to
the intentions of the engineer, that all parts of the work fit
together, that the culverts are of the proper size and located at the
proper places, ditches drain properly, grades are reduced to the
predetermined rate, that excavated material is utilized and that an
exact record of the work done is retained. Plans are indispensable to
economical road construction and the preparation of the plans is the
work of the expert in road design, that is, the highway engineer.

=Problem of Design.=--The problem of road design is to prepare plans
for a road improvement with the various details so correlated as to
insure in the road constructed in accordance therewith the maximum of
safety, convenience and economy to the users thereof. The degree to
which the design will be effective will depend to a considerable
extent upon the financial limitations imposed upon the engineer, but
skill and effort on the plans will do a great deal to offset financial
handicap and no pains should be spared in the preparation of the
plans. Moreover, the plans must afford all of the information needed
by the contractor in preparing a bid for the work.

=Preliminary Investigation.=--The first step in road improvement is to
secure an adequate idea of the existing conditions on the road or
roads involved. The detail to which this information need go will
depend entirely upon the purpose of the preliminary investigation, for
before a definite plan is prepared, it may be necessary to choose the
best from among several available routes. For this purpose, it is not
always necessary to make an actual instrument survey of the several
routes. A hasty reconnaissance will usually be sufficient. This is
made by walking or riding over the road and noting, in a suitable book
or upon prepared blanks, the information needed. The items of
information recorded will usually be as follows: distances, grades,
type of soil on the road and nature of existing surface, character of
drainage, location of bridges and culverts and the type of each with
notes as to its condition, location of railway crossings and notes as
to type, location of intersecting roads, farm entrances, and all
similar features that have a bearing on the choice of routes. These
data can be obtained in a comparatively short time by a skilled
observer who may drive over the road in a motor car. Sometimes it may
be desirable to make a more careful study of some certain sections of
road and this may be done by waking over the section in question in
order to make a more deliberate survey of the features to be
considered than is possible when riding in a motor car.

Factors other than relative lengths of routes will obviously determine
the cost of improvement and the comparative merits of the improved
roads. Some special characteristic of a road, such as bad railroad
crossings or a few bad hills, may eliminate a route, or availability
of materials along a route may offset disadvantages of alignment or
grade.

In special cases, complete surveys of routes may be required finally
to select the best route, but these instances are few in number.

=Road Surveys.=--When a road has been definitely selected for
improvement, a careful survey is made to furnish information for the
preparation of the plans. This will consist of a transit survey and a
level survey.

The transit survey is made by running a line between established
corners following the recorded route of the road, or if no records are
available or the road is irregular in alignment, by establishing
arbitrary reference points and running a line along the center line of
the existing road or parallel thereto. The topography is referenced to
this line in such completeness that it can be reproduced on the plans.
The level survey consists in taking levels on cross sections of the
road at one hundred foot intervals, and oftener if there are abrupt
changes in grade. Special level determinations are made at streams,
railroad crossings, intersecting roads or lanes and wherever it
appears some special features of the terrain should be recorded.

From the surveys and such other information as has been assembled
relative to the project, a plan is prepared which embodies a design
presumed to provide for an improvement in accordance with the best
highway practice.

THE PROBLEM OF DESIGN

It will be convenient to consider separately the components of a road
design, although in the actual design the consideration of these
cannot be separated because all parts of the plan must fit together.

=Alignment.=--The alignment of the road is determined to a
considerable extent by the existing right-of-way, which may follow
section lines, regardless of topography, as is the case with many
roads in the prairie states, or it may follow the valleys, ridges, or
other favorable location in hilly country. In many places the roads of
necessity wind around among the hills in order to avoid excessive
grades. In designing an improvement, it is generally desirable to
follow the existing right-of-way so far as possible. But the element
of safety must not be lost sight of, and curves should not preclude a
view ahead for sufficient distance to insure safety to vehicles. The
necessary length of clear view ahead is usually assumed to be 250
feet, but probably 200 feet is a satisfactory compromise distance when
a greater distance cannot be obtained at reasonable cost. To secure
suitable sight distance, the curves must be of long radii, and where
possible the right-of-way on the inside of the curve should be cleared
of trees or brush that will obstruct the view. Where the topography
will not permit a long radius curve and the view is obstructed by an
embankment or by growing crops or other growth, it is desirable to
separate the tracks around the curve to eliminate the possibility of
accidents on the curve. This is readily accomplished if the road is
surfaced, but if it is not surfaced, the same end is accomplished by
making the earth road of ample width at the curve.

