e01.org

Artemis program

The Artemis program is a Moon exploration program led by the United States' National Aeronautics and Space Administration (NASA), aimed at returning humans to the Moon for the first time since the Apollo program and building a permanent lunar base. It was formally established via Space Policy Directive-1 in 2017 by President Donald Trump. As of 2026, it has flown two successful missions, Artemis I and Artemis II, with three more planned through the end of 2028. Among the principal elements of the Artemis program are Space Shuttle–derived hardware, such as the Space Launch System's (SLS) core stage, its RS-25 engines, and solid rocket boosters, as well as systems originating from the canceled Constellation program, including the Orion spacecraft (paired with the European Service Module) and booster upgrades initially developed for Ares V. Other elements, such as the Human Landing System (HLS), are in development by private spaceflight companies under contract. International...

The Artemis program is a Moon exploration program led by the United States' National Aeronautics and Space Administration (NASA), aimed at returning humans to the Moon for the first time since the Apollo program and building a permanent lunar base. It was formally established via Space Policy Directive-1 in 2017 by President Donald Trump. As of 2026, it has flown two successful missions, Artemis I and Artemis II, with three more planned through the end of 2028. Among the principal elements of the Artemis program are Space Shuttle–derived hardware, such as the Space Launch System's (SLS) core stage, its RS-25 engines, and solid rocket boosters, as well as systems originating from the canceled Constellation program, including the Orion spacecraft (paired with the European Service Module) and booster upgrades initially developed for Ares V. Other elements, such as the Human Landing System (HLS), are in development by private spaceflight companies under contract. International collaborations are bound by the Artemis Accords. The uncrewed Artemis I mission sent an Orion spacecraft to lunar orbit in 2022. Artemis II sent four astronauts on a lunar flyby in 2026, becoming the only crewed flight beyond low Earth orbit not part of the Apollo program. Artemis III, scheduled for late 2027, is planned to test an HLS lunar lander in Earth orbit. Artemis IV, targeted for 2028, is planned to be the first crewed lunar landing since Apollo. Beginning with Artemis V, scheduled for no earlier than late 2028, NASA intends yearly lunar landings to develop a permanent lunar base, as a step toward human missions to Mars. ==Overview== The Artemis program is organized around a series of missions of increasing complexity, intended to be spaced about a year apart. NASA and its partners have planned missions Artemis I to Artemis V, with additional missions proposed. Each numbered mission centers on launching an SLS rocket carrying an Orion spacecraft. Missions after Artemis II will also rely on support missions by other organizations and spacecraft. Artemis planners have contemplated sending to the moon an archive of cultural works, dubbed Lunar Codex, from creators across the world. The core infrastructure of Artemis consists of SLS, Orion, and the HLS. Additional program elements include the Commercial Lunar Payload Services, Exploration Ground Systems, Artemis Base Camp, the Lunar Terrain Vehicle, and spacesuit development. Certain program choices, including the use of a near-rectilinear halo orbit and long-term sustainability plans, have drawn criticism. Orion's first launch on SLS, originally scheduled for 2016, was delayed repeatedly and ultimately flew on November 16, 2022, as Artemis I, carrying mannequins and robotic payloads. The crewed Artemis II (lunar fly-by) mission flew on April 1, 2026. The future Artemis III (Earth orbit) is planned for late 2027, Artemis IV (lunar landing) for early 2028 and Artemis V (lunar landing) for late 2028. NASA plans approximately annual lunar landings thereafter. ===SLS missions=== Artemis I (November 16, 2022) was the first uncrewed test flight of the SLS, Orion, and ESM. The mission sent Orion into a polar distant retrograde lunar orbit for about six days before returning to Earth, where the capsule re-entered the atmosphere and landed in the Pacific Ocean with parachutes. Although the mission was successful overall, Orion's ablative heat shield experienced greater-than-expected erosion during reentry. Artemis II (April 1, 2026) was the first crewed test flight of SLS and Orion. The four crew members performed extensive testing of the spacecraft in high Earth orbit before Orion was boosted