Report of the Hoosac Tunnel and Troy and Greenfield Railroad, by the Joint Standing Committee of 1866.

247,866 chars · English

The Project Gutenberg eBook of Report of the Hoosac Tunnel and Troy and Greenfield Railroad, by the Joint Standing Committee of 1866.

This eBook is for the use of anyone anywhere in the United States and
most other parts of the world at no cost and with almost no restrictions
whatsoever. You may copy it, give it away or re-use it under the terms
of the Project Gutenberg License included with this eBook or online
at www.gutenberg.org. If you are not located in the United States,
you will have to check the laws of the country where you are located
before using this eBook.

Title: Report of the Hoosac Tunnel and Troy and Greenfield Railroad, by the Joint Standing Committee of 1866.

Author: Tappan Wentworth

Release date: August 6, 2012 [eBook #40427]
Most recently updated: October 23, 2024

Language: English

Other information and formats: www.gutenberg.org/ebooks/40427

Credits: Produced by Tom Cosmas

*** START OF THE PROJECT GUTENBERG EBOOK REPORT OF THE HOOSAC TUNNEL AND TROY AND GREENFIELD RAILROAD, BY THE JOINT STANDING COMMITTEE OF 1866. ***

Transcriber's Notes:

Italic text is denoted by _underscores_.

Notation for whole and fractional part is 55-416/1000

* * * * *

SENATE...... ......No. 59.
========================================

REPORT

ON THE

HOOSAC TUNNEL AND TROY AND

GREENFIELD RAILROAD,

BY THE

JOINT STANDING COMMITTEE

OF

1866.

-----

BOSTON:

WRIGHT & POTTER, STATE PRINTERS,

NO. 4 SPRING LANE.

1867.

Commonwealth of Massachusetts.

Hon. JOSEPH A. POND, _President of the Senate_.

SIR:--I herewith transmit to the legislature the Report of the Joint
Standing Committee of 1866 on the Hoosac Tunnel and Troy and Greenfield
Railroad.

I am very respectfully
Your obedient servant,

TAPPAN WENTWORTH, _Chairman_.

REPORT.

The Joint Standing Committee of 1866 on the Hoosac Tunnel and the Troy
and Greenfield Railroad, authorized to visit the tunnel and railroad,
examine into the condition and progress of the work, and to report fully
the result of such examination respectfully

REPORT:

That since the adjournment of the legislature the Committee in a body
visited the tunnel and railroad in June, and again in October, and they
continued their examination of the condition and progress of the work by
sub-committees in the months of July, August, September, November and
December; (one of the examinations being exclusively devoted to the
operations on the railroad which were commenced late in October;) the
others to the tunnel and the various structures and mechanical
operations connected therewith, including an examination of the existing
contracts, and an inquiry into the general organization adopted to carry
out the laws and purposes of the State in regard to the enterprise.

The Committee have also examined the records and the doings of the
directors of the Troy and Greenfield Railroad from the organization of
the corporation until the surrender of the railroad to the State, and
have made extracts from the records to show the financial condition of
the corporation, its dealings with the contractors for constructing the
road and tunnel, and also the embarrassed condition of the contractors
and corporation from 1855 to 1861, which finally led to the practical
abandonment of the contract on the part of Messrs. H. Haupt & Company,
and the surrender of the road to the State under the mortgages which had
been given to secure the loan advanced by the Commonwealth in aid of the
road and tunnel. These extracts from the records, with extracts from
some of the laws passed upon the subject of the railroad and tunnel,
together with remarks of the Committee upon the legislation of the
State, the doings of the directors, and their efforts and those of the
contractors to prosecute the enterprise being too long for the body of
this Report, will be found in the Appendix at A. And a synopsis of the
action and condition of the corporation at the time of, and previous to
the surrender of the road, and the relation of the contractors to the
corporation and to the State, will be stated before entering upon the
particular description of the condition and progress of the work the
present year, as observed by the Committee.

The charter of the Troy and Greenfield Railroad was granted in 1848,
authorizing the construction of a railroad from a "point on the Vermont
and Massachusetts Railroad, at or near Greenfield," to the line of the
States of New York or Vermont, to connect with any railroad that might
be constructed from or near the city of Troy in New York. Its capital
stock was limited to $3,500,000. Authority was given in the charter to
contract with any contiguous railroad leading from either of the
above-named States, for the use of the same or any part thereof, or for
operating the two roads conjointly, or for hiring such other railroad,
or for letting their own railroad to the owners of any other road which
should compose a part of the railroad line between Troy and Boston, of
which the Troy and Greenfield Railroad should be a part.

The corporation was organized June 1, 1848. April 11, 1849, the
directors voted an assessment of three per cent. upon its capital stock,
and this assessment was the only one that was substantially collected,
and on the first day of October, in the same year, they voted to put the
construction of the road under contract as soon as sufficient
subscription should be obtained therefore, commencing at Pownal,
Vermont, and Greenfield. In January, 1850, $2,203.94 had been received
into the treasury, and $2,203.57 had been expended with the approbation
of the president of the corporation, leaving in the treasurer's hand
$0.37.

Sundry assessments was voted from time to, time, the last vote being in
May, 1852, amounting in all to 75 per cent. upon the subscriptions, but
they were rescinded in July, 1858, and a new series of assessments were
afterwards made which the Committee understand were as unproductive of
beneficial results as were the former, upon which only partial payments
had been made by a portion of the subscribers.

A contract for constructing the road was made with Messrs. Gilman and
Carpenter in October, 1850. At the close of the year 1850, stock to the
amount of $250,800 had been subscribed, of which $72,000 was payable in
land damages, and $50,000 was taken by the contractors.

At this period in the history of the corporation, with $138,800 of
available cash subscription, of which three per cent. had been paid, the
corporation applied to the State for aid by a loan to enable it to
prosecute the enterprise it had assumed, and this application was
continued without success until 1854, when the legislature passed the
Act authorizing a loan of $2,000,000, upon conditions which are
particularly set forth in the Loan Act, (see Appendix A and B,) which,
modified by subsequent legislation, discloses the policy of the State in
granting its assistance to the undertaking.

It is proper to state, that at the time this loan was granted, there was
no prospect of opening this line of travel by individual efforts, and
the amount of the loan, taking into consideration the then assumed
estimates of its probable cost, shows that the State assumed to defray
the cost of an enterprise to the completion of which available
individual means had proved inadequate.

In 1855, a contract for the construction of the road and tunnel was made
with E. W. Serrell. The capital stock of the corporation was fixed at
$1,500,000. This contract was changed two or three times, and finally
ended in one executed by H. Haupt and Henry Cartwright. For an account
of these changes, and of the votes and transactions of the directors and
the contractors, reference is made to Appendix A, where the same will be
found in detail.

Upon a careful examination of these votes and transactions, the
Committee come to the conclusion that the financial embarrassments of
the corporation from the year 1855, when the first contract with E. W.
Serrell was made to the time of the suspension of the works under the
last contract with H. Haupt & Co., are apparent. And it is also apparent
that during the same time, the contractors assumed, to a very great
extent, the control and responsibility of the enterprise.

Under the first contract, and on the day of its acceptance, the
direction of the engineering operations within the tunnel was left with
the contractor; excepting measuring for estimates and the final
acceptance of the work; and on his subscribing $600,000 to the capital
stock, $800,000 (less the new subscriptions,) was added to the contract
prices for the work.

Under the second contract with Serrell, Haupt & Co., the directors voted
to substitute bonds for stock in payment of the work until 2,000 feet of
the tunnel was completed, and to pay the discounts and losses to which
the contractors might be required to submit, not exceeding fifteen per
cent. per annum; and also, to issue to the contractors bonds to the
amount of $100,000 in addition to payments. Said bonds were to be sold
or pledged by Haupt & Co., to enable them to raise means to carry on
their operations under the contract.

On the dissolution of the firm of Serrell, Haupt & Co., in July 1856,
Serrell resigned his office as director and was chosen consulting
engineer. At the same time, W. A. Galbraith, one of the contractors in
the following contract, was chosen a director. Thereupon a new contract
was made with H. Haupt, W. A. Galbraith, C. B. Duncan and Henry
Cartwright. Under this contract the estimates were to be made by the
company's engineer. In July, 1857, the records show that no payments had
been made the contractors for more than a year, and that the work could
be carried on only by the continued efforts and personal credit of the
contractors.

In February, 1858, the contract was again changed, and Messrs. Haupt and
Cartwright engaged with the corporation to complete the road and tunnel.
At this time, the records show that no payments had been made under the
previous contracts "for more than two years; that the work could only be
carried on by the continued efforts, increased expenditures, and
personal credit of the contractors."

By a provision of this contract, any revenue arising from the use of the
road, or any portion of it, was assigned to the contractors until their
claims upon the company were adjusted; and the payment of all the
company's debts was to be deferred until that of the contractors was
satisfied; and Haupt & Co. agreed to maintain the organization of the
corporation, pay its bills for printing, and advance therefore a sum not
less than $500,000.

The same year the Rensselaer Iron Company was allowed a lien on the iron
delivered to the contractors until the same was paid for. In 1859, H.
Haupt relinquished his pecuniary interest in the contract, and was
appointed chief engineer of the corporation. (See Appendix A, page 62.)
These transactions in which the contractors participated, (one of whom
was on the board of directors,) show conclusively that they were fully
apprized of the condition of the corporation, from the date of their
first connection with the work to the time of its "suspension," no claim
during the whole period having been made by them against the
Commonwealth for any work done for the corporation.

The existence of the mortgages to the State were of course well known to
the contractors. They were given in pursuance of laws passed by the
legislature, and for security of the payments received by the
contractors for their services. The right of the Commonwealth to take
possession of the railroad under the mortgages, must have been well
understood. Further, the corporation, in surrendering the road to the
State, did no injury to the contractors, for the act of surrender did
not take place until after the contractors had suspended work upon both
road and tunnel, and practically abandoned the enterprise; thus leaving
to the State the alternative, either to take possession of the work and
complete the road and tunnel, or to abandon it; and, in addition to the
loss of the advances already made, forego the anticipated benefits of an
additional avenue for Western traffic.

The treasurer's books do not show any settlement between Haupt and
Company and the corporation. The account standing upon the ledger shows
a large balance against the contractors; but the Committee are informed
that subsequent to May 30, 1863, a settlement was made upon the basis of
Mr. Stevenson's report (see Appendix A,) and that Mr. Haupt received, in
conformity with the contract of H. Haupt & Co. with the Troy and
Greenfield corporation, payment for all labor done and material
furnished by said H. Haupt & Co., for the corporation, and that all
matters between the parties have been adjusted.

Although the accounts between the contractors and the corporation are
understood to be settled, it may be interesting to examine the account
of the Commonwealth with the enterprise and compare the value of the
work done by the contractors at the time of its abandonment by them,
with the payments made to them therefore, from the treasury of the
State.

The amount paid from the State treasury for work
and materials upon the tunnel, $170,131 95
Amount paid upon the road west of the tunnel, 50,000 00
Amount paid upon the road east of the tunnel, 505,256 92
-----------
$725,388 87
Amount earned by contractors under
the contract upon the tunnel, $129,475 00
Amount earned by contractors under
the contract, upon the road west
of tunnel, 50,000 00
Amount earned by contractors under
the contract, upon the road east of
tunnel, including temporary work, 410,204 00
-----------
589,679 00
-----------
$135,709 87
Overpayment in reckoning sterling exchange, say, 44,000 00
-----------
Overpayment when the work stopped in July, 1861, $179,709 87
Further payments made upon the work by the
State from July 1861 to January 1867, 140,226 95
-----------
Total amount paid more than earned, $319,936 82

From the foregoing statement it appears that the contractors with the
Troy and Greenfield Railroad corporation, have received from the State,
three hundred and nineteen thousand nine hundred and thirty-six dollars
and eighty-two cents more than the value of the work which the
corporation surrendered under the mortgage, and that the State has lost
that amount of money in its efforts to assist in the construction of the
work. It is proper to add as the judgment of the very intelligent
chairman of the commissioners (Mr. J. W. Brooks,) from whose statement
to the Committee the foregoing figures are taken, that the loss to the
State in the transaction by the failure of Messrs. B. Haupt & Co., to
perform their contract in a proper manner, will reach the sum of three
hundred and fifty thousand dollars. (See statement, Appendix C.)

