Acquisition Program Baseline

Acquisition Program Baseline (APB) is a term used by the United States Department of Defense to refer to a program threshold and objective values for the minimum number of cost, schedule, and performance attributes that describe the program over its life cycle. The APB initially was developed by the PM for the Milestone B decisions and contains parameters for the program such as key cost, schedule, and performance goals. Source: e01 Encyclopedia. Licence: CC BY-SA 4.0.

Acquisition Program Baseline (APB) is a term used by the United States Department of Defense to refer to a program threshold and objective values for the minimum number of cost, schedule, and performance attributes that describe the program over its life cycle. The APB initially was developed by the PM for the Milestone B decisions and contains parameters for the program such as key cost, schedule, and performance goals. ==References== ==External links== https://web.archive.org/web/20070204073933/http://www.dtic.mil/cjcs_directives/cdata/unlimit/3170_01.pdf

References

  1. ^ Cochrane, C. B. (July 2004). Joint program management handbook . Fort Belvoir, Washington : DIANE Publishing. p. 20. ISBN 0-16-073130-5 . Wikipedia revision 1146742211, retrieved 2026-11-19 · 1795042800.0
source: e01 Encyclopedia · licence: CC BY-SA 4.0 · page · source revision

Cite this

"Acquisition Program Baseline". 1679846502. e01 Encyclopedia. CC BY-SA 4.0. https://en.wikipedia.org/w/index.php?oldid=1146742211

JSON record · API collection · BibTeX · RIS · CSL-JSON · citation policy

Save to pass ·