Relocations should be resorted to whenever they shorten distances or
reduce grades sufficiently to compensate for the cost.

=Intersections.=--At road intersections, it is always difficult to
design a curve that entirely meets the requirements of safety because
there is not enough room in the right-of-way, and enough additional
right-of-way must be secured to permit the proper design. It is not
necessary to provide an intersection that is adapted to high speed
traffic, where main roads cross, but, on the contrary, a design that
automatically causes traffic to slow up has distinct advantages.

Where a main route, improved with a hard surface, crosses secondary
roads, it is satisfactory to continue the paved surface across the
intersecting road at normal width and make no provision for the
intersecting road traffic other than a properly graded approach at the
intersection.

=Superelevation.=--On all curved sections of road, other than
intersections, account is taken of the tendency of motor cars to skid
toward the outside of the curve. This tendency is counteracted by
designing the cross section with superelevation.

[Illustration: Fig. 6]

In Fig. 6, _F_ represents the tangential force that tends to cause
skidding. _W_ represents the weight of the vehicle in pounds, THETA
= the angle of superelevated surface _c-d_, with the horizontal _c-a_.
_R_ represents the radius of the curve upon which the vehicle is
moving. _w_ is the component of the weight parallel to the surface
_c-d_, _v_ = velocity of the vehicle in feet per second. _m_ = mass
of vehicle = _W/g THETA_

_w_ = _W_ tan _THETA_

_mv^2_ _wv^2_
_F_ = ------- = ------
_R_ _gR_

If _F_ = _w_ there will be no tendency to skid; hence the rate of
superelevation necessary in any case is as follows:

_Wv^2_
_W_ tan _THETA_ = -------
_gR_

_v^2_
tan _THETA_ = -------
_gR_

The amount of superelevation required, therefore, varies as the square
of the velocity and inversely as the radius of the curve.

Theoretically, the amount of the superelevation should increase with a
decrease in the radius of the curve and should also increase as the
square of the speed of the vehicle. On account of the variation in
speeds of the vehicles, the superelevation for curves on a highway can
only be designed to suit the average speed. At turns approaching
ninety degrees, the curve is likely to be of such short radius that it
is impossible to maintain the ordinary road speed around the curve,
even with the maximum superelevation permissible. It is good practice
to provide the theoretical superelevation on all curves having radii
greater than 300 feet for vehicle speeds of the maximum allowed by
law, which is generally about 25 miles per hour. Where the radii are
less than 300 feet, the theoretical superelevation for the maximum
vehicle speeds gives a superelevation too great for motor trucks and
horse drawn vehicles and generally no charge is made in superelevation
for radii less than 300 feet, but all such curves are constructed with
the same superelevation as the curve with 300 foot radius.

The diagram in Fig. 7 shows the theoretical superelevation for various
curve radii.

[Illustration: Fig. 7. Curves showing Theoretical Superelevation for
Various Degrees of Curve for Various Speeds of Vehicle]

At the intersection of important highways, the problem is complicated
by the necessity for providing for through traffic in both directions
and for traffic which may turn in either direction and the engineer
must provide safe roadways for each class of traffic.

=Tractive Resistance.=--The adoption of a policy regarding the grades
on a road involves an understanding of the effect of variation in the
character of the surface and in rate of grade upon the energy required
to transport a load over the highway. The forces that oppose the
movement of a horse drawn vehicle are fairly well understood and their
magnitude has been measured by several observers, but comparatively
little is known about the forces opposing translation of rubber tired
self-propelled vehicles.

The resistance to translation of a vehicle is made up of three
elements: resistance of the road surface to the rolling wheel,
resistance of the air to the movement of the vehicle and internal
friction in the vehicle itself.