The Commonwealth having taken possession of the road and tunnel, and by
the legislation of 1862 and 1863 undertaken their construction with the
free consent of the corporation, the directors by an appropriate vote,
expressed their concurrence with the proceeding, and their reliance upon
the "good faith of the legislature" to complete the enterprise which had
exhausted the resources of its immediate projectors. The last act of the
corporation, as appears by the records, was the choice of officers in
August, 1865, when Alvah Crocker was chosen president and Wendell T.
Davis, clerk and treasurer.

DESCRIPTION OF THE TUNNEL.

The tunnel enters the eastern side of the Hoosac Mountain, in the town
of Florida, a few rods from the right bank of the Deerfield River. The
eastern summit of the mountain is 2,210 feet above tide-water, 1,499
feet above the Deerfield River, 1,429 feet above the grade of the
railroad, and is distant from the East Portal of the tunnel 6,100 feet.
The western summit is 2,510 feet above tide-water 1,788 feet above the
Hoosac River, 1,718 feet above the grade of the railroad, and 6,700 feet
distant from the West Portal. Each portal of the tunnel is 766 feet
above tide-water. The summits are 2-41/100 miles distant from each
other, and the valley between them at its lowest depression is 801 feet
above the grade of the railroad.

The length of the tunnel, from the East End to the West End, as
commenced by Mr. Haupt, is 4-84/100 miles. Its base is, at the East End,
70 feet above the Deerfield River, and at the West End, 70 feet above
the Hoosac River. Its grade, from the East End to the Central Shaft, is
18 feet per mile; from the West End to West Shaft, 26-4/10 feet per
mile; and from the West Shaft towards the Central Shaft, 21-12/100 feet
per mile. These grades are calculated to allow the free passage of water
from the centre. Should the quantity of water found in the tunnel render
feasible a reduction of this grade, a change is contemplated.

[Illustration: Profile of the Hoosac Mountains]

The dimensions of the tunnel areas follows: The rock cutting is 24 feet
high and 24 feet wide. The brick-work is 26 feet high and 26 feet wide.
The bottom of the tunnel will contain a culvert three feet deep at the
centre. Through this culvert the water from the tunnel is to be
discharged. It now receives, in addition to the water accumulating in
the tunnel, a 12-inch pipe, to carry air at a low pressure for
ventilation; an 8-inch pipe to carry air for driving the drilling
machines; and a 3-inch pipe for carrying water for use in the holes
which are being drilled. Should it be found advisable to use gas in
carrying on the work, provision is made for a 4-inch pipe to carry the
gas from the place of manufacture. The track is to be placed 3-1/2 feet
above the bottom of the rock tunnel, and 4-1/2 feet above the bottom,
where lined with brick.

The distance by the highway, from the town of North Adams, or from the
West End to the East End of the tunnel, is about nine miles. From the
first named points to the Central Shaft is about five miles, and from
the Central Shaft to the East End the distance is six miles.

The time necessary to travel from the West End to the East End, is two
hours. Loaded teams from either end to the other perform the distance
and return in a day.

_Organization of the forces employed in the construction of the Hoosac
Tunnel, June, 1866._

Chief engineer Thomas Doane, salary, $4,000 00
Two assistant engineers, salary each, 1,350 00
One " " " 1,017 25
One " " " 900 00
[The assistants were assigned to different points
upon the work.]
One messenger, 469 50
One man in the stable, 626 00
Paul Hill, superintendent, salary, 2,400 00
One clerk, 1,200 00
One master mechanic, 1,800 00
One mechanical draftsman, 1,350 00
One pattern maker, 939 00

_For Materials and Supplies:_
One cashier and paymaster, $1,200 00
One purchasing agent, 1,200 00
One freight clerk and assistant paymaster, 1,000 00
One store-keeper at East End, 1,200 00
One assistant store-keeper at East End, 780 00
One store-keeper at West End, 1,000 00
One assistant store-keeper at West End, 900 00
One helper for do. at West End, 469 50
One store-keeper at Central Shaft, 720 00

The above were contained on the engineer's pay-roll.

Since the first visit of the Committee to the tunnel, many important
changes have been made in the force above mentioned, to wit: The salary
of the chief engineer was reduced to $3,600, he to provide his
transportation to various points upon the work. One of the assistant
engineers resigned and retired, and the office of two of them has been
abolished. The salary of the superintendent has been increased to
$3,000. The office of freight clerk has been abolished, and its duties
transferred to that of paymaster and cashier. The salaries of
store-keepers and their assistants were not a charge to the State, but
were paid from the profit of their respective stores.

At the commencement of the work, it was deemed necessary to provide
stores at the three points where the operations were carried on, to
supply the workmen readily with necessaries, so that no time might be
lost by them in the important duty of making provision for their
families. But in the present state of the enterprise, it is probable
that private individuals would readily establish such stores, and
relieve the State from a duty which, although it involved no pecuniary
charge, diverted to some extent the attention of officers from their
more legitimate avocations.

FOREMEN AND OTHERS UNDER THE SUPERINTENDENT.

_At West End._

One foreman of labor, $3.00 per day
" of brickyard, 5.82 " "
" of carpenters, 3.00 " "
One time-keeper, 2.50 " "

_West Shaft._

One captain, $3.50 per day.
Two statisticians, who keep an account of
articles delivered to the workmen, and also
perform the electrical firing, 2.50 " "

_Central Shaft._

One captain, $5.00 per day.
One time-keeper--acting statistician, 2.25 " "

_East End._

One time-keeper, $3.00 per day.
One statistician, 2.50 " "
One " 8.00 " "
One foreman of masons at the East End, and
inspector of do. at West End, 5.00 " "
One foreman of carpenters, 3.00 " "

Of this list the foreman of the brickyard is a temporary appointment.
The foreman of carpenters at the West End has finished his work and
retired. The foreman of masons was discharged by the commissioners, and
has entered into the employ of Mr. Farren at the West End.

There are nine foremen of the heading gangs, two of whom have $100 per
month, and the remainder $3.00 per day.

The heading gangs consist of eleven drillers each, including the
foreman, and from three to five rockmen for removing stone. They work by
shifts of eight hours, relieving each other at 8 A. M., 4 P. M., and 12,
midnight. The blasts are made about the time of relief. The men working
on the enlargement under private contractors make two shifts a day, each
shift working ten hours. The Committee made a special examination of the
number of men employed under the engineer and superintendent, with a
view of considering whether the force actually engaged was necessary to
an economical prosecution of the enterprise, intending to suggest any
reform that might occur to them as essential; but learning that the
engineer would in the course of the year make some reduction in the
number of the men as well as of the teams employed upon the work, the
Committee deferred taking up the subject until the anticipated
reductions should have been made. And now understanding that the
commissioners have the whole matter under consideration, and that they
have already to some extent, acted thereon, the Committee for reasons
that would be obvious, withhold any recommendations or remarks upon this
point.

SYSTEM OF OPERATIONS.

The general superintendence of the labor on the work is vested in Mr.
Hill. The reports are made to the engineer. The captains in the tunnel
report weekly the proceedings of each day under the following heads, as
follows:--

Number of days' work.
of holes drilled.
of inches of holes drilled.
of drills dulled.
of pounds of powder used.
of feet of fuse used.
of sheets of paper used.
of pounds of soap used.
of pounds of candles used.
of quarts of oil used.
of lamps used.
of pounds of wicking used.

The captain at the shafts four times a month reports,--

The days' work of the engine-men.
The revolutions of the engine.
Number of pounds of coal used.
of feet of wood used.
of gallons of sperm oil used.
of gallons of kerosene oil used.
of pounds of tallow used.
of pounds of waste used.
of pounds of tar used.
of cages raised.
of cars of stone raised.
Size of pump-plunger used.
Length of stroke.

Number of strokes.
of gallons of water raised.
of boilers in use.

The materials furnished for the construction of the work are charged in
their distribution to twenty-three accounts, as will be seen by the
tabular statement of its cost. Requisitions for materials are signed by
the immediate overseer, captain or foreman; they are handed to the
superintendent for approval, and by him forwarded to the engineer. If
the requisition is approved by both, the materials are ordered, and when
furnished the applicant signs upon a duplicate his receipt for the same.
This course is pursued as well for materials taken from the State lands
as for those purchased. Suitable blanks for returns, requisitions, &c.,
are furnished to the several points, and the evidence of all the
transactions is preserved in the office of the engineer. In addition to
the above, a return of all material broken, or laid aside, is made to
the engineer, at whose office a substantial account of all materials on
hand, either in use, or out of use, may be found.

The organization of the working force, and the mode adopted for supplies
and expenditures at the various points, appear well adapted to an
efficient and economical prosecution of the enterprise.

DIVISIONS OF THE WORK.

_East End._

_Deerfield Dam._--This structure is completed. Flashboards to be used in
low stages of water may have to be occasionally renewed.

The canal is finished as far as wheelpit No. 3. The machine-shop is
about 72 feet long, and 36 feet wide. It has three turbine wheels. A
fourth wheel is designed, but is not required at the present time, and
the pit to receive it is not completed.

In the basement of the machine-shop are two compressors. The first was
put in January, 1866. It has four cylinders 13 inches in diameter, and
20 inches stroke. This compressor is used to drive the drills, and
furnish air for the blacksmith shop. The second compressor was put in
some time in October. It has four cylinders 25 inches in diameter, and
24 inches stroke, and is used for ventilation one-fourth of the time,
two hours after each blast, viz., from 8 to 10, A. M., from 4 to 6, P.
M., and from 12 to 2, A. M. The compressors work satisfactorily. The
loss of power in the transmission of air from the machine-shop to the
drills, a distance of 4,500 feet, being hardly perceptible.

In addition to the compressors, there is in the machine-shop the
following machinery, viz.: three lathes, one of them worked by hand; a
drilling machine; a planer; a bolt-cutting machine and a saw-table.
Sixty horse-power is required to carry the machine-drills, the machines
in the shop, and to furnish air for the blacksmith shop. When the large
compressor is used, 75 additional horse-power is required. A circular
saw at the east end of the machine shop, is occasionally used, driven by
power derived from the turbine wheels.

The blacksmith shop, near the entrance of the tunnel, contains three
forges. The hand-drills are made, and, together with the machine drills,
sharpened at this shop. The ordinary repairs of the drilling machines
are done in the machine shop. New parts of the same are furnished from
Fitchburg.

The heading in the tunnel at this end when driven by hand was about 15
feet wide by 6 feet high. When driven by the machines it is 16 feet wide
and 8 feet high. Its location is in the centre of the tunnel, 4-1/2 feet
above subgrade, and 1-1/2 feet above the road bed.

The force employed at this point in July last was--

Mechanics in iron, 4
Engine-men, 2
Masons, 10
Manual labor, 58
Engine and compressor men, including firemen, 6
Carpenters, 5
Blacksmiths and helpers, 8
Statisticians, 2
Runners of machine-drills, 6
Sawyer, 1
Manual laborers, 63
---
Total in July, 165

The first day of November there were employed here 115 men. There are
at this point, besides the shops and saw mill above mentioned, 2 small
offices, 1 boarding-house, 2 carpenters' shops, 2 powder-houses,
1 temporary blacksmith's shop, 1 temporary horse-stable, 3 sheds,
1 engine-house, 1 barn, 1 instrumental station-house (all used by the
State,) and 2 cottages; 6 first-class shanties, 13 common shanties,
10 temporary shanties, 1 store under school-room; with 1 cottage,
1 old store and 8 shanties, built by H. Haupt & Company, which are
rented. The cost of the shanties at the East End, excluding the
Deerfield Dam, was, in July, 1866, . . . . . . . $28,052 94
In November, 1866, . . . . . . . 31,688 99
The rents at the East End received by the State
from shanties are, . . . . . . . 1,698 00
per annum. All rents are collected monthly.