into a free-return trajectory around the Moon, returning to Earth for re-entry and splashdown. The mission was broadly comparable to Apollo 7 and Apollo 8, although Artemis II did not orbit the Moon and flew a more distant lunar flyby than the Apollo missions. Artemis III (late 2027) is planned to be the second crewed Artemis mission. The crew will launch aboard SLS/Orion and conduct rendezvous and docking tests in Earth orbit with one or both commercially developed lunar landers launched separately—SpaceX's Starship HLS and Blue Origin's Blue Moon—as well as test the Axiom Extravehicular Mobility Unit (AxEMU) space suit. The mission is broadly comparable to Apollo 9. Artemis IV (early 2028) is planned to be the first American crewed lunar landing since Apollo 17 in December 1972. The mission depends on a prior support flight to place a lander in lunar orbit before the launch of SLS/Orion. After arrival, astronauts will transfer to the lander for descent to the lunar surface, conduct at least two extravehicular activities (EVAs), and then return to lunar orbit for rendezvous with Orion. Orion will subsequently return the four astronauts to Earth. Launch is scheduled for 2028. Artemis V (late 2028) is planned to be the second crewed lunar landing. This mission also is when NASA is expected to begin building its Moon base. ===Early history=== The Artemis program incorporates several major components of previously canceled NASA programs and missions, including the Constellation program and the Asteroid Redirect Mission. Originally legislated by the NASA Authorization Act of 2005, as the retirement of the Space Shuttle drew near, the Constellation program included the development of the Ares I and Ares V rockets along with the Orion spacecraft. In May 2009, US president Barack Obama established the Augustine Committee to take into account several objectives including support for the International Space Station, development of missions beyond low Earth orbit (including the Moon, Mars, and near-Earth objects), and use of the commercial space industry within defined budget limits. The committee concluded that the Constellation program was massively underfunded and that a 2020 Moon landing was impossible. Constellation was subsequently suspended. On April 15, 2010, President Obama spoke at the Kennedy Space Center, announcing the administration's plans for NASA and canceling the non-Orion elements of Constellation, saying that the program was not viable. He instead proposed US$6 billion in additional funding and called for the development of a new heavy-lift rocket program to be ready for construction by 2015 with crewed missions to Mars orbit by the mid-2030s. On October 11, 2010, President Obama signed into law the NASA Authorization Act of 2010, which included requirements for the immediate development of the SLS rocket and the Orion spacecraft to support missions beyond low Earth orbit starting in 2016, while making use of the workforce, assets, and capabilities of the Space Shuttle program, Constellation program, and other NASA programs. The law also invested in space technologies and robotics capabilities tied to the overall space exploration framework, ensured continued support for Commercial Orbital Transportation Services, Commercial Resupply Services, and expanded the Commercial Crew Development program. On June 30, 2017, President Donald Trump signed an executive order to re-establish the National Space Council, chaired by Vice President Mike Pence. The administration's first budget request kept Obama-era human spaceflight programs: Commercial Resupply Services, Commercial Crew Development, the Space Launch System, and the Orion spacecraft for deep space missions, while reducing Earth science research and calling for the elimination of NASA's education office. == Missions == ===SpaceX Starship=== The SpaceX Starship system is a fully-reusable super heavy-lift Earth-launch system which is under development. It consists of a first-stage booster named Super-Heavy and a second-stage space vehicle which is generally named Starship and which will have several variants. A Starship HLS mission will use three variants: a tanker, a propellant depot, and the Starship HLS itself which will be designed only for lunar landings and takeoffs, and not for Earth landings. Some variants will be able to return to Earth for reuse. The second-stage Starships are fully self-contained spacecraft, complete with their own propulsion systems. The combined Starship system using standard Starship variants for its second stage is planned to launch crews and cargo, which may then be used to support the various developmental needs of the Artemis program, and also to support the needs of other NASA and SpaceX programs. The SpaceX Starship is also qualified to be bid for Commercial Lunar Payload Services (CLPS) launches, and in 2021 was the winning NASA bid for a crewed lunar landing. === Human Landing System (HLS)=== ==Notes== ===Sources===

