Central Interceptor

The Central Interceptor is a diameter wastewater tunnel beneath the central isthmus in Auckland, New Zealand. It carries sewage from parts of the city to the Māngere Wastewater Treatment Plant. The construction of the sewer tunnel began in 2019 and it was in service by mid 2026. The tunnel is described as the backbone of the Auckland sewer system. The project was undertaken by Watercare Services.

The Central Interceptor is a diameter wastewater tunnel beneath the central isthmus in Auckland, New Zealand. It carries sewage from parts of the city to the Māngere Wastewater Treatment Plant. The construction of the sewer tunnel began in 2019 and it was in service by mid 2026. The tunnel is described as the backbone of the Auckland sewer system. The project was undertaken by Watercare Services. ==Construction== The construction contract was signed in March 2019 with the Ghella-Abergeldie Joint Venture. Construction was initially expected to run from 2019 to 2024. Construction will be via a tunnel boring machine. Sixteen access shafts, up to deep, will be constructed. The route will take the tunnel underneath the Manukau Harbour, although in other areas it will be as much as below ground level, due to significant elevation changes on the isthmus. In May 2021, Watercare reported that the project was eight months into what was expected to be a five-year construction period. A long tunnel boring machine had been delivered and was being prepared for service, which was gifted a name by local school children: Hiwa-i-te-rangi. ==References==

References

  1. ^ Walton, Felix (20 July 2026). "Auckland's $1.6 billion sewer pipe up and running" . RNZ . Wikipedia revision 1366904970, retrieved 2026-11-18 · 1794956400.0
  2. ^ "New Tunnelling Extension to Enhance Wastewater Management on Watercare's Central Interceptor" . Ghella . Retrieved 14 August 2025 . Wikipedia revision 1366904970, retrieved 2026-11-18 · 1794956400.0
  3. ^ "Black alert at 11 Auckland beaches due to wastewater overflows" . RNZ . 27 January 2023 . Retrieved 27 January 2023 . Wikipedia revision 1366904970, retrieved 2026-11-18 · 1794956400.0
  4. ^ Clarke, Jennie (2018). "100 not out". EG (4): 32. Wikipedia revision 1366904970, retrieved 2026-11-18 · 1794956400.0
  5. ^ Ternouth, Louise (28 May 2021). "New pipeline to make Auckland's polluted beaches a thing of the past" . RNZ . Retrieved 1 June 2021 . Wikipedia revision 1366904970, retrieved 2026-11-18 · 1794956400.0
  6. ^ a b c "Central Interceptor: Auckland's new $1.2 billion sewer tunnel to clean up beaches" . The New Zealand Herald . 14 March 2019 . Retrieved 31 March 2019 . Wikipedia revision 1366904970, retrieved 2026-11-18 · 1794956400.0
  7. ^ a b c Tapped In (newsletter) . Watercare. Autumn 2019. Wikipedia revision 1366904970, retrieved 2026-11-18 · 1794956400.0
source: e01 Encyclopedia · licence: CC BY-SA 4.0 · page · source revision

Cite this

"Central Interceptor". 1785438520. e01 Encyclopedia. CC BY-SA 4.0. https://en.wikipedia.org/w/index.php?oldid=1366904970

JSON record · API collection · BibTeX · RIS · CSL-JSON · citation policy

Save to pass ·