A resident engineer was stationed at the East End in charge of the work.

The progress of the excavations at the East End heading for the year
ending December, 1866, has been 569 feet; at the rate of 47.42 per
month.

The progress during the six months ending May, 1866, was 338 feet; an
average per month of 56 feet 4 inches. One week was lost in June in
introducing the machine-drills, in consequence of which the progress
that month was reduced to 50 feet 6 inches. During the five months
ending November 30, the progress has been 219-1/2 feet; being an average
of 43.9 feet per month. It will be seen by the table, that in July, the
first month after the introduction of the drill machines, the progress
attained was only 26.5 feet. As the men became better acquainted with
them, the progress was increased to 48 feet in August, and in September
it rose to 54.5, having nearly attained the average progress of the six
months preceding their introduction. Had there been an adequate supply,
there can be little doubt that the progress would have continued to
increase, and would have shown the superiority of the machine-drill over
hand-labor; but the supply fell off, and the progress in October was
reduced to 34 feet and 6 inches.

_Table showing the progress at East End Heading, from November 1, 1865,
to January 1, 1867._

===========================================
| Distance from | Progress.
DATE. | Portal. |
----------------+---------------+----------
Nov. 1, 1865, | 2,839.0 |
Dec. 1, 1865, | 2,904.0 | 65.0
Jan. 1, 1866, | 2.950.5 | 46.5
Feb. 1, 1866, | 3,005.0 | 54.5
Mar. 1, 1866, | 3,052.0 | 47.0
April, 1, 1866, | 3,115.0 | 63.0
May 1, 1866, | 3,176.5 | 61.5
June 1, 1866, | 3,227.0 | 50.5
July 1, 1866, | 3,253.5 | 26.5
Aug. 1, 1866, | 3,301.5 | 48.0
Sept. 1, 1866, | 3,356.0 | 54.5
Oct. 1, 1866, | 3,394.5 | 38.5
Nov. 1, 1866, | 3,431.0 | 36.5
Dec. 1, 1866, | 3,473.0 | 42.0
===========================================

THE CENTRAL SHAFT.

There is at this point, used by the State in the prosecution of the
work, the shaft-building, a carpenter's shop, a blacksmith's shop, a
saw-mill, powder-house, gas-house, ash-house, wood-shed, and a barn; and
in connection with the work, a store, a boarding-house, the Thacher
farm-house and out-buildings, 4 first-class and 7 common shanties. The
cost of buildings at the Central Shaft in July, 1866, was $11,080.13.
The cost in November, 1866, was $12,026.83. The annual rent of that
portion leased to operatives is $736.

A farm, containing 250 acres of land, with a dwelling-house and barn,
has been purchased, adjoining the Central Shaft, for the sum of $3,000.
The land was well covered with timber, about one-half of which has been
cut for the purposes of the shaft and tunnel. There is estimated to be
one million feet of hemlock timber still standing, which will be wanted
in the progress of the work. This purchase was an advantageous one for
the State, there having been already realized from it an amount equal to
its cost.

The working force at the Central Shaft in July, 1860, was comprised of--

Engine-men and firemen, 5
Mechanics in iron, 4

Carpenters, 5
Blacksmiths and helpers, 4
Pump men, 1
Manual laborers, 39
--
Total in July, 58

On the first day of November there were employed at this point, in all,
81. Of this number, 40 were engaged out of the shaft, and 41 in the
shaft.

The above enumeration does not include the resident engineer and
time-keeper, stationed here in November.

The depth of Central Shaft, when completed, will be 1,037 feet from the
surface; its form is an ellipse, whose axes are 27 and 15 feet. On the
fifth day of May it had reached the depth of 300.5 feet. At this time
the hoisting apparatus was removed from the shaft, and the work of
excavation ceased. The new hoisting apparatus was fitted on the first
day of August, and the drilling commenced at midnight on that day.

Previous to the change in the hoisting apparatus, the monthly progress
had averaged about 18-1/2 feet per month. The advance in October and
November was 46 feet; the gain over the previous rate of progress is
attributable to the practice of simultaneous blasting.

On the first day of January, 1867, the shaft had been sunk 393 feet,
leaving for excavation 644 feet.

_Table showing the progress at Central Shaft from November 1, 1865, to
December 1, 1866._

========================================
DATE. | Distance | Progress.
| down. |
==================+==========+==========
Nov. 1, 1865, | 200.8 |
Dec. 1, 1865, | 220.1 | 19.3
Jan. 1, 1866, | 232.5 | 12.4
Feb. 1, 1866, | 250.7 | 18.2
Mar. 1, 1866, | 264.1 | 13.4
Apr. 1, 1866, | 280.9 | 16.8
May 1, 1866, | 297.1 | 16.2
May 5, 1866, | 300.5 | 3.4
June 1, 1866,[A] | 300.5 |
July 1, 1866,[A] | 300.5 |
Aug. 1, 1866,[A] | 300.5 |
Sept. 1, 1866, | 311.9 | 11.4
Oct. 1, 1866, | 331.1 | 19.2
Nov. 1, 1866, | 354.0 | 22.9
Dec. 1, 1866, | 377.0 | 23.1
========================================

[A] Work suspended to put in new hoisting apparatus.

The present hoisting apparatus is expected to be sufficient to finish
the shaft. It has two wire ropes, each 1,260 feet long. The time for a
round trip is seven minutes. The engine here is of 100 horse-power. The
blacksmith shop contains two forges. At the small machine shop the
repairs required here are made, as also some repairs for the West Shaft.

The Central Shaft, though designed to aid in ventilating the tunnel, was
intended also to accelerate its construction by affording to the process
of excavation four faces instead of two during some portion of the work;
and the former chairman of the commissioners expected by the aid of
machine-drilling, the shaft might be completed in one year from the time
such drilling should commence within it. In this anticipation, ten
vertical drilling machines were constructed to work in the shaft area
and a compressor with two cylinders was provided to furnish the power
for operating them. The want of drilling machines at the East End became
so urgent, that these vertical ones were changed to horizontals, and
used at that point, and the sinking of the shaft by hand-drilling still
continues. But if the experiments now in progress at the East End with
the new drilling machine shall demonstrate its superiority over hand
labor, the machine will doubtless be introduced into the shaft.

WEST SHAFT.

This shaft has an area of about 8 by 13 feet, and was excavated by
Messrs. H. Haupt & Co. Its depth is 316 feet.

The buildings here used by the State are the West Shaft house, the New
Shaft building, a blacksmith shop containing two forges, a powder-house,
a horse-shed, ash-house and tank-house. The buildings owned by the State
and leased to operatives are a boarding-house and four old shanties
built by H. Haupt & Co., four first-class shanties, eight common
shanties, and a double cottage. The buildings at the West End, are
connected on the books with those at the West Shaft, and will be here
enumerated. They consist of a carpenter's shop, time-keeper's office, a
blacksmith shop containing one forge, tool-house, powder-house,
horse-shed, brickyard shed, brickyard, engine-house, artesian wells Nos.
3 and 4, buildings, and two-thirds of a barn, which are occupied by the
State. One boarding-house, store, one-third of a barn, the Harrington
farm-house, barn and out-buildings, twenty-seven common shanties and
brickyard boarding shanty. These buildings, with part of blacksmith
shop, part of carpenter's shop and time-keeper's office, are rented to
operatives and to Mr. Farren, the contractor for constructing the brick
arch.

The cost of the structures, as reported in July,
at both places, was $35,550 94
As reported in November, 40,010 13

This large increase was mainly occasioned by the construction of a
double cottage and necessary buildings at the brickyard and West End.

The amount of rents at these two points is $2,462.60 per annum. Fifteen
of the tenements at the West End are leased to Mr. Farren, in accordance
with his contract.

The working force at the West Shaft in July was,--

Engine-men and firemen, 4
Carpenters, 2
Blacksmith and helpers, 8
Masons, 2
Truckman, 1
Pump-man, 1
Manual laborers, 105
---
Total, 123

November 1st the working force at this point,
including one resident civil engineer, was 103

At this point there is one engine of 100-horse power and one of 40-horse
power, and one compressor having four cylinders of a diameter of 13
inches and 24 inches stroke. The West heading from this shaft was
advanced 293 feet, and the East heading 1,042, on the first day of
December, 1866. The progress for the year ending November 1, 1866, at
the heading at this point was 636.7, being a fraction over 53 feet per
month. For the last four months, ending December 1, 1866, the progress
was 322.1, being a fraction over 64 feet per month, which exceeds by
four feet per month the highest estimate for hand-drilling by the
engineers in 1862, and by thirty and one-third feet the estimate of Mr.
Latrobe. The progress of the work at this heading during the last six
months, making allowance for the influx of water in November, having
exceeded the highest estimate for hand-drilling, should be regarded as
evidence alike of the skill of the miners and the good management of the
engineer and his subordinates.

_Table showing the progress at West Shaft, East Heading, from November
1, 1865, to December 1, 1866._

=======================================
DATE. Distance from Progress,
shaft, feet. feet.
---------------------------------------
Nov. 1, 1865, 367.5
Dec. 1, 1865, 414.4 46.9
Jan. 1, 1866, 459.4 45.0
Feb. 1, 1866, 503.0 43.6
Mar. 1, 1866, 546.5 43.5
April 1, 1866, 584.8 38.3
May 1, 1866, 623.3 38.5
June 1, 1866, 682.1 58.8
July 1, 1866, 746.1 64.0
Aug. 1, 1866, 810.5 64.4
Sept. 1, 1866, 871.4 60.9
Oct. 1, 1866, 945.4 74.0
Nov. 1, 1866, 1,004.2 58.8
Dec. 1, 1866, 1,042.0 37.8
=======================================

The West heading at this shaft was at first driven 6 feet by 11. It has
been found advisable to enlarge it to the dimension of 10 feet 6 inches
by 15 feet. This work has been performed by contract. The first letting
was at the rate of four dollars per cubic yard, the State furnishing the
materials used and removing the stone. The contractors at this rate
could not pay their expenses. It was raised to six dollars per yard
which was found not to pay, and in July the price was advanced to seven
dollars and fifty cents. The State pay the men, charging the same to the
contractors, and keep their time. Good progress is made and the work is
done to the satisfaction of the engineer.

The East heading at this point was being enlarged also by contract, from
6 feet by 15, to 10-1/2 by 15. The work commenced on the 15th of July,
1866; the price paid is seven dollars per cubic yard; the contractors
load their own stone and also that coming from the heading. The State
provides the materials used, and hoist the stone to the surface. While
the work of the miners at the East heading and of the contractors upon
both enlargements was progressing in a very satisfactory mariner, the
whole was arrested by an unexpected and somewhat sudden influx of

WATER IN THE TUNNEL.

On the 27th of November the miners working east from the West Shaft
struck a seam running across the stratification of the mountain. Water
soon issued from the seam at the rate of twenty-three gallons per
minute. On the 29th, the water had risen at the foot of the shaft to two
and a half feet above grade, and the work was stopped. The usual speed
of the engine working the pump was forty-two revolutions per minute; it
was increased to fifty-six, and at that rate it succeeded in preventing
any further rise of the water. It became necessary to increase the power
of the pumps. The plunger was enlarged from eight to ten inches, and a
third lift pump was added. To affect this arrangement the pumps were
stopped from 9 o'clock, A. M., December 7th, to 3-1/2 P. M. on the 8th.
At this time the water was four feet and eight inches above grade. On
the 12th the water was so much reduced that the miners recommenced work.
The next day, at 2 P. M., the water was struck in large quantities, the
whole flow from the heading being 100 gallons per minute. On the 14th,
the work was again suspended, and unsuccessful attempts made to stop the
water by means of wooden plugs driven into the seam. The pumps working
with the longest stroke and at increased speed, were just able to keep
the water from rising.