=Rolling Resistance.=--When the wheel of a vehicle rolls over a road
surface, both the wheel and the surface are distorted. If the wheel
has steel tires and the road surface is plastic, there will be
considerable distortion of the road surface and very little of the
wheel. A soft rubber tire will be distorted considerably by a brick
road surface. Between these extremes there are innumerable
combinations of tire and road surface encountered, but there is always
a certain amount of distortion of either road surface or wheel, or of
both, which has the same effect upon the force necessary for
translation as a slight upward grade. When both the tire and the road
surface strongly resist distortion (as steel tires on vitrified brick
paving), the resistance to translation is low but the factor of impact
is likely to be introduced. Where impact is present, energy is used up
in the pounding and grinding of the wheels on the surface, and this
factor increases as the speed of translation, and may be a
considerable item. Impact is especially significant on rough roads
with motor vehicles, particularly trucks, traveling at high speed.
These two factors (impact and rolling resistance) combined constitute
the major part of the resistance to translation for horse drawn
vehicles.

=Internal Resistance.=--For horse drawn vehicles, the internal
resistance consists of axle friction, which is small in amount. For
self-propelled vehicles, the internal resistance consists of axle
friction and friction in the driving mechanism, of which gear
friction and the churning of oil in the gear boxes is a large item.
Internal friction is of significance in all self-propelled vehicles
and especially so at high speeds.

=Air Resistance.=--At slow speeds, the resistance of still air to
translation is small, but as the speed increases, the air resistance
increases rapidly and at the usual speed of the passenger automobile
on the road becomes a very considerable part of the total resistance
to translation. This factor has no significance in connection with
horse drawn vehicles, but is to be taken into account when dealing
with self-propelled vehicles at speeds in excess of five miles per
hour.

Many determinations of tractive resistance with horse drawn vehicles
have been made from time to time and these show values that are fairly
consistent when the inevitable variations in surfaces of the same type
are taken into account. Table 4 is a composite made up of values
selected from various reliable sources and Table 5 is from experiments
by Professor J. B. Davidson on California highways.

TABLE 4

AVERAGE TRACTIVE RESISTANCE OF ROAD SURFACES TO STEEL TIRED
VEHICLES

Surface Tractive force per ton

Earth packed and dry 100
Earth dusty 106
Earth muddy 190
Sand loose 320
Gravel good 51
Gravel loose 147
Cinders well-packed 92
Oiled road--dry 61
Oiled road--wet 108
Macadam--very good 38
Macadam--average 46
Sheet asphalt 38
Asphaltic concrete 40
Vitrified brick--new 56
Wood block--good 33
Wood block--poor 42
Cobblestone 54
Granite tramway 27
Asphalt block 52
Granite block 47

TABLE 5

TRACTIVE RESISTANCES TO STEEL TIRED VEHICLES[1]

----------+-----------------+-----------------+-----------+-----------
| | Condition | Tractive | Resistance
Test No. | Kind of Road | of Road | Total lb. | per ton lb.
----------+-----------------+-----------------+-----------+-----------
29-30-31 | Concrete |Good, excellent | 83.0 | 27.6
| (unsurfaced) | | |
[2]11-12 | Concrete |Good, excellent | 90.0 | 30.0
| (unsurfaced) | | |
26-27-28 | Concrete 3/8-in.|Good, excellent | 147.6 | 49.2
| surface | | |
| asphaltic oil | | |
| and screenings| | |
13-14 | Concrete 3/8-in.|Good, excellent | 155.0 | 51.6
| surface | | |
| asphaltic oil | | |
| and screenings| | |
9-10 | Macadam, |Good, excellent | 193.0 | 64.3
| water-bound | | |
22-23 | Topeka on |Good, excellent | 205.5 | 68.5
| concrete | | |
8 | Gravel |Compact, good | 225.0 | 75.0
| | condition | |
[3]45-48 | Oil macadam |Good, new | 234.5 | 78.2
[4]46-47 | Oil macadam |Good, new | 244.0 | 81.3
38 | Gravel |Packed, in | 247.0 | 82.3
| | good condition | |
18-19-20 | Topeka on plank |Good condition, | 265.0 | 88.3
| | soft, wagon | |
| | left marks | |
34 | Earth road |Firm, 1-1/2-in. | 276.0 | 92.0
| | fine loose dust| |
24-25 | Topeka on plank |Good condition, | 278.0 | 92.6
| | but soft | |
1-2-5 | Earth road |Dust 3/4 to 2 in.| 298.0 | 99.3
3-3 | Earth |Mud, stiff, firm | 654.0 | 218.0
| | underneath | |
6-7 | Gravel |Loose, not packed| 789.0 | 263.0
----------+-----------------+-----------------+-----------+-----------

[1] Prof. J. B. Davidson in _Engineering News-Record_, August 17,
1918.

