In operations research, the makespan of a project is the length of time that elapses from the start of work to the end. This type of multi-mode resource constrained project scheduling problem (MRCPSP) seeks to create the shortest logical project schedule, by efficiently using project resources, adding the lowest number of additional resources as possible to achieve the minimum makespan. The term commonly appears in the context of scheduling.
In operations research, the makespan of a project is the length of time that elapses from the start of work to the end. This type of multi-mode resource constrained project scheduling problem (MRCPSP) seeks to create the shortest logical project schedule, by efficiently using project resources, adding the lowest number of additional resources as possible to achieve the minimum makespan. The term commonly appears in the context of scheduling. ==References==
References
- ^ Afshar-Nadjafi, Behrouz (2018). "A solution procedure for preemptive multi-mode project scheduling problem with mode changeability to resumption" . Applied Computing and Informatics . 14 (2): 192– 201. doi : 10.1016/j.aci.2014.02.003 . S2CID 62145189 . Wikipedia revision 1355385937, retrieved 2026-11-19 · 1795042800.0
- ^ Mu'alem A (2014). "Fair by design: Multidimensional envy-free mechanisms". Games and Economic Behavior . 88 : 29– 46. doi : 10.1016/j.geb.2014.08.001 . Wikipedia revision 1355385937, retrieved 2026-11-19 · 1795042800.0
Cite this
"Makespan". 1779368689. e01 Encyclopedia. CC BY-SA 4.0. https://en.wikipedia.org/w/index.php?oldid=1355385937 JSON record · API collection · BibTeX · RIS · CSL-JSON · citation policy