On the 19th, at 10.30 A. M., one of the trunnions of the pump-bob broke,
and seriously injured the pump gearing and boxes. On the 21st a new
trunnion was put in, and the pump was attached to the small hoisting
engine, the water now being seven feet above grade. On the 28th, at
noon, the breakages being all repaired, the large engine was again
attached to the pumps, the water then being nine feet and eight inches
above grade. And, on the first day of January, at 4 P. M., the water
stood nine feet ten inches above grade at the foot of the shaft.[B]

[B] At the time of the presentation of this Report, the Committee
understood that the water was entirely removed from the shaft and
tunnel.

THE NEW SHAFT.

This shaft is located about 264 feet westerly of the West Shaft. Its
dimensions are six feet by thirteen in the clear. The rock to be removed
from an area of eight feet by fifteen. The labor is done by contract.
The first price was $40 per foot; increased July 1, 1866, to $50 per
foot. The State furnishes all the materials for construction, and the
power to raise the stone and water from the shaft. The depth of the
shaft will be 277 feet when open to grade. On the first day of December,
the miners working down had progressed 180 feet, and those working from
the tunnel up 45 feet. It was then calculated that the shaft would be
excavated in two months. Plans for permanent pumps had been prepared; to
furnish the pumps according to the plans, would take several mouths. In
the meantime, a temporary pump was to be made at North Adams, under the
direction of the engineer.

On the first day of January, about thirty-eight feet of stone remained
for excavation in this shaft. The water in the tunnel stopped the work
from below, and the work is driven upon one face only at the present
time.

There are two small engines at this point, one of fourteen and one of
ten horse power. The pumps at this shaft, if constructed agreeably to
the design of the engineer, will discharge sixty-five gallons to a
stroke and are to be worked by a bull engine. The lift of the water will
be eighty feet less than at West Shaft, being discharged about 40 feet
below the surface.

THE WEST END.

The work at the West End of the tunnel is under contract. Mr. B. N.
Farren of Doylestown, Bucks County, Pennsylvania, by an agreement dated
May 1, 1866, contracted to put in a stone and brick arch of the
dimensions before stated, 26 feet by 26, for the following prices,
viz.:--Earth excavation $3.50 per yard; brick masonry, $12 per perch;
stone masonry, $6 per perch. Contractor planks the bottom and sides when
necessary at $15 per lineal foot. The State furnishes the bricks at $9
per thousand and the timber at $16 per thousand for hemlock, and $18 for
spruce and hard-wood. The length of arch contracted for is 174 feet, the
whole of which is open. The State also furnishes the cement, which costs
in Troy, New York, from $1.65 to $1.70 per barrel, to which is to be
added the freight at 30 cents per barrel. A barrel of cement is used for
a perch of masonry.

The contractor agrees to construct two hundred feet of under ground
tunnel, and as much more as he can before August 1, 1867, at the
following prices, viz.:--Earth excavation at $6.50 per yard; brick
masonry at $13 per perch; stone masonry at $6.50 per perch. The
timbering, from $40 to $50 per foot, lineal, depending upon the
thickness of the wall. He may, under permission from the engineer, take
stone and sand from the State's premises, without making compensation.

Payments are to be made about the 12th of each month for the work done
the preceding month, at the rate of 80 per cent. of the finished work.

The decision of the engineer as to the method, quality, quantity and
classification of the work to be final and conclusive. In order to
facilitate the progress of the work and with a due regard to economy,
the State has purchased the following lots of land in the vicinity of
the West End, to wit:--A wood lot, containing sixty acres, at a cost of
$9,900; the Harrington Farm; 130 acres with the buildings, inclosing the
West End and West Shaft; and running half way up the mountain. This
purchase was made January 26, 1866, price $3,000. The Kingsley lot,
purchased March 16, 1866, at $2,793.87.

The timber used by Mr. Farren is obtained from these lots. The tops of
the trees are cut into wood and used at the brickyard. About five
hundred cords of wood has been cut on the Harrington, and one thousand
cords on the Kingsley lot, for the use of the brickyard, and is now on
hand.

The necessity of making the bricks required for the arch tunnel is
apparent. They could not be furnished by individuals at North Adams.
120,000, before the yard at the West End was fitted up, were purchased
at Springfield at $9 per thousand; the freight of which to North Adams
was $6, and the teaming to the West End $2 per thousand. If to these
prices be added the depreciation and waste from handling, the cost will
reach $18 for all that could be used in the work. It is the opinion of
the engineer and superintendent of labor, that the bricks made by the
State will cost less than $9 when delivered to the contractor.

Mr. Farren began work under his contract June 7, 1866, and early in
December the brick-work at the top of the arch had entered the mountain.
The masonry was commenced about, twenty-five feet west of the point
first selected, so that the open masonry will in fact be 200 feet long.
About thirty feet of invert is left uncovered the present season, under
an apprehension that the bricks on hand will only supply what will be
wanted in the drift, in order to prosecute the work with dispatch. The
invert has been properly protected, and its preservation may be
expected.

At the beginning, the invert and the sides to the spring of the arch was
laid with five courses of brick, and the arch with six. The masonry has
been strengthened to meet the effect of the soft ground and increased
pressure to eight bricks thick all round. Where rocks are found, it will
be reduced at the bottom, and perhaps at the top.

The excavation of the drift is in progress and is carried on with two
galleries. The lower one is of timber, and is at the bottom three feet
below the grade of the road. This gallery is ten feet wide and ten feet
high.

The upper gallery, also of timber, is ten feet wide and four feet high,
and the space between the galleries is about ten feet. As the arch is
driven in, the top of the invert is 4-1/2 feet below the grade of the
road, and 18 inches below the timber of the lower gallery. The top
timbers of the upper gallery constitute the top timbers of the tunnel
during the excavation. They are supported above the masonry and the arch
is turned under them.

Side drains, six feet high and four feet wide, are excavated ahead of
the galleries, to assist the drainage of the ground through which the
galleries and tunnel are driven. The water from these drains is let into
the tunnel through its sides, and runs out with the general drainage
upon the invert below the road-bed. Holes are left in the invert at
proper intervals to facilitate this drainage.

The side drains are hereafter to be filled with stone, which will
constitute a blind drain, and also afford a proper support to the
masonry.

The work at this point is of difficult prosecution, but the performance
of the contract may be confidently expected.

THE BRICKYARD.

The expenditures at the brickyard on the first day of July,
1866, had reached, $15,091 98

Of this amount the brick machines, shafting, gearing,
&c., cost $5,048 68

And the engine, 2,255 50
---------
$7,304 18

Twenty-four thousand bricks can be moulded daily. The drying yard is 300
feet long and 120 feet wide. The kiln shed is 300 feet long and 50 feet
wide, and of capacity to burn all the bricks that can be moulded. There
are six brick machines, four of which are in use. They are driven by an
engine, and used alternately, two each day. The making of bricks at the
yard commenced June 26 and closed October 24, 1860. About 1,700,000
bricks were made, of which 80 per cent. are sufficiently hard for use in
the tunnel, which is estimated to be sufficient to complete the 374 feet
of tunnel now under contract.

The clay for the bricks is found near the yard, and hitherto a
sufficiency of sand has been found in the vicinity; but it is less
abundant than the clay.

MISCELLANEOUS.

In addition to the property enumerated under the preceding
heads, the State has at North Adams, a freight house, cashier's
office, engineer's office, stable and two coal sheds, and opposite
the West End on the Pittsfield and North Adams Railroad, an
additional freight house. There are also two instrumental
station houses on the east and west summits respectively, all
of which are occupied by the State for the purposes of the
enterprise. There is also one seven-horse engine and three
small compressors. Tho State has also four mule teams, three
of four, and one of two animals, making fourteen in all. There
were also used on the work in the early part of the year, twelve
or fourteen horses, employed in hauling clay, sand, wood, &c.
Six of these have been sold to Mr. Farren, and the remainder
are to be disposed of. To this enumeration should be added
five horses and three or more carriages kept at the stable at
North Adams for the transportation of the engineers, superintendent,
master mechanic, &c., from point to point along the line of
operations wherever their presence and services might be needed.
The expense of the stable, including the pay of the keeper,
for the past year, was, $1,900 00

which covers the price of three carriages, $500 00
and one harness, 40 00
------- 540 00
---------
Leaving, $1,360 00

for the expense of keeping five horses, and the repairs; which is about
five dollars per week in all. The charge for keeping horses at the
stable in North Adams, is five dollars per week for feed; and the cost
for the use of one horse and wagon from North Adams to the East End, is
four dollars. These horses were also used to transport the commissioners
and the committee visiting the tunnel, when required for that purpose.

THE ROAD BETWEEN THE TUNNEL AND NORTH ADAMS.

It is proposed to change the course of, the road as it emerges from the
tunnel, and two lines have been surveyed, which, diverging near the
approach cut, unite again about midway from thence to the village. The
difference in length is about thirty feet. The northerly line is the
least expensive to construct, and best favors the landholders on the
route. It has the recommendation of the engineer, and the approval of
the consulting engineer, and will probably be selected. There are
reasons for an early location of this portion of the road which call for
a prompt action in this behalf on the part of the commissioners, which
will undoubtedly be taken.

The following table shows the expense of the tunnel and the land and
works connected therewith under the administration of the commissioners,
as found November 1, 1866:--

Deerfield Dam, $127,982 80
Race, 23,417 54
Excavation and Masonry at East
End of Dam, 12,802 46
Wheel pits, 70,723 23
Gates and Overflow, 9,986 26
---------- $244,912 29
East End Heading, 103,731 45
East End Enlargement, 80,317 10
East End Heading Enlargement, 17,559 46
Central Shaft, 144,423 75
West Shaft, 179,041 69
West Approach, 247,900 75
Building East End, 31,688 99
Building West End and Shaft, 40,010 13
Building Central Shaft, 12,026 83
Building General Account, 9,537 37
Engineering and Superintendent, 84,840 48
Machinery West Shaft, 57,111 73
Machinery East End, 87,032 38
Machinery Central Shaft, 51,364 01
Machinery Deerfield Dam, 10,820 93
Machinery General Account, 62,600 76
Machinery West End, 539 89
Land and Land Damages, 17,513 21
-------------
$1,482,973 20

The following table shows the cost of the works under the classification
of outside and inside expenditures, as given by the consulting
engineer.

_Outside Expenditures._

Deerfield Dam, $244,912 29
Buildings East End, $31,688 99
Buildings West End and West Shaft, 40,010 13
Buildings Central Shaft, 12,026 83
Buildings General Account, 9,637 37
---------- 93,263 32
Machinery East End, $87,032 38
Machinery West End, 539 89
Machinery West Shaft, 57,111 73
Machinery Central Shaft, 51,364 01
Machinery Deerfield Dam, 10,820 93
Machinery General Account, 62,600 76
---------- 269,469 70
Land Damages and Land, 17,513 21
Engineering and Superintendence, 84,840 48
-----------
Total outside expenditures, $709,999 00

_Inside Expenditures._

East End Heading, $103,731 45
East End Enlargement, 17,559 46
East End Bottom, 80,317 10
-----------
$201,608 01
Central Shaft, 144,423 75
West Shaft Headings, &c., 179,041 69
West End approach cut, drifting
and arching, 247,900 75
Total inside expenditures, ---------- 772,974 20
-------------
Total expenditures to November 1, 1866, $1,482,973 20

The exact correctness of any classification of the expenditures is not
very important, inasmuch as the sum total is chargeable to the
construction of the tunnel; but the Committee do not see the propriety
of charging the engineering and superintendence exclusively to the
outside expenditure. They have seen a classification which gave,--

Amount put into buildings machinery, &c., $673,531 24
Spent in the work, 809,441 96
-------------
Total, $1,482,973 20

GENERAL SUMMARY OF THE FORCE EMPLOYED ON THE TUNNEL,

November 1, 1866.

Thomas Doane, Chief Engineer, salary, $3,600 00
He providing his horses.

Paul Hill, Superintendent of Labor, 3,000 00
His horse furnished to him.