[2] Graphic record indicates that the load was being accelerated
when test was started.

[3] Drawn with motor truck at 2-1/2 miles per hour.

[4] Drawn with motor truck at 5 miles per hour.

Comparatively few data are available showing the tractive resistance
of motor vehicles, but the following tables are based on sufficient
data to serve to illustrate the general trend.

These data on the tractive resistances of an electric truck with solid
rubber tires on asphalt and bitulithic, wood, brick and granite block,
water-bonded and tar macadam, cinder and gravel road surfaces were
obtained by A. E. Kennelly and O. R. Schurig in the research division
of the electrical engineering department of the Massachusetts
Institute of Technology, and are published in Bulletin No. 10 of the
division.

An electric truck was run over measured sections, ranging from 400 to
2600 feet in length, surfaced with these various materials, at certain
speeds per hour, ranging from about 8 to about 15.5 miles per hour.
The result of the observations of speeds, tractive resistances,
conditions of surfaces, etc., were collected and studied in various
combinations.

TABLE 6

----------------------+-----------------------+-----------+----------
| | Tractive | Tractive
| |Resistance |Resistance
Type of Surface | Condition of Surface | in lbs. | in lbs.
| | per ton | per ton
| | 10 miles |12.4 miles
| | per hr. | per hr.
----------------------+-----------------------+-----------+----------
Asphalt | Good | 20.4 |
Asphalt | Poor | 22.6 | 25.5
Wood block | Good | 24.2 | 25.3
Brick block | Good | 24.6 | 26.6
Granite block | Good | 40.3 | 45.75
Brick block | Slightly worn | 25.1 | 28.0
Granite block with | | |
cement joints | Good | 25.5 | 30.2
Macadam, water bonded | Dry and hard | 23.3 | 25.8
Macadam, water bonded | Fair, heavily oiled | 35.9 | 38.7
Macadam, water bonded | Poor, damp, some holes| 36.3 | 41.6
Tar macadam | Good | 25.7 | 28.0
Tar macadam | Very soft | 36.8 | 38.7
Tar macadam | Many holes, soft, | |
| extremely poor | 52.4 | 60.6
Cinder | Fair, hard | 27.5 | 30.6
Gravel | Fair, dusty | 30.4 | 33.0
----------------------+-----------------------+-----------+----------

[Illustration: Fig. 8]

=Effect of Grades.=--Grades increase or decrease the resistance to
translation due to the fact that there is a component of the weight of
the vehicles parallel to the road surface and opposite in direction to
the motion when the load is ascending the hill and in the same
direction when the vehicle is descending. In Fig. 8 _W_ represents the
weight of the vehicle, acting vertically downward, _w_ is the
component of the weight perpendicular to the road surface and _W_{2}_
is the component parallel to the road surface.

_W_{2}_ = _W_ tan _THETA_.

tan _THETA_ = 0.01 × per cent of grade.

_W_{2}_ = 0.01 _W_ × per cent grade.

_W_{2}_ = 0.01 × 2000 × per cent of grade, for each ton
of weight of vehicle.

Hence _W_{2}_ = 20 lbs. per ton of load for each one per cent of
grade.

The gravity force acting upon a vehicle parallel to the surface on a
grade is therefore 20 lbs. per ton for each one per cent of grade and
this force tends either to retard or to accelerate the movement of the
vehicle.

Let _F_ = the sum of all forces opposing the translation of a vehicle.

_F = f_{r} + f_{i} + f_{p} + f_{a} + f_{g}_ (1)

where

_f_{r}_ = rolling resistance of road surface.
_f_{i}_ = resistance due to internal friction in the vehicle.
_f_{p}_ = resistance due to impact of the road surface.
_f_{a}_ = resistance due to air.
_f_{g}_ = resistance due to grade, which is positive when
ascending and negative when descending.

