e01.org

Accelerated curing

Accelerated curing is any method by which high early age strength is achieved in concrete. These techniques are especially useful in the prefabrication industry, wherein high early age strength enables the removal of the formwork within 24 hours, thereby reducing the cycle time, resulting in cost-saving benefits. The most commonly adopted curing techniques are steam curing at atmospheric pressure, warm water curing, boiling water curing and autoclaving. A typical curing cycle involves a preheating stage, known as the "delay period" ranging from 2 to 5 hours; heating at the rate of 22 °C/hour or 44 °C/hour until a maximum temperature of 50−82 °C has been achieved; then maintaining at the... Source: e01 Encyclopedia. Licence: CC BY-SA 4.0.

Accelerated curing is any method by which high early age strength is achieved in concrete. These techniques are especially useful in the prefabrication industry, wherein high early age strength enables the removal of the formwork within 24 hours, thereby reducing the cycle time, resulting in cost-saving benefits. The most commonly adopted curing techniques are steam curing at atmospheric pressure, warm water curing, boiling water curing and autoclaving. A typical curing cycle involves a preheating stage, known as the "delay period" ranging from 2 to 5 hours; heating at the rate of 22 °C/hour or 44 °C/hour until a maximum temperature of 50−82 °C has been achieved; then maintaining at the maximum temperature, and finally the cooling period. The whole cycle should preferably not exceed 18 hours.

References

  1. ^ ACI 517.2 R-87, Accelerated Curing of Concrete at Atmospheric Pressure-State of the Art, ACI Manual of Concrete 1992, Revised. Wikipedia revision 1371682289, retrieved 2026-11-19 · 1795042800.0
  2. ^ Yazici, H.; Aydin, S.; Yigiter, H.; Baradan, B. (2005). "Effect of steam curing on class C high-volume fly ash concrete mixtures". Cement and Concrete Research . 35 (6): 1122– 1127. doi : 10.1016/j.cemconres.2004.08.011 . Wikipedia revision 1371682289, retrieved 2026-11-19 · 1795042800.0
  3. ^ Paya, J.; Monzo, J.; Perismora, E.; Borrachero, M.; Tercero, R.; Pinillos, C. (1995). "Early-strength development of portland cement mortars containing air classified fly ashes". Cement and Concrete Research . 25 (2): 449– 456. doi : 10.1016/0008-8846(95)00031-3 . Wikipedia revision 1371682289, retrieved 2026-11-19 · 1795042800.0
  4. ^ a b Erdem, T. (2003). "Setting time: an important criterion to determine the length of the delay period before steam curing of concrete". Cement and Concrete Research . 33 (5): 741– 050. doi : 10.1016/S0008-8846(02)01058-X . hdl : 11511/57737 . Wikipedia revision 1371682289, retrieved 2026-11-19 · 1795042800.0
  5. ^ a b c Turkel, S.; Alabas, V. (2005). "The effect of excessive steam curing on Portland composite cement concrete". Cement and Concrete Research . 35 (2): 405– 411. doi : 10.1016/j.cemconres.2004.07.038 . Wikipedia revision 1371682289, retrieved 2026-11-19 · 1795042800.0
source: e01 Encyclopedia · licence: CC BY-SA 4.0 · page · source revision

Cite this

"Accelerated curing". 1787858155. e01 Encyclopedia. CC BY-SA 4.0. https://en.wikipedia.org/w/index.php?oldid=1371682289

JSON record · API collection · BibTeX · RIS · CSL-JSON · citation policy

Save to pass ·