_In the Chief Engineer's Office._

H. G. Burgess, Master Mechanic, soon to leave, $1,800 00
John Christiansen, Mechanical Draftsman, 1,500 00
Austin Bond, Clerk, &c., 1,500 00
Edward Stowell, temporarily engaged in making fuse, 1,000 00
Roswell Houghton, hostler in village, $2.00 per day.
Charles P. Bradley, hostler at T. Doane's house, $18 per month.
Roger Tappan office boy and rod-man for Mr. Granger, $1.50
per day.
_West End._--Wages from $1.25 to $3 per day, 5
_Brick-Yard._--Wages from $2 to $5.89 per day, 13
_New Shaft._--Wages from $1.78 to $3 per day, 31
_West Shaft._--Wages from $1.50 to $3.50 per day, 102
W. P. Granger, civil engineer, is resident in charge of
West Shaft, New Shaft and West End. Salary $1,350, 1
_Central Shaft._--Wages from $1.50 to $5, 83
This number includes the time-keeper and H. G.
Coolidge, resident engineer.
_East End._--Wages from $1.50 to $:1.25, 115
F. W. D. Holbrook, resident engineer, in charge at a
Salary of $1,350, 1
Add force in general charge and not confined to any
particular point, 8
----
Total in the employ of the State, 359
Add at the West End in Mr. Farren's employ, about 100
----
Total employed upon the tunnel, 459

EXPERIMENTS.

The interest awakened by the magnitude of the undertaking to tunnel the
Hoosac Mountain, and the anxiety manifested for its early completion,
prompted the commissioners to the discovery of means to accelerate the
progress of the work. Their attention was naturally directed to the
operation of drilling, and with a view of improving upon the machine
drill used at Mont Cenis; scientific mechanics have been employed to
devise and construct a drill that should attain that end.

As a first step Gouch's patent of the hollow piston-rod, was purchased
for New England, for the sum of five hundred dollars. After which, a Mr.
Gardner was employed to construct a drill; but his efforts failed of
success after an expenditure of thirteen hundred dollars. A Mr. Butler
was engaged to devise a machine, but in the course of studying the
subject, his health failed and his services were lost.

A Mr. Hanson completed a machine which promised some success; but on
trial it proved a failure.

A second machine called the Brooks, Burleigh and Gates drill, was made
under the direction of the commissioners at Fitchburg. This machine was
put upon the works and used for several months.

A third machine, called the Burleigh drill, an improvement upon the
preceding one, was next produced, which is now at the works on the East
Heading.

About $13,000 was spent upon these experiments, resulting in the
construction of the Brooks, Burleigh and Gates drill, and the
manufacture of four of them. About one-half of this expenditure may be
charged to these last drills; the other was unproductive of anything of
value.

The Brooks, Burleigh and Gates drill was patented, but the Commonwealth
has the right to use them in the construction of the tunnel.

These machines will now be described.

THE HANSON MACHINE.

This machine has a cylinder and valve motion, similar to a steam-engine.
The piston is hollow, the drill-bar which may be of any required length,
passing through it, is moved with the piston, by means of four wedges or
cams on each end of the piston; these cams are pressed on the drill-bar
by means of sliding collars forced upon them by a complex arrangement
operating alternately. The drill-bar is rotated by means of a ratchet
operated by a spiral groove in the shield of the machine. The main
difficulty in this machine was in the complex arrangement for forcing
the collars upon the cams or wedges. It did not work well in a
horizontal position. The machine consisted of one hundred and twenty
pieces, and weighed five hundred and ninety-five pounds.

THE BROOKS, BURLEIGH AND GATES MACHINE.

This machine has a hollow piston, the drill-holder being a screw passing
through the piston, moving with it, and fed through it, by means of a
nut on the end of the piston-rod. This nut is held by means of a cap or
union nut, as it is called, the union nut being screwed on to the
coupling, and the coupling nut screwed to the piston-rod. The feed-nut
protrudes through the union nut, and is allowed to turn round in it. On
the end of this feed-nut is a ratchet gear covered by a ratchet-band
with an arm upon it, all moving with the piston. The ratchet arm moves
up and down in a spiral groove, the groove being in a shield attached by
screws to the cylinder; on the ratchet-band there is a pall and two
springs, one under the other. One of the springs holds the pall in gear,
the other holds it out of gear. As the piston moves down, the outer
spring comes in contact with a trip which is on the shield and is lifted
up, allowing the under spring to throw the pall into the ratchet, and as
the piston is moved back, turns the nut round, thereby feeding the screw
forward. At the extremity of its backward stroke, the pall comes in
contact with another trip on the shield which lifts it out of gear, the
outer spring having a catch upon it which holds the pall when thus
lifted out. The rotary motion is given by a ratchet on the coupling-nut,
covered by a ratchet-band the arm of which moves in a spiral groove in
the shield similar to the other, only having a spring to hold the pall
in the ratchet; this rotates all the parts on the piston except the
ratchet-bands and cross-head. The latter is held between two check-nuts
on the coupling-nut. To this cross-head is attached a bar which
communicates with a valve which opens the port when the piston moves
back, and shuts it when it moves forward; the air is always on during
its backward stroke. The piston having a greater area on the forward
than on the backward stroke, overcomes the backward pressure and moves
the piston ahead, and when cut off, the continued pressure forces the
piston back.

This machine is automatic; generally running until some portion of it is
destroyed. No part of the machine has been found strong enough to
withstand the friction upon it for any considerable portion of time. The
union nut has proved its weakest point, and the breaking of this
generally destroys that part of the piston to which it is attached.
Another point of weakness is the feed ratchet-band, the springs of which
are almost continually breaking.

The machine consists of eighty pieces; twenty-three of which are screws,
fifteen pins, and seven pieces of cast iron. It weighs 240 pounds, runs
about 200 strokes per minute, and costs about $400. Its longest run
without breaking has been five days. The run of one of them two days
without breaking during the time, is considered fortunate. The average
breaking is more than one a day. A table showing the list of breakages
will follow this description.

The piston-head of this machine has a diameter of 4-5/8 inches. The
diameter of the piston-rod is 4 inches at the large end and 2-1/4 at the
small end.

So there are 12-87/100 square inches of air area to drive the drill
ahead into the rock, and 4-23/100 to draw it out; but as the air is not
taken off from the front end, the actual pressure is upon an area of the
difference between the two, or 8-64/100 square inches.

Table showing Number of Drilling-Machines Broken, &c.

Column Headers
A. No. Machines Broken.
B. Cross Heads
C. Cylinder Flanges.
D. Coupling Nuts.
E. Feed Springs.
F. Feed Palls.
G. Ratchet Covers.
H. Valve Stems.
I. New Packing.
J. Tapper Bars.
K. Screw Spindles.
L. Union Coupling Nuts.
M. Feed Nuts.
N. Shields.
O. Piston Heads.

======================================================================
1866. [A] [B] [C] [D] [E] [F] [G] [H] [I] [J] [K] [L] [M] [N] [O]
----------------------------------------------------------------------
July 21, 32 5 2 4 3 2 2 1 10 7 - - - - -
31, 67 7 2 1 10 4 5 2 18 14 2 3 - - -
Aug. 7, 75 4 1 - 18 15 8 4 39 6 4 - - - -
14, 76 6 - 5 25 17 11 3 - 10 1 6 1 1 -
21, 65 7 1 3 28 15 13 7 - 12 - 1 2 - -
31, 102 1 1 9 64 7 18 2 - 10 2 4 5 1 -
Sept. 7, 65 1 1 - 27 4 24 - - 5 2 1 1 - -
14, 60 2 5 - 23 2 12 2 - 10 - 3 2 1 1
21, 56 1 1 1 28 6 13 - - 3 - 1 2 2 -
30, 56 3 2 1 31 3 16 2 - 4 - 1 9 1 -
Oct. 7, 54 7 - - 39 2 7 1 - 9 3 - 1 2 -
14, 53 5 1 2 28 5 10 1 - 9 1 4 6 2 -
21, 58 3 - - 28 4 13 - - 9 3 - 4 2 -
31, 77 7 1 2 63 4 11 2 - 12 1 2 6 2 -
Nov. 7, 38 2 - 2 19 3 13 - - 8 2 - 3 4 -
14, 40 1 1 - 17 2 9 - - 8 3 2 4 - -
21, 44 - 1 - 32 1 4 - - 7 - 1 1 1 -
31, 66 - - - 34 2 11 - 13 8 1 1 - 1 -
--------------------------------------------------------------
1,084 62 20 30 517 98 200 27 80 151 25 30 47 20 1
======================================================================

About forty of the Brooks, Burleigh and Gates machines have been used at
the tunnel; of these eight or ten were originally vertical, and intended
for use at the Central Shaft. At the commencement of their use, the
machines were new and had their best wear in them; there were from
twenty to twenty-four at the beginning. In a short time they began to
break down, but by putting on a large repair force and converting the
vertical machines into horizontal ones, a fair supply was kept up for
from two to three months, at the end of which time the greatest machine
progress was attained, viz., fifty-four feet and six inches, in
September. After that the progress diminished very much, and in
proportion to the giving out of the machines. It is the opinion of the
engineer that if a constant supply of machines could have been
furnished, that the progress would have reached a point much beyond that
obtained by hand labor; but with the stoppage of the supply, the number
of machines that could be kept in working order was daily reduced, and
at last it fell down to two or three, and finally, at times, none were
in condition to work. The frames were, however, kept in the tunnel to
await the completion of the Burleigh machine, the reception of which was
retarded till late in October; much beyond the time anticipated by the
commissioners, although the work of their construction was carried on
continuously night and day. They came at intervals of several weeks, two
at a time; the first of which were put into the tunnel on the
thirty-first day of October. Through the month of December, four of
these machines were at work.

THE BURLEIGH MACHINE.

Has a solid piston (so called,) which has a hole in its back end to
allow the feed-screw to pass in without touching; the drill is secured
to this piston. On the back end of the piston is a section of a ball
used as a cam, which works the valve and the feed-motion. The valve is
rotated by a rod lying on the band of the cylinder; upon this rod are
two cams which perforate the band of the cylinder. The action of the
piston brings the ball on its end in contact with these cams, rocking
them up and down; the rod to which they are secured being connected with
the valve, imparts to that its motion. This machine is fed altogether on
ways, or a bed-piece, upon which is the feed-screw; the feed-nut is upon
the end of the cylinder-band. To this feed-nut is attached a
feed-ratchet, which is held between two collars, allowing it to turn
round. Upon the cylinder-band is a lever, one end of which passes
through the band; upon the other end is a pall. The motion of the piston
raises the lever up, pressing the end containing the pall against the
ratchet which turns the nut on the feed-screw, thus moving the machine
forward. The rotating ratchet is in the band of the cylinder and has a
spline in it, and a pall on its outside. The piston having a spiral
groove is turned by this ratchet as it moves down. On the return of the
piston, the pall drops into the ratchet and then the piston is turned.
The piston is not encumbered with any machinery, and moves alone; its
area of air is greater on the forward than on the backward stroke; the
alternation of the valve admits the air. The machine, like the one last
described, contains eighty pieces; it has the same number of screws and
pins, and weighs 372 pounds including the ways or bed-piece; without the
ways its weight is 212 pounds. Its number of strokes is about 300 per
minute, and its blow somewhat lighter than that of the other. This
machine is not entirely automatic; the feed-motion not working regular;
when it does not, it is fed by hand, which is a simple process.

These machines stand the work much better than those first made at
Fitchburg. Their average time in the tunnel without repairs in the
interval, is about five days; they have needed repairs in two days; one
remained at work fourteen days. They accomplish double the work without
repairs that those do which were made after the previous pattern. There
is a further advantage in using the Burleigh machines; their breaking,
when it occurs, is not very serious, the injured parts consisting mainly
of cams, can generally be replaced at the tunnel; whereas for the
repairs on the Brooks, Burleigh and Gates machine, the dependence to a
very great extent has been upon the machine shop at Fitchburg.

The piston-head of this machine has a diameter of 4-25/100 inches. The
diameter of the piston-rod is at the large end, 3 inches, at the small
end, 2-75/100 inches.

So the number of inches of air area, is 8-20/800 when the drill is
propelled upon the rock, and 7-7/100 when returning from it.