All of the above in pounds per ton of 2000 lbs.

Let _T_ = the tractive effort applied to the vehicle by any means.

_T_ >= must be greater than _F_ in order to move the vehicle.

By an inspection of (1), it will be seen that for a given vehicle and
any type of road surface, all terms are constant except _f_{a}_ and
_f_{g}_. _f_{a}_ varies as the speed of the vehicle and the driver can
materially decrease _f_{a}_ by reducing speed. _f_{g}_ varies with the
rate of grade. For any vehicle loaded for satisfactory operation on a
level road with the power available, the limiting condition is the
factor _f_{g}_. If the load is such as barely to permit motion on a
level road, any hill will stall the vehicle. Therefore, in practice
the load is always so adjusted that there is an excess of power on a
level road. If draft animals are employed the load is usually about
one fourth of that which the animals could actually move by their
maximum effort for a short period. With motor vehicles, the excess
power is provided for by gearing.

If it be assured a load of convenient size is being moved on a level
road by draft animals, there is a limit to the rate of grade up which
the load can be drawn by the maximum effort of the animals.

Tests indicate that the horse can pull at a speed of 2-1/2 miles per
hour, an amount equal to 1/8 to 1/10 of its weight, and for short
intervals can pull 3/4 of its weight. The maximum effort possible is
therefore six times the average pull, but this is possible for only
short intervals. A very short steep hill would afford a condition
where such effort would be utilized. But for hills of any length, that
is, one hundred feet or more but not to exceed five hundred feet, it
is safe to count on the draft animal pulling three times his normal
pulling power for sustained effort.

The limiting grade for the horse drawn vehicle is therefore one
requiring, to overcome the effect of grade, or _f_{g}_, a pull in
excess of three times that exerted on the level.

A team of draft animals weighing 1800 lbs. each could exert a
continuous pull of about 1/10 of their weight or 360 lbs. If it be
assumed that the character of the vehicle and the road surface is such
that _f_{r}_ + _f_{i}_ + _f_{p}_ + _f_{a}_ = 100 lbs. per gross ton on
a level section of road, then the gross load for the team would be 3.6
tons. The same team could for a short time exert an additional pull of
three times 360 lbs. or 1080 lbs. For each 1 per cent of grade a pull
of 20 lbs. per ton would be required or _f_{g}_ for the 3.6 tons load
would be 72 lbs. for each per cent of grade. At that rate, the
limiting grade for the team would be fifteen per cent.

If, however, the character of the vehicle and the road surface were
such that _f_{r}_ + _f_{i}_ + _f_{p}_ + _f_{a}_ = 60 lbs. per gross
ton on a level section of road, the gross load for the team on the
level would be 6 tons, and the limiting grade 9 per cent.

The above discussion serves to illustrate the desirability of adopting
a low ruling or limiting grade for roads to be surfaced with a
material having low tractive resistance and the poor economy of
adopting a low ruling grade for earth roads or roads to be surfaced
with material of high tractive resistance.

It may be questioned whether horse drawn traffic should be the
limiting consideration for main trunk line highways, but it is
certain that for a number of years horse drawn traffic will be a
factor on secondary roads.

In the case of motor vehicles, excess power is provided by means of
gears and no difficulty is encountered in moving vehicles over grades
up to 12 or 15 per cent, so that any grade that would ordinarily be
tolerated on a main highway will present no obstacle to motor
vehicles, but the economy of such design is yet to be investigated.

=Energy Loss on Account of Grades.=--Whether a vehicle is horse drawn
or motor driven, energy has been expended in moving it up a hill. A
part of this energy has been required to overcome the various
resistances other than grade, and that has been dissipated, but the
energy required to translate the vehicle against the resistance due to
grade has been transformed into potential energy and can be partially
or wholly recovered when the vehicle descends a grade, provided the
physical conditions permit its utilization. If the grade is so steep
as to cause the vehicle to accelerate rapidly, the brakes must be
applied and loss of energy results. The coasting grade is dependent
upon the character of the surface and the nature of the vehicle. In
the cases discussed in the preceding paragraph, the coasting grades
would be five per cent and three per cent respectively. For horse
drawn vehicles then the economical grades would be three and five per
cent, which again emphasizes the necessity of lower grades on roads
that are surfaced than on roads with no wearing surface other than the
natural soil.