References

  1. ^ Berger, Eric (March 6, 2026). "NASA has shuffled its Artemis rockets. But what of the lunar landers?" . Ars Technica . Retrieved March 28, 2026 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  2. ^ Foust, Jeff (January 20, 2022). "NASA foresees gap in lunar landings after Artemis 3" . SpaceNews . Retrieved February 2, 2022 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  3. ^ Harwood, William (May 31, 2019). "NASA moon landing: Space agency taps 3 companies for Artemis program moon missions – Astrobotic, Intuitive Machines, and Orbit Beyond" . www.cbsnews.com . Retrieved May 14, 2024 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  4. ^ Foust, Jeff (May 31, 2019). "NASA awards contracts to three companies to land payloads on the moon" . Space News . Retrieved November 26, 2022 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  5. ^ "CLPS Companies Excited for NASA's 'Opportunity Bomb' Lunar Plan" . April 2, 2026. Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  6. ^ Foust, Jeff (October 13, 2020). "Eight countries sign Artemis Accords" . SpaceNews . Archived from the original on June 15, 2024 . Retrieved February 27, 2024 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  7. ^ "Artemis Accords" . NASA . Archived from the original on June 15, 2024 . Retrieved February 27, 2024 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  8. ^ "NASA: Artemis Accords" . NASA . Archived from the original on May 16, 2020 . Retrieved May 1, 2021 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  9. ^ "Fact Sheet: Artemis Accords - United for Peaceful Exploration of Deep Space" . U.S. Embassy & Consulates in Brazil . October 20, 2020. Archived from the original on March 6, 2022 . Retrieved May 1, 2021 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  10. ^ Except the Moon Treaty , despite Australia having ratified it. The Moon Treaty only has 17 State Parties, none of which has engaged in self-launched human spaceflight. Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  11. ^ "NASA, International Partners Advance Cooperation with First Signings of Artemis Accords" . NASA . October 13, 2020. Archived from the original on October 15, 2020. Additional countries will join the Artemis Accords in the months and years ahead, as NASA continues to work with its international partners to establish a safe, peaceful, and prosperous future in space. Working with emerging space agencies, as well as existing partners and well-established space agencies, will add new energy and capabilities to ensure the entire world can benefit from the Artemis journey of exploration and discovery. Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  12. ^ Howell, Elizabeth (August 25, 2022). "Artemis Accords: Why the international moon exploration framework matters" . Space.com. Archived from the original on November 7, 2022 . Retrieved November 6, 2022 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  13. ^ "Exploration Ground Systems" . NASA . August 21, 2018 . Retrieved October 10, 2018 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  14. ^ "Exploration Ground Systems, Jacobs practice building SLS boosters in the VAB" . NASASpaceFlight.com . April 17, 2018 . Retrieved February 26, 2019 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  15. ^ Sloss, Philip (September 11, 2018). "NASA updates Lunar Gateway plans" . NASASpaceFlight.com. Archived from the original on March 11, 2026 . Retrieved October 17, 2018 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  16. ^ One or more of the preceding sentences incorporates text from this source, which is in the public domain : Aguiar, Laura (June 14, 2019). "NASA to Partner with American Industry to Supply Artemis Moon Missions" (Press release). NASA. Archived from the original on August 21, 2019 . Retrieved August 28, 2019 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  17. ^ One or more of the preceding sentences incorporates text from this source, which is in the public domain : Potter, Sean (March 27, 2020). "NASA Awards Artemis Contract for Gateway Logistics Services" . NASA . Archived from the original on March 27, 2020 . Retrieved March 28, 2020 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  18. ^ Smith, Marcia (May 26, 2021). "Nelson: "Watch the Chinese" " . SpacePolicyOnline.com . Archived from the