A full complement of men to work the machines first used, would be,
perhaps, thirteen. Mr. Gates, who superintended their operation in the
first instance, began with fourteen, but they were reduced to thirteen.
The Burleigh machine practically requires feeding, and a full set at
work would probably demand fifteen men for their successful operation.

The value of these machines has not yet been ascertained. The Committee
are of opinion that when a full complement shall have been obtained, so
that the workmen can have at all times a full supply upon the frames,
that greater progress can be obtained by them than by hand drilling; and
after a few months operation, the cost of using them, in comparison with
hand labor, can be fairly tested. But as the Brooks, Burleigh and Gates
machine has been abandoned, no useful results would be obtained by
comparing the expenses within the tunnel during the months of July,
August and September, with three corresponding months when hand
drilling was carried on, and no satisfactory comparison can be made
between the working of the Burleigh machine and hand drilling, until a
sufficient number of machines has been introduced into the tunnel to
keep the men fully employed. It is to be hoped that machines sufficient
to make the test may be soon obtained, and that this desirable
information may be made known.

The introduction of the first machine into the tunnel, before its
capacity, strength, and expense of working had been fully tested, was
unfortunate, inasmuch as its use there delayed the progress of the work.
The second machine gives such promise of success, that it will be
continued in use in the tunnel until a fair test has been made. But
should the Burleigh machine prove unsuccessful, and further attempts
with machines be attempted, the Committee recommend that their
usefulness be tested outside of the tunnel, and meanwhile the excavation
with hand drills be resumed.

EXPERIMENTS WITH DR. EHRHARDT'S POWDER.

The first blast was fired in the tunnel at the East End on the 20th of
November, but owing to the presence of charcoal or some other substance
in the article, a poisonous gas was evolved which effected the miners
disagreeably, and drove them from the work. The subsequent experiments
at this point were not satisfactory, and were discontinued, and
subsequently resumed at the Central Shaft, where it was used most of the
time for a week, varying its composition from time to time. At the close
of the week, while preparing for the last blast, a premature explosion
took place, resulting in the death of one of the miners, and the injury
of three or four others.

The material result of this experiment was as follows:--With 261 days'
work and 139-1/2 lbs. of powder, 202 buckets of stone were removed;
while in the preceding week, using common powder (schaghticoke) with
251-3/4 days' labor and 236 lbs. of powder, 168 buckets of stone were
taken out. The cost of the experimental powder is about twice as
expensive as the common powder, and its superior strength is apparent
from the above result.

EXPERIMENTS WITH NITRO-GLYCERINE.

During the summer, some experiments have been made with this explosive
agent. A quantity, costing $934.29, was brought to the works by Colonel
Schaffner, who exhibited the action of the material in various ways,
with a view of testing its power, and the comparative safety of
introducing it instead of powder. After repeated trials outside of the
works, during which about three-fifths of the material was consumed, it
was introduced into the tunnel at the West Shaft with the following
result: It was used for three days at the East heading of the West
Shaft; the advance made in the heading was for the time, 14-1/2
feet;--being an advance of 4.82 feet per day, and at the rate of 125.33
feet per month.

In these three days there were taken out of the enlargement
151.76 yards of stone. To remove this quantity
with powder would cost, on an average, per yard, $9 84
Actual cost with glycerine, 6 20
-----
Difference, $3 64

Multiplied by 151.76, gives. $552 40
In the same time there was removed of heading
60.15 yards.
To remove an equal amount by powder
costs, per yard, $16 25
Actual cost with glycerine, per yard, 6 05
------
Difference, $10 20
$10.20 multiplied by 60.15, gives 613 53
--------
$1,165 93
Cost of the glycerine used during the three days,
being 2/5 of $934.29, 350 36
--------
Saved, by using glycerine, in three days, $815 57

Which is a saving by the use of glycerine, per day,
of $276 85.4
and allowing three hundred successful working
days in the year, an annual saving of $81,557 40

The progress made at the West Shaft on the East heading the present
year, ending December 31, 1866, is 626 feet and 8 inches. This progress
was somewhat lessened by the influx of water in December. The monthly
advance has been 52 feet and 2 inches. The average of the eleven months
ending with November is 53 feet and 6 inches. Assuming the progress made
with glycerine during the three days of its use to be obtainable
throughout the year, the monthly progress, using that material, would be
120 feet and 10 inches, on a calculation of twenty-five days to a month,
which would give an annual advance of 1,450 feet.

Without vouching for results so favorable to the progress of the work,
it is impossible to overlook the importance of the experiment; and the
Committee are of opinion that this material, if it can be procured,
should be introduced into the tunnel and shafts, and a thorough
experiment made, in order to determine whether it can be used with an
advantage even approximating to that shown by the first trial.

Experience has proved that the rock at the Hoosac Mountain is of a
peculiar character: comparatively easy to drill, but extremely hard to
displace, and that its advantageous excavation requires a strong
explosive agent. The difference in the use of weak and strong powder is
at once observed, and the effect of simultaneous blasting, by the aid of
electricity, is proved by the increased progress of the work since it
has been used. It would seem evident, then, without the aid of
experiment, that an explosive agent, possessing eight times the power of
common powder, would be a valuable auxiliary to this undertaking; and
that if such an one could be obtained, and safely used, no time should
be lost in procuring a supply.

The use of nitro-glycerine in England is not uncommon; its components
are well known; and the Committee are informed that it might be
advantageously manufactured at any point where it is used.

ELECTRICAL FIRING.

The experiment of simultaneous blasting by electricity has been made
with admitted success. The increased progress in the Central Shaft from
an average of about 18-1/2 to 23 feet per month, demonstrates its
utility, and will undoubtedly insure the continuance of that mode of
firing in preference to the method formerly practised.

THE TROY AND GREENFIELD RAILROAD.

The completion of the railroad from Greenfield to the tunnel has been
contracted for with B. N. Farren, for the sum of $545,000, exclusive of
the cost of depot buildings, turn-tables, and engineering expenses. The
road to be opened for travel to Shelburne Falls by the 15th of November,
1867, and to the tunnel by the 15th of July, 1868. A lease of the same
has been executed to the Fitchburg and the Vermont and Massachusetts
Railroad Companies, at a rent of $30,000 per year, to expire on the
completion of the tunnel, or whenever the work on the same shall be
stopped, by competent authority.

Mr. Farren commenced work under his contract about the 20th of October.
At this time there were about four miles of track,--exclusive of that
which had to be removed with the trestle-bridges,--built by Mr. Haupt.
Some portions of the track were in fair condition; but the larger part
of it must be relaid. Many of the ties are of hemlock; they are all
decayed and must be removed, and new ones substituted. None of the
bridges were strong enough to be used, and the timber of which they were
constructed is too much decayed to be used for building purposes: There
is on hand in addition to the track laid, chairs, or connecting joints,
sufficient to lay five miles of rails; also about ten thousand chestnut
ties. Such of these as had been properly piled are sound. Many of them,
however, are so much decayed, as to be unfit for use.

The road-bed has in many places been injured by rain and frost. At
exposed points near the river, it is entirely destroyed. Comparatively
speaking, there was little masonry on the line. With the exception of
one pier, the bridge masonry at Green River will be taken down. All the
deep ravines were crossed by trestle work, and consequently there were
but few culverts. Of these some small ones are still standing in good
condition. Of the bank wall built, about one-half remains,--the
remainder has either fallen down, or will be taken down and rebuilt.

Very little alteration will be made in the general location of the line
or its gradients. The curvature will be very much modified and improved.
Some sharp and reversed curves will be entirely saved by the
substitution of straight lines. Others, where the expense of reduction
is not very heavy, will be materially changed. The alterations below
Shelburne Falls are substantially as follows:--

A straight line substituted for one 2°, one 4° and one 6° curve.
One 2° curve substituted for one 4° curve.
Four 4° " " " four 6° "
One 3° " " " one 6° "
Three 3° " " " three 6° "
Five 5° 30' " " " five 6° "
One 3° 30' " " " two 6° "
One 4° and two 2° curve substituted for three 6° curve,
saving 45° and 60 feet.
One 5° 40' curve substituted for one 7° curve.
One 6° " " " one 7° "
Three 7° " " " three 8° "
One 5° " " " two 5° and one 6° curve.
Two 3° " " " two 6° curve,
saving 30° and 40 feet.

The same plan for improving the line above the falls will be pursued, so
that when completed, the road combining the alignment with the gradients
will, in the judgment of the engineer, be "superior for doing
economically a heavy traffic, to any railroad in New England which runs
east and west."

At Green River there will be substituted for Mr. Haupt's bridge of 700
feet built on a curved line one of 470 feet, to be constructed on a
straight line. The remainder of the ravine to be made a solid
embankment. All the bridges on the line are to be "Howe's Truss," and
equal in strength and durability to any in New England.

The trestle-work has been removed, and the ravines where it was placed
are being filled with substantial masonry and solid embankments.

On the first day of November Mr. Farren had about fifty men employed; on
the first day of December, two hundred and seventy-five, and on the
14th of December, when one of the Committee visited the line, he had
over three hundred.

About one-third of the masonry for Green River bridge has been built,
and the stone is quarried for the other bridges. Nearly one thousand
yards of culvert masonry and three hundred yards of bank wall have been
constructed, and from forty to fifty thousand yards of earth removed.

The timber for Green River bridge is sawed and will be framed in
January. The material for all the bridges below Shelburne Falls has been
contracted for, to be delivered early in the spring. Twenty thousand
ties have been purchased, together with posts and boards for fences. The
work at the rock-cut near Shelburne Falls will be commenced in the month
of January.

On the line below Shelburne Falls, there will remain in the road, the
following sharp curves, to wit: In the track as laid and not disturbed,
four of six degrees, and in the remainder of the line, six of six
degrees, three of seven, and two of eight. One of the eight degree
curves, is through a long heavy cut, and cannot be reduced without great
expense. The other is near the Deerfield River crossing, where all
trains will be required to run slow. It cannot be avoided without a
tunnel or a curve over the entire bridge. The three seven degree curves
occur in heavy rock-cuttings, and these are all the sharp curves that
are contained in a space of thirteen miles.

Above Shelburne Falls the alignment and grades are more favorable. From
the tunnel to the Deerfield River crossing, below Shelburne Falls, a
distance of twenty-two miles, there is but one ascending grade going
east; its location is about two miles west of the falls; it is one-half
mile in length, and is thirty-five feet to the mile. Within the same
space going east, there are the following descending grades, to wit: One
of forty-five feet per mile for 2,000 feet, one of forty feet for 6,000
feet, one of twenty-eight feet for 2,500 feet, and one, near the village
of Shelburne Falls, of fifty feet per mile for 5,300 feet. The remaining
grades are from five to twenty feet per mile.

The sharp curves remaining after the proposed improvements will be as
follows, to wit: Near the depot grounds at Shelburne, and running
through the village, there is necessarily one eight degree curve, and
on the seventeen miles between the falls and the tunnel, there occur
thirteen six degree curves. A slight change in laying the track will
increase the radius of these curves to 1,000 feet. This in some cases
can be done.

The county commissioners have been called out and have made an
adjudication in regard to the public crossings and alterations of
highways between Greenfield and Shelburne Falls.

The whole work below the falls is under good progress, and is being
prosecuted with great vigor. The laying of the track can be commenced as
early in the spring as the season will admit, and its extension to
Shelburne Falls, may, in the opinion of the engineer, be expected early
in October.

It appears from the foregoing, that of the work now in progress on the
road and tunnel, their is performed by contract,--the construction of
the railroad from Greenfield to the East End of the tunnel; the
enlargements east and west in the tunnel at the West Shaft; the
excavation of the New Shaft; and the arch masonry and excavation at the
West End; while the work at the East End, at the Central Shaft, the
heading and lifting at the West Shaft, the lifting at the New Shaft, and
the work at the brickyard has been performed by the State. No criterion
has been afforded enabling the Committee to determine upon the
comparative economy of the different modes of operation.

