e01.org

Use case points

Use case points (UCP or UCPs) is a software estimation technique used to forecast the software size for software development projects. UCP is used when the Unified Modeling Language (UML) and Rational Unified Process (RUP) methodologies are being used for the software design and development. The concept of UCP is based on the requirements for the system being written using use cases, which is part of the UML set of modeling techniques. The software size (UCP) is calculated based on elements of the system use cases with factoring to account for technical and environmental considerations. The UCP for a project can then be used to calculate the estimated effort for a project. Source: e01 Encyclopedia. Licence: CC BY-SA 4.0.

Use case points (UCP or UCPs) is a software estimation technique used to forecast the software size for software development projects. UCP is used when the Unified Modeling Language (UML) and Rational Unified Process (RUP) methodologies are being used for the software design and development. The concept of UCP is based on the requirements for the system being written using use cases, which is part of the UML set of modeling techniques. The software size (UCP) is calculated based on elements of the system use cases with factoring to account for technical and environmental considerations. The UCP for a project can then be used to calculate the estimated effort for a project. UUCW = (Total No. of Simple Use Cases x 5) + (Total No. Average Use Cases x 10) + (Total No. Complex Use Cases x 15) UAW = (Total No. of Simple actors x 1) + (Total No. Average actors x 2) + (Total No. Complex actors x 3) TCF = 0.6 + (TF/100) ECF = 1.4 + (-0.03 x EF) UCP = (UUCW + UAW) x TCF x ECF UUCW = (Total No. of Simple Use Cases x 5) + (Total No. Average Use Cases x 10) + (Total No. Complex Use Cases x 15) For the Online Shopping System, the UUCW = (2 x 5) + (3 x 10) + (4 x 15) = 100 UUCW = 100 UAW = (Total No. of Simple Actors x 1) + (Total No. Average Actors x 2) + (Total No. Complex Actors x 3) For the Online Shopping System, UAW = (1 x 1) + (0 x 2) + (4 x 3) = 13 UAW = 13 TCF = 0.6 + (TF/100) For the Online Shopping System, TCF = 0.6 + (42/100) = 1.02 TCF = 1.02 ECF = 1.4 + (-0.03 x EF) For the Online Shopping System, ECF = 1.4 + (-0.03 * 10.5) = 1.085 ECF = 1.085 UCP = (UUCW + UAW) x TCF x ECF For the Online Shopping System, UCP = (100 + 13) x 1.02 x 1.085 = 125.06 UCP = 125.06 For the Online Shopping System, the total estimated size to develop the software is 125.06 Use Case Points. Now that the size of the project is known, the total effort for the project can be estimated. For the Online Shopping System example, 28 man hours per use case point will be used. Estimated Effort = UCP x Hours/UCP For the Online Shopping System, Estimated Effort = 125.06 x 28 Estimated Effort = 3501 Hours ==References== ==External links== Advantages of Function Point Analysis in relation to Use Case Points Use Case Points - An Estimation Approach Estimating Software Via Use Cases Improving Consistency of Use Case Points Estimates Clemmons, Roy K. “Project Estimation With Use Case Points.” CrossTalk Feb. 2006

source: e01 Encyclopedia · licence: CC BY-SA 4.0 · page · source revision

Cite this

"Use case points". 1757979081. e01 Encyclopedia. CC BY-SA 4.0. https://en.wikipedia.org/w/index.php?oldid=1311611681

JSON record · API collection · BibTeX · RIS · CSL-JSON · citation policy

Save to pass ·