The theory of grades is somewhat different when motor vehicles are
considered, since it is allowable to permit considerably higher speed
than with horse drawn vehicles before applying the brakes and the
effect of grade can be utilized not only in translating the vehicle
down the grade, but also in overcoming resistances due to mechanical
friction and the air. On long grades, a speed might be attained that
would require the use of the brake or the same condition might apply
on very steep short grades. There is at present insufficient data on
the tractive resistance and air resistance with motor vehicles to
permit the establishing of rules relative to grade, but experience
indicates a few general principles that may be accepted.

If a hill is of such rate of grade and of such length that it is not
necessary to use the brake it may be assumed that no energy loss
results so far as motor vehicles are concerned. Where there is no turn
at the bottom of the hill and the physical condition of the road
permits speeds up to thirty-five or forty miles per hour grades of
five per cent are permissible if the length does not exceed five
hundred feet and grades of three per cent one thousand feet long are
allowable. It is a rather settled conviction among highway engineers
that on trunk line highways the maximum grade should be six per cent,
unless a very large amount of grading is necessary to reach that
grade.

=Undulating Roads.=--Many hills exist upon highways, the grade of
which is much below the maximum permissible. If there are grades
ranging from 0 to 4 per cent, with a few hills upon which it is
impracticable to reach a grade of less than six per cent, it is
questionable economy to reduce the grades that are already lower than
the allowable maximum. It is especially unjustifiable to incur expense
in reducing a grade from two per cent to one and one-half per cent on
a road upon which there are also grades in excess of that amount. The
undulating road is not uneconomical unless the grades are above the
allowable maximum or are exceptionally long or the alignment follows
short radius curves.

=Safety Considerations.=--On hills it is especially desirable to
provide for safety and curves on hills are always more dangerous than
on level sections of road. Therefore, it is desirable to provide as
flat grades as possible at the curves and to cut away the berm at the
side of the road so as to give a view ahead for about three hundred
feet. Whether a road be level or on a hill, safety should always be
considered and the most important safety precaution is to provide a
clear view ahead for a sufficient distance to enable motor vehicle
drivers to avoid accidents.

[Illustration: Fig. 9.--Types of Guard Rails]

=Guard Railing.=--When a section of road is on an embankment, guard
rails are provided at the top of the side slope to serve as warnings
of danger, and to prevent vehicles from actually going over the
embankment in case of skidding, or if for any reason the driver loses
control. These are usually strongly built, but would hardly restrain a
vehicle which struck at high speed. But they are adequate for the
protection of a driver who uses reasonable care. A typical guard rail
is shown in Fig. 9, but many other designs of similar nature are
employed. At very dangerous turns a solid plank wall six or eight feet
high is sometimes built of such substantial construction as to
withstand the severest shock without being displaced.

Trees, shrubs and the berms at the side of the road in cuts are
particularly likely to obstruct the view and should be cleared or cut
back so far as is necessary to provide the proper sight distance.

=Width of Roadway.=--For roads carrying mixed traffic, 9 feet of width
is needed for a single line of vehicles and 18 feet for 2 lines of
vehicles. In accordance with the above, secondary roads, carrying
perhaps 25 to 50 vehicles per day, may have an available traveled way
18 feet wide. Those more heavily traveled may require room for three
vehicles to pass at any place and therefore have an available traveled
way 30 feet wide. Greater width is seldom required on rural highways,
and 20 feet is the prevailing width for main highways.

=Cross Section.=--The cross section of the road is designed to give
the required width of traveled way, and, in addition, provide the
drainage channels that may be needed. In regions of small rainfall the
side ditches will be of small capacity or may be entirely omitted, but
usually some ditch is provided. The transition from the traveled way
to ditch should be a gradual slope so as to avoid the danger incident
to abrupt change in the shape of the cross section. The depth of ditch
may be varied without changing to width or slope of the traveled part
of the road as shown in Fig. 10.