The commissioners in their able report in 1863, speaking of the manner
of constructing the tunnel, say: "It would not be wise nor according to
any precedent for the State to expect to get the work done at the
contract price if it should turn out to cost more. It would certainly
get no abatement if the price was found to be exorbitant. We are clearly
of the opinion that it should not be constructed by contract, excepting
in so far as parts of the work may be in detail to the men actually at
work upon it, and even such contracts should' not be permanent in their
character." That the commissioners in April last entertained the idea of
inaugurating and continuing the contract system so far as the same
should prove economical for the State, satisfactorily appears in the
following letter:

BOSTON April 25, 1866.

Hon. TAPPAN WENTWORTH, _Chairman of Hoosac Tunnel and Troy
and Greenfield Railroad Committee._

DEAR SIR:--Hearing that questions have arisen in regard to the propriety
of contracting the work upon the Hoosac Tunnel, it may not be improper
for me to say that that subject (contemplated in the Act of 1863,) has
for a long time engaged the serious attention of the commissioners, who
have already a contract for constructing a portion of the West End,
before the governor and council, awaiting their approval under section 3
of chapter 214 of the Acts of 1863.

When the economic value of their new facilities shall be demonstrated,
they expect further to avail of this system 80 far as the interest of
the State (as represented by the rapid, economical and certain progress
of the work,) shall warrant.

While the high prices now prevailing will probably render the letting of
large jobs at this time injudicious, they are not of short contracts, or
of letting portions of the work to the miners by the piece.

Very truly yours, J. W. BROOKS, _Chairman_.

The Committee coincide with the views of the commissioners. And the
justness of their remarks, that the State must not expect to have the
work done at less than its cost, is borne out by the operations under
the contract for the West End enlargement, where the State has increased
the contract from four to seven dollars and fifty cents a perch, in
order to insure the miners a compensation for their labor.

It may be proper to state in this connection, that the labor done upon
the road and tunnel by early contractors, has not tended to a "rapid,
economical and certain progress of the work," and that if even the whole
work should be put under contract, the interest of the Commonwealth
would require the continuance of a commission, and the services of an
engineer of the highest skill and integrity to superintend its
performance in order to avoid a loss and damage similar to that which
occurred to the State while the work was under the nominal control of
the Troy and Greenfield Railroad corporation.

The retirement of all the gentlemen who comprised the board of
commissioners, first appointed under the legislation of 1862, affords
the Committee an opportunity to acknowledge the eminent talent and
ability which they respectively possessed for the discharge of the
important duties assigned to them, and to bear testimony to the industry
and intelligence displayed in their elaborate and comprehensive report
upon the subject of the railroad and tunnel in 1863. It was fortunate
for the State in that crisis in the affairs of this enterprise to be
able to command so much practical information upon a question so
interesting and important, and at the same time so difficult of
solution.

But in addition to the duty of furnishing an opinion of the feasibility
and mode of constructing the tunnel, and of the propriety of opening
this line of railway communication with the West, the commission was
instituted to carry on and superintend a most important and difficult
public work, involving the expenditure of several million dollars. Yet
each of the gentlemen composing the board was engaged in other duties
requiring substantially their whole time and attention. Under these
circumstances their personal observance of the progress of the work
could not be given to a degree satisfactory to the public, or essential
to the interests of the State, and the responsibility of the operations
came to devolve upon the engineer at the works, and the chairman of the
commissioners in Boston. These irksome labors were discharged with
diligent faithfulness, and as the event has proved with a physical
suffering to one of them that has called forth a general expression of
regret and sorrow.

By chapter 214 of the Acts of 1863, the governor is authorized to draw
his warrant on the treasurer for such sums as may be required, from time
to time, by the commissioners, for the purpose of carrying out the
provisions of law for the completion of the tunnel and railroad. The
commissioners under this enactment have made monthly requisitions upon
the governor, transmitting at the same time vouchers for the expenses of
the preceding month; and upon this information and requisition the
warrants have been drawn. By the 293 chapter of the Acts of 1866, a
general supervision of the work is vested in the governor and council,
with power to "correct abuses, remedy defects, and impose and enforce
requirements in such manner as the interests of the Commonwealth shall,
in their judgment, require." As the commissioners exercise a delegated
power, there would have been a manifest propriety in requiring of them,
from time to time, a report upon the progress of the work, and of their
own doings even under the Act 1863, so that the governor might have been
more fully provided with information touching the necessity of the
requisitions. But under the Act of 1866, it appears essential that the
commissioners should report monthly to the governor and council the
general plan of operations pursued, the progress of the work, and the
manner and extent of their own superintendence of the same.

The Committee are therefore of opinion that the commission should be
reorganized in such manner that the State could command the whole time
of its members: that a greater degree of personal attention should be
given by them to the work than it has heretofore received: that the
commissioners should keep minutes of their doings which shall be open to
the inspection of the governor and council, and the appropriate
legislative committee: that their monthly communications to the governor
and council should embrace, in addition to the past, and the requisition
for the current month, a report of the operations, the progress of the
work during the previous, month, and the manner and extent of their own
superintendence of the same.

The Committee are also of opinion that a due regard to economy in
conducting the enterprise requires that the commissioners should at
once, by experiment, ascertain the probable time required to excavate
the enlargement of the tunnel, and that the work upon the enlargement be
regulated and pursued with a view of avoiding any unnecessary delay in
operating the road after the heading is removed.

* * * * *

In concluding this Report, the Committee cannot forbear to express their
obligations to Mr. Doane, the engineer in charge of the work, for the
assistance rendered by him in aid of their labors, nor withhold their
approbation of the faithful and able manner in which he has discharged
the duties of his office, so far as they have come under their
observation. The Committee are indebted to Mr. Hill, the superintendent
of labor, for his uniform attention during their examinations, and they
fully recognize his capacity for his position, and his interest in the
operations. They are likewise indebted to Mr. Hall, the intelligent
master of the machine shop, for very valuable information concerning his
particular department. And also to Mr. Field, the able and efficient
engineer of the railroad, for a very satisfactory report upon that
portion of the work under his direction.

TAPPAN WENTWORTH,

----- -------,[C]
WILLIAM L. REED,
_Of the Senate._

MOSES KIMBALL,
GEORGE B. LORING,
SYLVANDER JOHNSON,
B. F. TAFT,
E. H. CHISHOLM,
SILAS JONES,
JAMES R. GLADWIN,
_Of the House._

[C] Hon. ALVAH CROCKER has not acted on the Committee since his
appointment upon the commission.

APPENDIX.

[A.]

_Sketch of the Proceedings of the Troy and Greenfield Railroad
Corporation, from its organization to the surrender of the Road
under the mortgage, and the adoption of the work by the
Commonwealth._

The charter of the Troy and Greenfield Railroad, was granted in 1848,
and authorized the construction of a railroad with one or more tracks,
from a point on the Vermont and Massachusetts Railroad, at or near
Greenfield, to some point on the line of New York or Vermont, convenient
to meet or connect with any railroad that may be constructed from any
point at or near the city of Troy, on the Hudson River in the State of
New York. Its capital stock was limited at $3,500,000.

The corporation was authorized to contract with the owners of any
contiguous railroad leading into or from either of the States of Vermont
or New York, for the use of the whole or any part thereof, or for the
running and operating the two railroads conjointly, or for the leasing
of such contiguous road, or for any other road, or for the letting or
hiring of their own road to the owners of such contiguous road, or of
any other road which composes a part of the railroad line between the
cities of Boston and Troy, of which the Troy and Greenfield Railroad
shall be a part.

The first meeting under the charter was held June I, 1848, at which
subscription papers were voted to be issued and circulated, in order to
organize the corporation. In 1849, March 16, the subscribers to the
stock held their first meeting, and organized under the charter.

At the annual meeting, February 6, 1850, the stock was apportioned among
the neighboring towns as follows:-

Ashfield, 60 shares.
Charlemont, 400 "
Colrain, 150 "
Conway, 50 "
Greenfield, 700 "
Hawley, 120 "
Heath, 120 "
Leyden, 30 "
Monroe, 50 "
Rowe, 100 "
Shelburne, 400 "
Buckland, 150 "
Florida, 120 "
Adams, 1,000 "
Williamstown, 800 "
Clarksburg, 40 "
Hancock, 50 "
Deerfield, 150 "
Bernardston, 40 "
Gill, 80 "
Whitingham, 00 "
Reedsborough, 00 "
Stansford, 00 "
0,000 shares.

It was also voted to apportion the directors among the towns in the
following manner, to wit:--

North Adams, 3; Florida, Rowe, Heath and Monroe, 1; Colrain, Buckland
and Hawley, 1; Shelburne, 1; Greenfield, Deerfield and Conway, 3;
Williamstown and Whitingham, 2; Charlemont, 1; and one director at
large.

Before the annual meeting in 1850, the directors had voted to assess
three per cent. upon each share of the capital stock. This vote was
passed April 11, 1849, and on the first day of October in the same year,
they voted that the construction of the road from the State line at
Pownal, Vermont, to Adams, and from Greenfield to Shelburne Falls, be
put under contract as soon as sufficient subscription shall have been
obtained therefore, and that the two ends aforesaid shall be constructed
simultaneously.

1850, January 28, the treasurer had received the sum of $2,203.94, and
had paid out on bills approved by the president, $2,203.57, leaving a
balance in the treasury of $0.37.

Sundry assessments amounting in all to 75 per cent. upon the
subscriptions, were afterwards voted, the last on the 6th of May, 1852.
These assessments were rescinded by a vote passed July 23, 1858, and it
also voted that the several amounts heretofore paid by individual
stockholders, except on assessment laid April 11, 1849, be credited to
their several accounts on assessments now or hereafter to be made.

1850, October 28, the contract with Messrs. Gilman and Carpenter, was
ratified, and on the 29th, the president was authorized to execute it.

The Committee have not found this contract nor any record stating its
provisions.

December 27, 1850, a committee reported that the whole amount of stock
subscribed, was $250,800, of which $7,200 was payable in land damages
and materials for the road; and that Messrs. Gilmore and Carpenter had
subscribed for 500 shares of stock, to wit, $50,000.

On the 7th day of January, 1851, the directors voted to break ground the
next day, and on the 27th of May in the same year, they voted to expend
a sum not exceeding $25,000, in experiments upon the east side of the
mountain, at or near the mouth of the proposed tunnel.

In 1851, the corporation petitioned the legislature for a loan of the
State credit for two million dollars; but the application was
unsuccessful.

The failure to secure the aid of the Commonwealth, appears not to have
discouraged the corporation, for on the 7th of August, 1851, the
directors voted that they would proceed forthwith from Adams to the New
York line, and simultaneously incur all the necessary expenses to make
thorough experiments with such machines as promise to facilitate the
construction of the tunnel, and when the road is begun from Greenfield,
it shall be after an arrangement is made to construct it to the foot of
the mountain in Florida and connect in some way with the road at North
Adams.

The Troy and Greenfield Railroad Corporation having directed its
attention to a connection with the Troy and Boston Railroad Company
through a portion of the State of Vermont, and a charter having been
obtained from the legislature of Vermont, incorporating the Southern
Vermont Railroad Company, whereby such connection could be made, a
committee of the directors of the Troy and Greenfield Railroad Company
and of the Southern Vermont Railroad Company made an agreement, subject
to the modification or ratification of the stockholders of each company,
"that the stock of both of said companies and their franchises from said
Greenfield to the west line of Pownal, in the State of Vermont, shall
become and be one joint, consolidated stock and interest, with equal and
common rights and privileges to the stockholders of both companies;" it
being understood that an application shall be made to the legislature of
Vermont for a change of the name and style of the joint corporation
mentioned in the said Act of the Vermont legislature. This report was
made to the board of directors, and it was voted that the same "be
accepted and adopted, recorded and placed on file." Subsequently the
Southern Vermont Railroad was leased to the Troy and Greenfield
Corporation on a perpetual lease for $12,000 per year; and the 21st of
April, 1860, it was purchased by the Troy and Greenfield Corporation for
the sum of two hundred thousand dollars, with money advanced to the last
named corporation by the Commonwealth. In the report of the
commissioners on the Troy and Greenfield Railroad and Hoosac Tunnel, the
Southern Vermont Railroad is estimated to have cost from $110,000 to to
$125,000 only.