original on May 26, 2021 . Retrieved May 26, 2021 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  19. ^ Foust, Jeff (March 13, 2019). "NASA considering flying Orion on commercial launch vehicles" . Space News . Retrieved November 11, 2022 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  20. ^ Berger, Eric (April 8, 2024). "Elon Musk just gave another Mars speech—this time the vision seems tangible" . Ars Technica . Retrieved December 31, 2024 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  21. ^ requires refueling in LEO Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  22. ^ Per launch. May require refueling launches Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  23. ^ An Orion capsule was flown in 2014 , but not the entire Orion spacecraft. Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  24. ^ "Blue Origin launches New Glenn rocket from Cape Canaveral Space Force Station in Florida" . Florida Today . Retrieved January 16, 2025 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  25. ^ Rep. Ryan, Tim [D-OH-13 (August 9, 2022). "Text - H.R.4346 - 117th Congress (2021-2022): CHIPS and Science Act" . www.congress.gov . Retrieved October 24, 2026 . {{ cite web }} : CS1 maint: numeric names: authors list ( link ) Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  26. ^ The Soviet N-1 rocket produced 45.7 MN and was also designed to carry humans to the Moon, but was never flown manned. SpaceX Starship is also planned to carry humans, and has demonstrated liftoff thrust exceeding 70 MN. [ citation needed ] Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  27. ^ Sauers, Elisha (January 17, 2026). "Is SLS still the most powerful rocket? 5 facts as Artemis 2 rolls out" . Mashable . Retrieved April 15, 2026 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  28. ^ Foust, Jeff (June 13, 2026). "Revised Artemis lunar lander plans take shape" . SpaceNews . Retrieved June 15, 2026 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  29. ^ " "Artemis mission plan" " . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  30. ^ "SpaceX" . SpaceX . Retrieved December 12, 2022 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  31. ^ "Starship Users Guide V1.0" (PDF) . SpaceX . March 2020. Archived from the original (PDF) on November 18, 2022. Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  32. ^ "NASA Identifies Candidate Regions for Landing Next Americans on Moon" . The National Aeronautics and Space Administration . Retrieved May 21, 2024 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  33. ^ "NASA Selects Companies to Advance Moon Mobility for Artemis Missions" . NASA . Retrieved April 3, 2024 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  34. ^ Foust, Jeff (April 15, 2024). "NASA document outlines selection of lunar rover companies" . SpaceNews . Retrieved April 15, 2024 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  35. ^ David, Leonard (July 1, 2022). "Where will NASA set up its moon base?" . Space.com . Retrieved May 12, 2024 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  36. ^ "Artemis Plan – NASA's Lunar Exploration Program Overview" (PDF) . NASA. September 2020 . Retrieved November 10, 2022 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  37. ^ "Living on the Moon: Inside Artemis' Foundation Habitat" . AmericaSpace . January 13, 2024 . Retrieved June 16, 2024 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  38. ^ Nardi, Tom (December 4, 2023). "Italy Proposes Minimalist Lunar Outpost For Artemis" . Hackaday . Retrieved June 16, 2024 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  39. ^ "NASA to seek ideas for an Artemis lunar rover" . SpaceNews . November 20, 2019 . Retrieved June 26, 2022 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  40. ^ One or more of the preceding sentences incorporates text from this source, which is in the public domain : "Three Days in the Desert Tests Lunar 'RV' " . Nasa.gov . Archived from the original on July 26, 2020 . Retrieved January 24, 2020 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  41. ^ Berger, Eric (July 15, 2020). "NASA's first lunar habitat may be an RV-like rover built by Toyota" . Ars Technica . Archived from the original on July 15, 2020 . Retrieved July 16, 2020 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  42. ^ Bullard, Benjamin (July 15, 2020). "NASA eyes closed-cabin rover 'like an RV for the Moon' in first step toward long-term lunar presence" . Syfy . Archived from the original on August 12, 2020 . Retrieved July 16, 2020 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  43. ^ "NASA, Japan Advance Space Cooperation, Sign Agreement for Lunar Rover" (Press release). NASA. Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  44. ^ "Orion Suit Equipped to Expect the Unexpected on Artemis Missions - NASA" . October 15, 2019 . Retrieved April 9, 2026 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  45. ^ Jacobs, Shane; Green, Daniel; Deane, Nicholas; Tufts, Donald (July 2024). "Orion Crew Survival System Suit (OCSS) Development Update" . International Conference on Environmental Systems – via Texas Tech University Library. Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  46. ^ Friedman, Vanessa (March 31, 2026). "Why the Artemis II Astronauts Will Be Wearing Orange" . The New York Times . ISSN 0362-4331 . Retrieved April 10, 2026 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  47. ^ Howell, Elizabeth (June 1, 2022). "NASA just picked these 2 companies to build next-gen spacesuits for the moon, space station" . Space.com . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  48. ^ Foust, Jeff (June 26, 2024). "Collins Aerospace pulls back from NASA spacesuit contract" . SpaceNews . Retrieved March 4, 2026 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  49. ^ Howell, Elizabeth (January 23, 2024). "Artemis moon spacesuits prepped for tests ahead of delayed 2026 lunar landing" . Space.com . Retrieved May 2, 2024 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  50. ^ Boyer, Charles (April 29, 2024). "Axiom Space Tests Lunar EVA Suit At Neutral Buoyancy Lab In Houston" . Talk of Titusville . Retrieved May 2, 2024 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  51. ^ Ugalde, Victoria (February 12, 2026). "NASA Moon Mission Spacesuit Nears Milestone" . NASA . Retrieved March 4, 2026 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  52. ^ Whittington, Mark (June 16, 2018). "NASA's unnecessary US$504 million lunar orbit project doesn't help us get back to the Moon" . The Hill . Archived from the original on November 14, 2019 . Retrieved December 20, 2018 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  53. ^ "Moon Direct" . The New Atlantis . April 28, 2021. Archived from the original on April 28, 2021 . Retrieved June 26, 2022 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  54. ^ "At Least 15 Starship Launches Needed to Execute Artemis III Lunar Landing" . SpacePolicyOnline.com . Retrieved December 30, 2023 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  55. ^ Foust, Jeff [@jeff_foust] (January 9, 2024). "Best part of the just-completed briefing: question about how many refueling launches will be needed for Starship HLS missions. NASA and SpaceX give a long answer without a number. Bill Nelson steps in, asks for that number. ['Ten-ish' says SpaceX's Jensen.]" ( Tweet ) . Retrieved January 10, 2024 – via X (formerly Twitter) . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  56. ^ Isaacman, Jared [@NASAAdmin] (March 3, 2026). "Endeavoring for not just one, but TWO Moon landings in 2028. Coming weeks: Artemis II around the Moon. Mid-2027: Artemis III rendezvousing with one or both HLS providers, testing space suits in low Earth orbit. Early 2028: Artemis IV lunar landing. Late 2028: Artemis V lunar landing, beginning work on lunar base. This is how we get back to the Moon with urgency, to stay" ( Tweet ) . Retrieved March 3, 2026 – via X (formerly Twitter) . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  57. ^ Foust, Jeff (July 21, 2019). "NASA outlines plans for lunar lander development through commercial partnerships" . SpaceNews . Retrieved July 17, 2020 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  58. ^ Moskowitz, Clara (January 7, 2011). "NASA Stuck in Limbo as New Congress Takes Over" . Space.com. Archived from the original on October 22, 2020 . Retrieved October 19, 2020 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  59. ^ One or more of the preceding sentences incorporates text from this source, which is in the public domain : Bonilla, Dennis (September 8, 2009). "Charter of the Review of U.S. Human Space Flight Plans Committee" . NASA. Archived from the original on April 8, 2021 . Retrieved September 9, 2009 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
  60. ^ Amos, Jonathan (October 11, 2010). "Obama signs Nasa up to new future" . BBC News . Archived from the original on September 26, 2020 . Retrieved September 30, 2020 . Wikipedia revision 1378556685, retrieved 2026-11-21 · 1795215600.0
source: e01 Encyclopedia · licence: CC BY-SA 4.0 · page · source revision

Cite this

"Artemis program". 1791153240. e01 Encyclopedia. CC BY-SA 4.0. https://en.wikipedia.org/w/index.php?oldid=1378556685

JSON record · API collection · citation policy