[Illustration: Fig. 10]

=Control of Erosion.=--The construction of a highway may be utilized
to control general erosion to some extent, particularly when public
highways exist every mile or two and are laid out on a gridiron
system, as is the case in many of the prairie states. The streams
cross the highways at frequent intervals and the culverts can be
placed so as effectually to prevent an increase in depth of the
stream. This will to some extent limit the erosion above the culvert
and if such culverts are built every mile or two along the stream,
considerable effect is produced.

Where small streams have their origin a short distance from a culvert
under which they pass, it is sometimes advisable to provide tile for
carrying the water under the road, instead of the culvert, and, by
continuing the tile into the drainage area of the culvert, eliminate
the flow of surface water and reclaim considerable areas of land.

Erosion in the ditches along a highway can be prevented by
constructing weirs across the ditch at frequent intervals, thus
effectually preventing an increase in the depth of the ditch.

Wherever water flows at a velocity sufficient to produce erosion or
where the drainage channel changes abruptly from a higher to a lower
level, paved gutters, tile or pipe channels should be employed to
prevent erosion.

=Private Entrances.=--Entrance to private property along the highway
is by means of driveways leading off the main road. These should
always be provided for in the design so as to insure easy and
convenient access to the property. The driveways will usually cross
the side ditch along the road and culverts will be required to carry
the water under the driveway. Driveways that cross a gutter by means
of a pavement in the gutter are usually unsatisfactory, and to cross
the gutter without providing a pavement is to insure stoppage of the
flow at the crossing. The culvert at a driveway entrance must be large
enough to take the ditch water readily or it will divert the water to
the roadway itself. Generally end walls on such culverts are not
required as in the case of culverts across a highway.

=Aesthetics.=--Much of the traffic on the public highways is for
pleasure and relaxation and anything that tends to increase the
attractiveness of the highways is to be encouraged. Usually the
roadside is a mass of bloom in the fall, goldenrod, asters and other
hardy annuals being especially beautiful. In some states wild roses
and other low bushes are planted to serve the two-fold purpose of
assisting to prevent erosion and to beautify the roadside. In humid
areas trees of any considerable size shade the road surface and are a
distinct disadvantage to roads surfaced with the less durable
materials such as sand-clay or gravel. It is doubtful if the same is
true of paved surfaces, but the trees should be far enough back from
the traveled way to afford a clear view ahead. Shrubs are not
objectionable from any view-point and are to be encouraged for their
beauty, so long as they do not obstruct the view at turns.

CHAPTER V

EARTH ROADS

Highways constructed without the addition of surfacing material to the
natural soil of the right-of-way are usually called earth roads. But
if the natural soil exhibits peculiar characteristics or is of a
distinct type, the road may be referred to by some distinctive name
indicating that fact. Hence, roads are referred to as clay, gumbo,
sandy or caliche roads as local custom may elect. In each case,
however, the wearing surface consists of the natural soil, which may
have been shaped and smoothed for traffic or may be in its natural
state except for a trackway formed by the vehicles that have used it.

=Variations in Soils.=--The nature of the existing soil will obviously
determine the serviceability and physical characteristics of the road
surface it affords. That is to say that even under the most favorable
conditions some earth roads will be much more serviceable than others,
due to the better stability of the natural soil. Some soils are dense
and somewhat tough when dry and therefore resist to a degree the
tendency of vehicles to grind away the particles and dissipate them in
the form of dust. Such soils retain a reasonably smooth trackway in
dry weather even when subjected to considerable traffic. Other soils
do not possess the inherent tenacity and stability to enable them to
resist the action of wheels and consequently grind away rapidly. Roads
on such soils become very dusty. These are the extremes and between
them are many types of soils or mixtures of soils possessing varying
degrees of stability, and, in consequence, differing rates of wear.
Similarly the various soils exhibit different degrees of stability
when wet.

It is to be expected that soils will differ with the geographical
location, for it is well known that there is a great variation in
soils in the various parts of the world. But wide differences are also
encountered in the soil on roads very near each other and even on
successive stretches of the same road. It is for this reason that
earth roads often exhibit great differences in serviceability even in
a restricted area.

=Vari

source: Project Gutenberg · page

Cite this

T. R. Agg. "American Rural Highways". Project Gutenberg. Public domain in the USA. https://www.gutenberg.org/ebooks/29420

JSON record · API collection · BibTeX · RIS · CSL-JSON · citation policy

Save to pass ·