In 1858, another application was made to the legislature for a loan, but
with the same result as in 1851. In both instances, committees reported
in favor of the application.

In 1854, the application was renewed, and was successful. The Act was
passed on the fifth day of April, 1854. By the first section, the
treasurer was authorized to issue scrip, as certificates of debt, for
the sum of two million dollars, to be expressed in the currency of Great
Britain or in federal currency, as the directors of the Troy and
Greenfield Railroad should elect, to bear an interest of five per cent.,
payable semi-annually, and redeemable in thirty years, for the purpose
of enabling the Troy and Greenfield Company to construct a tunnel and
railroad under and through the Hoosac Mountain, in some place between
the "Great Bend" in Deerfield River, in the town of Florida, at the base
of Hoosac Mountain, on the east, and the base of the western side of the
mountain, near the east end of the village of North Adams, on the west.
The scrip was to be delivered to the treasurer of said Troy and
Greenfield Railroad Company in the manner and upon the conditions
following:--$100,000, when it should appear to the satisfaction of the
governor and council that said company had obtained subscriptions to
their capital stock in the sum of $600,000, and twenty per cent. upon
each and every share of said six: hundred thousand dollars should have
actually been paid in, and seven miles of their railroad and one
thousand lineal feet of their said tunnel under the Hoosac, in one or
more sections, of size sufficient for one or more railroad tracks,
should have been completed.

$100,000, when ten miles of their said railroad, in one or two sections,
and ten thousand lineal feet of their said tunnel, in one or more
sections, should be completed.

$100,000, when fifteen miles of their said railroad, in one or two
sections, and three thousand lineal feet of their said tunnel, in one or
more sections, should be completed.

$100,000, when twenty miles of their said railroad, in one or two
sections, and four thousand lineal feet of their said tunnel, in one or
more sections should be completed.

$100,000, when twenty-five miles of their said railroad, in one or two
sections, and five thousand lineal feet of their said tunnel, in one or
more sections, should be completed.

$100,000, when thirty miles of their railroad, in one or two sections,
and six thousand lineal feet of their tunnel, should be completed.

$100,000, when thirty-two miles of their railroad, in one or two
sections, including all the line east of Florida, and seven thousand
lineal feet of their tunnel, in one or more sections, should be
completed; and for each additional portion or portions of said tunnel of
fifteen hundred feet, in one or more sections, completed by said
company, $100,000, subject to the condition that the last $200,000
should be reserved until said company, or their successors, should open
their railroad for use from Greenfield to the line of the State in
Williamstown; and subject also to the condition, that, prior to the
second delivery of scrip, thirty per cent. of the same shall have been
paid in cash to the treasurer of the company by the stockholders
thereof, in addition to the $120,000 to be paid prior to the delivery of
any scrip; and that upon each application for scrip, in pursuance of the
law, and prior to the delivery thereof, thirty per cent. of the scrip
then applied for shall have been paid by the stockholders to the
treasurer of the company until the $600,000 subscribed for has been paid
by the stockholders.

The Act further provided, that the treasurer of the company, within
three months from the receipt of any scrip, should pay to the
commissioners of the sinking fund created by the Act, ten per cent. on
the amount of scrip so taken as a sinking fund; and after the road
should be opened for use, twenty-five thousand dollars should be
annually paid to said commissioners for the same purpose.

The Act further provided, that the said company should execute an
assignment, as a pledge or mortgage on the railroad, with its franchise
property and income, conditioned to pay the principal sum of said scrip,
or so much thereof as the sinking fund should be insufficient to pay,
and the interest, as the same became due; and that said company should
assign all the interest it then had, or might afterwards obtain, in the
Southern Vermont Railroad Company.

In 1855, the legislature authorized certain towns on the line,--to wit:
Ashfield, Buckland, Conway, Colrain, Charlemont, Deerfield, Greenfield,
Hawley, Heath, Rowe, Shelburne, Adams, Florida, and Williamstown,--to
subscribe three per cent. on their valuation, respectively, to the
capital stock. This Act was not fully complied with on the part of the
towns, and $125,000 only is reported to have been realized from that
source.

In 1855 a contract with E. W. Serrell to construct the work was reported
to and accepted by the directors. This contract does not appear among
the papers of the corporation, and its terms cannot be stated.

At the same time the capital stock of the corporation was by a vote
increased to $1,500,000, and a location designated as the east line on
the railroad near Cheapside was adopted. This singular resolution was
also passed:--

_Resolved_, That the direction of the engineering operations within the
Hoosac Tunnel after the location of the line is adopted, and plans
perfected for the same, be left with the contractor, excepting the
measurements for monthly and final estimates and the final acceptance of
the work.

1855, July 18. Mr. Serrell having proposed to subscribe the sum of
$600,000 (less the amount of the new subscription made by others,)
provided the company would make such allowances as would enable him to
dispose of the proposed issue of $900,000 of bonds advantageously, the
directors voted to add $300,000 to the contract prices of the work, and
that said $900,000 bonds as provided by the contract should be issued as
soon as authorized by the stockholders, and placed in bank by the
trustees to the credit of such persons as shall deposit against the same
cash or railroad iron equal in value to sixty-five cents on the dollar.
The said bonds to be taken by said Serrell at par and so estimated in
his contract.

At this time sixteen hundred and thirty-five shares of new stock had
been subscribed, amounting to $163,500.

The trustees alluded to in the foregoing vote were selected by a
committee appointed for the purpose, and with power to execute to them a
mortgage. They were J. V. C. Smith, Paul Adams and John G. Davis, all of
Boston. The mortgage was executed, and is known in the history of the
road as the "Smith mortgage." A resolution explanatory of this
transaction was passed August 16, 1855, in the following words:--

"_Resolved_, That, whereas by the terms of the provisions of the
resolution of July 18, 1855, by which it is provided that the bonds of
the company to be issued, are to be placed in bank, &c.; therefore, as
explanatory thereto, be it

_Resolved_, That it is not intended thereby to prevent the operation of
the contract, but that the said bonds are to be delivered to Serrell &
Co., on the warrant of the engineer, countersigned by the president and
treasurer, whenever the engineer shall draw therefore on monthly or
final estimates."

1856, February 7. The president reported to the directors that a
contract had been redrafted and concluded with Messrs. Serrell, Haupt &
Co., which was read, accepted and ratified, and the committee
discharged. This contract was probably dated January 31, 1856, but the
Committee have not been able to find it among the papers of the
corporation.

1856, May 22. The directors voted, that in case Messrs. Serrell, Haupt &
Co., would enter into an agreement to carry on the work of the Troy and
Greenfield Railroad Company, in compliance with the terms and conditions
of the loan Act, until 2,000 feet of the tunnel should be completed, the
corporation would substitute bonds instead of stock in all payments to
be made on account of work to be done to that time.

The treasurer was authorized to give the acceptance or notes of the
company, to an extent equal to the whole indebtedness of the company to
said contractors, upon which to raise money to carry on the work.

That the company would pay or allow to said contractors all discounts or
losses to which they might be required to submit, provided such
discounts or losses did not exceed the rate of 15 per cent. per annum.

That the trustees of the mortgage bonds should deliver to Mr. Herman
Haupt one hundred thousand dollars in the bonds of the company in
addition to payments due for work, said bonds to be sold or hypothecated
by him, and the proceeds applied to the work. The bonds to be charged on
account of the contract if not returned when the second payment from the
State shall have been made.

1856, July 28. H. Haupt and W. A. Galbraith notified a dissolution of
the firm of Serrell, Haupt & Co., and proposed to enter into a new
contract.

E. W. Serrell notified that Messrs. Haupt and Galbraith were authorized
to surrender the old contract.

The stock subscription of Edward W. Serrell and E. W. Serrell & Co., was
transferred to H. Haupt & Co., the latter to furnish a guarantee that
the assessments due and to become due should be paid.

E. W. Serrell resigned his office as a director in the company, and was
appointed consulting engineer. W. A. Galbraith was chosen a director.

1865, July 30. A contract was made with Herman Haupt, William A.
Galbraith, C. B. Duncan and Henry Cartwright for the construction of the
road and tunnel. The firm name of the contractors was H. Haupt & Co. By
the provisions of the contract all work done under previous contracts
with E. W. Serrell or Serrell, Haupt & Co., was to be credited to H.
Haupt & Co., and all payments under said contracts were to be charged to
H. Haupt & Co., and credited to the Troy and Greenfield Railroad. "The
road from the eastern terminus at or near Greenfield from some
convenient point on the Vermont and Massachusetts line, as the same now
is or hereafter be located," is assumed to be in all about forty-two
miles in length.

"This contract includes the graduation, tunneling, masonry and bridging,
superstructure, fencing, depot buildings, switches, turn-tables, water
and fixtures, and in fine all labor and materials necessary for the
construction of the road are included in this contract." The right of
way to be provided and paid for by the railroad company. The work to be
completed and finished in the best manner, for which the Troy and
Greenfield Railroad Company agreed to pay H. Haupt & Co., "the sum of
three millions eight hundred and eighty-three thousand dollars in manner
following, to wit: Two millions of dollars in the bonds of the State of
Massachusetts, to be issued under the Act by which the credit of the
said State is loaned to said corporation, nine hundred thousand dollars
in the six per cent. mortgage bonds of said company, five hundred and
ninety-eight thousand dollars in the capital stock of said Troy and
Greenfield Railroad Company, and three hundred and eighty-two thousand
dollars in cash." The work of constructing and completing the road was
to be done in compliance with the loan Act of April, 1854. One hundred
and fifty thousand dollars to be expended by the contractors in depot
buildings and necessary rolling stock, cars, engines, &c. under the
direction of the board of directors. The stock subscription of E. W.
Serrell and of Serrell & Co., amounting to five thousand nine hundred
and eighty-seven shares, was to be transferred and assumed by Haupt &
Co., payable in compliance with said Loan Act with the understanding
that the assessments on the stock were to be paid by the performance of
this contract in stock credits as provided in the contract, and the
stock taken by the contractors at par.

This contract further provided, that on the receipt of the several
installments of State bonds, the contractors should pay to the sinking
fund the ten per cent. specified in the Loan Act, in consideration of
which Haupt & Co. should retain whatever sums was realized from the
exchange and premium on the bonds. The payments were to be made monthly,
on estimate of the company's engineer. The cost of the materials and
work upon the line, exclusive of the Hoosac Tunnel and its approaches,
was assumed to be one million eight hundred and eighty thousand dollars,
and the estimates were to be made in the relative proportion that the
part done bore "to the whole amount of materials and work to be
furnished, and done at the price named." The Hoosac Tunnel and its
approaches were estimated at two million dollars for a double track, and
the monthly estimates were to be in proportion to the amount of work
done on the approaches, and the length of tunnel excavated.

The contract further provided, that, with the assent of both parties,
the tunnel might be constructed for a single track, in which case no
abatement was to be made for the first three thousand feet; but for the
excavation beyond that point, the sum of twelve dollars per lineal foot
was to be deducted from the contract price.

The above are the essential provisions of the contract under which H.
Haupt & Co. performed their work upon the road and tunnel until February
18, 1858, except as the same was modified and changed by votes of the
directors. The contract was reported to the board of directors, and
approved by them August 6, 1856. On the same day the directors voted to
request the trustees to recognize H. Haupt & Co. as contractors, instead
of E. W. Serrell, and to issue the bonds to said H. Haupt & Co. on the
estimate of the engineer and the order of the trustees.

They also voted to change the location of the road at the West End, in
accordance with plans marked A and B.

Under date of July 10, 1857, there appears upon the records the
following:--

A preamble, "stating that the efforts to raise money f

source: Project Gutenberg · page

Cite this

Tappan Wentworth. "Report of the Hoosac Tunnel and Troy and Greenfield Railroad, by the Joint Standing Committee of 1866.". Project Gutenberg. Public domain in the USA. https://www.gutenberg.org/ebooks/40427